CHAPTER IIISPECIFIC PROVISIONS FOR DIFFERENT CATEGORIES OF AID

SECTION 7Aid for environmental protection

Article 46Investment aid for energy efficient district heating and cooling

1

Investment aid for the installation of energy efficient district heating and cooling system shall be compatible with the internal market within the meaning of Article 107(3) of the Treaty and shall be exempted from the notification requirement of Article 108(3) of the Treaty, provided that the conditions laid down in this Article and in Chapter I are fulfilled.

2

The eligible costs for the production plant shall be the extra costs needed for the construction, expansion and refurbishment of one or more generation units to operate as an energy efficient district heating and cooling system compared to a conventional production plant. The investment shall be an integral part of the energy efficient district heating and cooling system.

3

The aid intensity for the production plant shall not exceed 45 % of the eligible costs. The aid intensity may be increased by 20 percentage points for aid granted to small undertakings and by 10 percentage points for aid granted to medium-sized undertakings.

4

The aid intensity for the production plant may be increased by 15 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(a) of the Treaty and by 5 percentage points for investments located in assisted areas fulfilling the conditions of Article 107(3)(c) of the Treaty.

5

The eligible costs for the distribution network shall be the investment costs.

6

The aid amount for the distribution network shall not exceed the difference between the eligible costs and the operating profit. The operating profit shall be deducted from the eligible costs ex ante or through a claw-back mechanism.