- Latest available (Revised)
- Original (As adopted by EU)
Commission Regulation (EU) 2016/1447 of 26 August 2016 establishing a network code on requirements for grid connection of high voltage direct current systems and direct current-connected power park modules (Text with EEA relevance)
When the UK left the EU, legislation.gov.uk published EU legislation that had been published by the EU up to IP completion day (31 December 2020 11.00 p.m.). On legislation.gov.uk, these items of legislation are kept up-to-date with any amendments made by the UK since then.
Legislation.gov.uk publishes the UK version. EUR-Lex publishes the EU version. The EU Exit Web Archive holds a snapshot of EUR-Lex’s version from IP completion day (31 December 2020 11.00 p.m.).
This is the original version as it was originally adopted in the EU.
This legislation may since have been updated - see the latest available (revised) version
Synchronous Area | Voltage Range | Time period for operation |
---|---|---|
Continental Europe | 0,85 pu-1,118 pu | Unlimited |
1,118 pu-1,15 pu | To be established by each relevant system operator, in coordination with the relevant TSO but not less than 20 minutes | |
Nordic | 0,90 pu-1,05 pu | Unlimited |
1,05 pu-1,10 pu | 60 minutes | |
Great Britain | 0,90 pu-1,10 pu | Unlimited |
Ireland and Northern Ireland | 0,90 pu-1,118 pu | Unlimited |
Baltic | 0,85 pu-1,118 pu | Unlimited |
1,118 pu-1,15 pu | 20 minutes |
Table 4: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values at or above 110 kV and up to (not including) 300 kV.
Synchronous Area | Voltage Range | Time period for operation |
---|---|---|
Continental Europe | 0,85 pu-1,05 pu | Unlimited |
1,05 pu-1,0875 pu | To be specified by each TSO, but not less than 60 minutes | |
1,0875 pu-1,10 pu | 60 minutes | |
Nordic | 0,90 pu-1,05 pu | Unlimited |
1,05 pu-1,10 pu | To be specified by each TSO, but not more than 60 minutes | |
Great Britain | 0,90 pu-1,05 pu | Unlimited |
1,05 pu-1,10 pu | 15 minutes | |
Ireland and Northern Ireland | 0,90 pu-1,05 pu | Unlimited |
Baltic | 0,88 pu-1,097 pu | Unlimited |
1,097 pu-1,15 pu | 20 minutes |
Table 5: Minimum time periods an HVDC system shall be capable of operating for voltages deviating from the reference 1 pu value at the connection points without disconnecting from the network. This table applies in case of pu voltage base values from 300 kV to 400 kV (included).
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As adopted by EU): The original version of the legislation as it stood when it was first adopted in the EU. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: