Commission Regulation (EU) No 651/2014 of 17 June 2014 declaring certain categories of aid compatible with the internal market in application of Articles 107 and 108 of the Treaty (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
This is the original version as it was originally adopted in the EU.
This legislation may since have been updated - see the latest available (revised) version
1.Operating aid for the promotion of electricity from renewable energy sources shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.
2.Aid shall be granted in a competitive bidding process on the basis of clear, transparent and non-discriminatory criteria which shall be open to all generators producing electricity from renewable energy sources on a non-discriminatory basis.
3.The bidding process can be limited to specific technologies where a process open to all generators would lead to a suboptimal result which cannot be addressed in the process design in view of in particular:
the longer-term potential of a given new and innovative technology; or
the need to achieve diversification; or
network constraints and grid stability; or
system (integration) costs; or
the need to avoid distortions on the raw material markets from biomass support
Member States shall carry out a detailed assessment of the applicability of such conditions and report it to the Commission according to the modalities described in Article 11 (a).
4.Aid shall be granted to new and innovative renewable energy technologies in a competitive bidding process open to at least one such technology on the basis of clear, transparent and non-discriminatory criteria. Such aid shall not be granted for more than 5 % of the planned new electricity capacity from renewable energy sources per year in total.
5.Aid shall be granted as a premium in addition to the market price whereby the generators sell their electricity directly in the market.
6.Aid beneficiaries shall be subject to standard balancing responsibilities. Beneficiaries may outsource balancing responsibilities to other undertakings on their behalf, such as aggregators.
7.Aid shall not be granted when prices are negative.
8.Aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 1 MW for the production of electricity from all renewable sources except for wind energy, where aid may be granted in the absence of a competitive bidding process as described in paragraph 2 to installations with an installed electricity capacity of less than 6 MW or to installations with less than 6 generation units. Without prejudice to paragraph 9, when aid is granted in the absence of a competitive bidding process, the conditions under paragraphs 5, 6 and 7 shall be respected. In addition, when aid is granted in the absence of a competitive bidding process, the conditions under Article 43 paragraphs 5, 6 and 7 shall be applicable.
9.The conditions under paragraphs 5, 6 and 7 shall not apply to operating aid granted to installations with an installed electricity capacity of less than 500 kW for the production of electricity from all renewable sources except for wind energy, where these conditions shall not apply to operating aid granted to installations with an installed electricity capacity of less than 3 MW or to installations with less than 3 generation units.
10.For the purpose of calculating the above maximum capacities referred to in paragraphs 8 and 9, installations with a common connection point to the electricity grid shall be considered as one installation.
11.Aid shall only be granted until the plant generating the electricity from renewable sources has been fully depreciated according to generally accepted accounting principles. Any investment aid previously received must be deducted from the operating aid.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: