Search Legislation

The Merchant Shipping (Cargo Ship Construction) Regulations 1997

 Help about what version

What Version

 Help about opening options

Opening Options

More Resources

Changes to legislation:

There are currently no known outstanding effects for the The Merchant Shipping (Cargo Ship Construction) Regulations 1997. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. PART I GENERAL

    1. 1.Citation, commencement and revocation

    2. 2.Interpretation

    3. 3.Exemptions

    4. 4.Application

    5. 5.Approved standards

  3. PART II CONSTRUCTION—ALL SHIPS

    1. 6.Structural strength

    2. 7.Peak and machinery space bulkheads and stern tubes Requirements for ships constructed on or after 1st September 1984

    3. 8.Construction and testing of watertight bulkheads, decks and inner bottoms Requirements for ships constructed on or after 1st September 1984

    4. 9.Construction and testing of watertight decks, trunks, tunnels, duct keels and ventilators Requirements for ships constructed on or after 1st September 1984

    5. 10.Watertight doors

    6. 11.Tests of watertight doors Requirements for ships constructed on or after 1st September 1984

    7. 12.Ballast and bilge pumping and drainage arrangements

    8. 12A.Openings in the shell plating below the freeboard deck Requirements for ships constructed on or after 1st July 1998

  4. PART III STABILITY OF SHIPS OF 80 METRES OR OVER

    1. 13.Interpretation

    2. 14.Application

    3. 15.Subdivision indices

    4. 16.Stability information

    5. 17.Openings in watertight bulkheads and internal decks

    6. 18.External openings

  5. PART IV DOUBLE BOTTOMS IN SHIPS OTHER THAN TANKERS

    1. 19.Requirements for ships (other than tankers) constructed on or after 1st February 1992

  6. PART V DAMAGE CONTROL IN DRY CARGO SHIPS

    1. 20.Requirements for dry cargo ships constructed on or after 1st February 1992

  7. PART VI CONSTRUCTION—TANKERS

    1. 21.General

    2. 22.Location and separation of spaces

    3. 23.Cargo tank ventilation Requirements for tankers constructed on or after 1st September 1984

    4. 24.Ventilation of pump rooms and other enclosed spaces Requirements for tankers constructed on or after 25th May 1980

    5. 25.Inerting, ventilation and gas measurement Requirements for tankers constructed on or after 1st October 1994

    6. 26.Access to spaces in the cargo tank area of oil tankers Requirements for oil tankers constructed on or after 1st October 1994

  8. PART VII MACHINERY INSTALLATION

    1. 27.General

    2. 28.Machinery

    3. 29.Means of manoeuvring and going astern

    4. 30.Boilers and other pressure vessels

    5. 31.Boiler feed systems

    6. 32.Steam pipe systems

    7. 33.Air pressure systems

    8. 34.Cooling water systems

    9. 35.Oil and gaseous fuel installations

    10. 36.Lubricating and other oil systems

    11. 37.Remote control of propulsion machinery from the navigation bridge

    12. 38.Steering gear

    13. 39.Ventilating systems in machinery spaces Requirements for ships constructed on or after 1st September 1984

    14. 40.Protection against noise Requirements for ships constructed on or after 1st September 1984

    15. 41.Communication between navigating bridge and machinery space

    16. 42.Engineers’ alarm Requirements for ships constructed on or after 1st September 1984

    17. 43.Spare gear

    18. 44.Periodically unattended machinery spaces Requirements for ships constructed on or after 1st May 1981

    19. 45.Closing of openings Requirements for tankers constructed on or after 25th May 1980 and to other ships constructed on or after 1st September 1984.

  9. PART VII ELECTRICAL INSTALLATIONS

    1. 46.General

    2. 47.Main source of electrical power and main switchboard

    3. 48.Lighting systems Requirements for ships constructed on or after 1st September 1984

    4. 49.Emergency and transitional sources of electrical power and emergency switchboards

    5. 50.Location and construction of cables Requirements for ships constructed on or after 1st September 1984

    6. 51.General precautions against shock, fire and other hazards Requirements for ships constructed on or after 26th May 1965

    7. 52.Electrical equipment in hazardous areas and spaces Requirements for ships constructed on or after 1st September 1984

  10. PART IX MISCELLANEOUS

    1. 53.Anchors, anchor handling equipment and chain cables

    2. 54.Emergency towing arrangements

    3. 54A.Safe access to tanker bows

    4. 54B.Corrosion prevention of seawater ballast tanks Requirements for oil tankers and bulk carriers constructed on or after 1st July 1998

    5. 54C.Combustible gas indicators

    6. 55.Materials used in construction Requirements for ships constructed on or after 1st September 1984

    7. 56.Gas welding, flame cutting and domestic gaseous fuel installations Requirements for ships constructed on or after 1st September 1984

  11. PART X EQUIVALENTS, PENALTIES AND DETENTION

    1. 57.Alternative construction, equipment and machinery

    2. 58.Penalties

    3. 59.Power to detain

  12. Signature

  13. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.