7.Regional sizing of reserve capacityU.K.

7.1Regional coordination centres shall calculate the reserve capacity requirements for the system operation region. The determination of reserve capacity requirements shall:U.K.

(a)

pursue the general objective to maintain operational security in the most cost effective manner;

(b)

be performed at the day-ahead or intraday timeframe, or both;

(c)

calculate the overall amount of required reserve capacity for the system operation region;

(d)

determine minimum reserve capacity requirements for each type of reserve capacity;

(e)

take into account possible substitutions between different types of reserve capacity with the aim to minimise the costs of procurement;

(f)

set out the necessary requirements for the geographical distribution of required reserve capacity, if any.