CHAPTER IIISPECIFIC PROVISIONS FOR DIFFERENT CATEGORIES OF AID
SECTION 7 Aid for environmental protection
Article 40Investment aid for high-efficiency cogeneration
1.
Investment aid for high-efficiency cogeneration shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
2.
The investment aid shall be granted in respect of newly installed or refurbished capacities only.
3.
4.
The eligible costs shall be the extra investment costs for the equipment needed for the installation to operate as a high-efficiency cogeneration installation, compared to conventional electricity or heating installations of the same capacity or the extra investment cost to upgrade to a higher efficiency when an existing installation already meets the high-efficiency threshold.
5.
The aid intensity shall not exceed 45 % of the eligible costs. The aid intensity may be increased by 20 percentage points for aid granted to small undertakings and by 10 percentage points for aid granted to medium-sized undertakings.
6.
The aid intensity may be increased by 15 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(a) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(c) of the Treaty.