TITLE IVCOMPLIANCE
CHAPTER 6Compliance simulations for power park modules
Article 56Compliance simulations for type D power park modules
1
In addition to the compliance simulations for type B and C power park modules set out in Articles 54 and 55, except for the fault-ride-through capability of type B power park modules referred to in Article 54(4), type D power park modules are subject to the fault-ride-through capability of power park modules compliance simulation.
2
Instead of all or part of the simulations mentioned in paragraph 1, the power-generating facility owner may use equipment certificates issued by an authorised certifier, which must be provided to the relevant system operator.
3
The model of the power park module shall demonstrate that it is suitable for simulating the fault-ride-through capability in accordance with point (a) of Article 16(3).
4
The simulation shall be deemed successful if the model demonstrates compliance with the conditions set out in point (a) of Article 16(3).