Search Legislation

The Packaging, Labelling and Carriage of Radioactive Material by Rail Regulations 1996

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

More Resources

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

  1. Introductory Text

  2. PART I INTERPRETATION AND APPLICATION

    1. 1.Citation, commencement and interpretation

    2. 2.Application

  3. PART II: APPROVED DOCUMENT

    1. 3.Approved Document

    2. 4.Duties in relation to the Approved Document

  4. PART III: APPROVALS

    1. 5.Approval of design for special form radioactive material

    2. 6.Approval of Type B(U) package designs

    3. 7.Approval of Type B(M) package designs

    4. 8.Approval of package designs for fissile material

    5. 9.Saving and transitional provision for designs approved under earlier international regulations or under previous regulations

    6. 10.Approval of shipments under special arrangement

    7. 11.Approval of other shipments

  5. PART IV: PACKAGING REQUIREMENTS

    1. 12.Quality assurance programmes

    2. 13.Testing

    3. 14.Notification and registration of serial numbers

    4. 15.Package inspection prior to shipment

    5. 16.Notification of shipment

  6. PART V: GENERAL CARRIAGE PROHIBITIONS AND OPERATING REQUIRE MENTS

    1. 17.General prohibitions

    2. 18.Suitability of freight containers, tank containers, tank wagons and wagons

    3. 19.Contents limits

    4. 20.Transport Index limits

    5. 21.Activity limits

    6. 22.Radiation level limits

    7. 23.Contamination level limits

    8. 24.Carriage in tanks

    9. 25.Prohibition on over-filling tank containers and tank wagons

    10. 26.Openings, valves and caps of tank containers and tank wagons to be securely closed

    11. 27.Carriage in bulk

  7. PART VI: LOADING AND UNLOADING

    1. 28.Prohibition of mixed loading and segregation of radioactive material

    2. 29.Loading, stowage and unloading of radioactive material

  8. PART VII: SECURITY MEASURES AND EMERGENCY ARRANGEMENTS

    1. 30.Safe carriage and security

    2. 31.Marshalling and formation of trains

    3. 32.Prevention of fire, explosion and leakage

    4. 33.Emergency arrangements

  9. PART VIII: INFORMATION

    1. 34.Information to be displayed during carriage

    2. 35.Information to be compiled and provided by consignors

    3. 36.Carriage Information to be provided by operators

    4. 37.Keeping of Carriage Information

    5. 38.Keeping of other information

    6. 39.Information, instruction and training for train crews and other persons connected with the carriage of radioactive material

  10. PART IX:MISCELLANEOUS

    1. 40.Evaluation of radiation emissions

    2. 41.Exemption certificates

    3. 42.Defence

    4. 43.International provisions

    5. 44.Transitional defence

  11. Signature

    1. SCHEDULE 1

      COMPETENT AUTHORITY IDENTIFICATION MARKS

      1. 1.Each approval certificate issued by a competent authority shall be...

      2. 2.The mark shall be of the following generalised type— “VRI/Number/Type...

      3. 3.The shipment approval identification mark shall be clearly related to...

      4. 4.For package design approval certificates, other than those issued under...

    2. SCHEDULE 2

      APPLICATION FOR APPROVAL OF DESIGN FOR SPECIAL FORM RADIOAC TIVE MATERIAL

    3. SCHEDULE 3

      APPLICATION FOR APPROVAL OF TYPE B(U) PACKAGE DESIGN

    4. SCHEDULE 4

      APPLICATION FOR APPROVAL OF TYPE B(M) PACKAGE DESIGN

    5. SCHEDULE 5

      APPLICATION FOR APPROVAL OF PACKAGE DESIGN FOR FISSILE MA TERIAL

    6. SCHEDULE 6

      APPLICATION FOR APPROVAL OF SHIPMENT UNDER SPECIAL ARRANGE MENT

    7. SCHEDULE 7

      APPLICATION FOR APPROVAL OF SHIPMENT

    8. SCHEDULE 8

      PACKAGE INSPECTION REQUIREMENTS PRIOR TO FIRST SHIPMENT

    9. SCHEDULE 9

      PACKAGE INSPECTION REQUIREMENTS PRIOR TO ANY SHIPMENT

    10. SCHEDULE 10

      NOTIFICATION OF SHIPMENT TO COMPETENT AUTHORITY

    11. SCHEDULE 11

      RADIATION LEVEL LIMITS FOR CONSIGNMENTS UNDER EXCLUSIVE USE

    12. SCHEDULE 12

      LOADING, STOWAGE AND UNLOADING OF RADIOACTIVE MATERIAL

      1. 1.Packages and overpacks carried in a freight container or wagon...

      2. 2.A package or overpack may be carried among packaged general...

      3. 3.In the case of a shipment under special arrangement,

      4. 4.Type B(U) and Type B(M) packages

      5. 5.Subject to paragraphs 6 and 7 below, the maximum temperature...

      6. 6.Where the maximum temperature of any accessible surface of a...

      7. 7.When determining the maximum temperatures referred to in paragraphs 5...

    13. SCHEDULE 13

      INFORMATION TO BE DISPLAYED DURING CARRIAGE

      1. PART I PACKAGES AND OVERPACKS

        1. 1.Paragraphs 2 to 11 shall apply to packages, other than...

        2. 2.Common provisions

        3. 3.(1) Subject to sub-paragraph (5) below, the following information shall...

        4. 4.Where the package or overpack contains any radioactive material listed...

        5. 5.Each package shall be legibly and durably marked with the...

        6. 6.Special provisions

        7. 7.Each TYPE A PACKAGE containing radioactive material other than fissile...

        8. 8.Each TYPE B(U) PACKAGE and each TYPE B(M) PACKAGE containing...

        9. 9.Each package and overpack containing fissile material shall be legibly...

        10. 10.Where an excepted package contains radioactive material of limited activity,...

        11. 11.Where an excepted package contains any instrument or article (other...

      2. PART II FREIGHT CONTAINERS, TANK CONTAINERS, TANK WAGONS AND WAGONS

        1. 12.Interpretation

        2. 13.Common provisions

        3. 14.(1) Subject to sub-paragraph (5) below, the following information shall...

        4. 15.(1) Subject to paragraph 17, danger signs conforming to figure...

        5. 16.The following information shall be legibly and durably marked on...

        6. 17.The danger signs referred to in paragraph 15 need not...

        7. 18.Special provisions

        8. 19.Where the freight container, tank container, tank wagon or wagon...

        9. 20.The provisions of this Part of this Schedule shall not...

      3. PART III SYMBOLS, SIGNS AND PANELS

    14. SCHEDULE 14

      CARRIAGE INFORMATION

      1. 1.Subject to paragraph 2 below, the Carriage Information shall comprise,...

      2. 2.The Carriage Information for excepted packages shall comprise—

      3. 3.A facsimile signature on the consignor’s declaration is permitted in...

  12. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources