The Transportable Pressure Vessels Regulations 2001

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to The Transportable Pressure Vessels Regulations 2001. Those changes will be listed when you open the content using the Table of Contents below. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the affected provisions when you open the content using the Table of Contents below.

View outstanding changes

Changes and effects yet to be applied to :

  1. Introductory Text

  2. PART I PRELIMINARY

    1. 1. Citation and Commencement

    2. 2. Interpretation

    3. 3. Application

  3. PART II GENERAL REQUIREMENTS

    1. 4. Requirements relating to the placing on the market and use at work of transportable pressure vessels

    2. 5. Transportable pressure vessels placed on the market or used at work exclusively in Great Britain

    3. 6. Reassessment of conformity

    4. 7. Periodic inspection and repeated use

    5. 8. Notified bodies

    6. 9. Approved bodies

    7. 10. Appointment of notified bodies and approved bodies by the Executive

    8. 11. Conformity marking

  4. PART III MISCELLANEOUS

    1. 12. Fees

    2. 13. Defence

    3. 14. Amendments and saving

  5. Signature

    1. SCHEDULE 1

      DISAPPLICATIONS TO THESE REGULATIONS

      1. 1.These Regulations shall not apply to— (a) gas cylinders used...

      2. 2.These Regulations shall not apply to any transportable pressure vessel...

      3. 3.These Regulations shall not apply to transportable pressure vessels—

    2. SCHEDULE 2

      STANDARDS

      1. The standards referred to in regulations 4 to 6 are—...

      2. 1.In respect of materials— (a) EN ISO 11114-1:1997, entitled “Transportable...

      3. 2.In respect of cylinders— (a) Annex I, Parts 1 to...

      4. 3.In respect of closures— (a) EN 849:1996 (except Annex A),...

      5. 4.In respect of markings— (a) EN 1089-1:1996, entitled “Transportable gas...

    3. SCHEDULE 3

      CONFORMITY ASSESSMENT PROCEDURES

      1. 1. Module A—internal production control

      2. 2.The manufacturer must draw up the technical documentation described in...

      3. 3.The technical documentation must enable an assessment to be made...

      4. 4.The manufacturer, or his authorised representative established within the Community,...

      5. 5.The manufacturer must take all measures necessary to ensure that...

      6. Module A1—internal manufacturing checks with monitoring of the final assessment

      7. Final assessment must be performed by the manufacturer and monitored...

      8. During such visits, the notified body must: — ensure that...

      9. Should one or more of the transportable pressure vessels not...

      10. On the responsibility of the notified body, the manufacturer must...

      11. 1. Module B—EC type-examination

      12. 2.The application for EC-type-examination must be lodged by the manufacturer...

      13. The application must include: — the name and address of...

      14. The applicant must place at the disposal of the notified...

      15. A type may cover several versions of the transportable pressure...

      16. 3.The technical documentation must enable an assessment to be made...

      17. 4.The notified body must:

      18. 4.1.examine the technical documentation, verify that the type has been...

      19. 4.2.perform or have performed the appropriate examinations and necessary tests...

      20. 4.3.perform or have performed the appropriate examinations and necessary tests...

      21. 4.4.agree with the applicant the location where the examinations and...

      22. 5.Where the type satisfies the relevant provisions of these Regulations,...

      23. A list of the relevant parts of the technical documentation...

      24. If the notified body refuses to issue an EC type-examination...

      25. 6.The applicant must inform the notified body that holds the...

      26. 7.Each notified body must communicate to the member States the...

      27. Each notified body must also communicate to the other notified...

      28. 8.The other notified bodies may receive copies of the EC...

      29. 9.The manufacturer, or his authorised representative established within the Community,...

      30. Where neither the manufacturer nor his authorised representative is established...

      31. 1. Module B1—EC design examination

      32. 2.The manufacturer, or his authorised representative established within the Community,...

      33. and may cover several versions of the transportable pressure vessel...

      34. 3.The technical documentation must enable an assessment to be made...

      35. 4.The notified body must:

      36. 4.1.examine the technical documentation and identify the components which have...

      37. 4.2.perform the necessary examinations to establish whether the solutions adopted...

      38. 4.3.perform the necessary examinations to establish whether the relevant provisions...

      39. 5.Where the design meets the relevant provisions of these Regulations...

      40. A list of the relevant parts of the technical documentation...

      41. If the notified body refuses to issue an EC type-examination...

      42. 6.The applicant must inform the notified body that holds the...

      43. 7.Each notified body must communicate to the member States the...

      44. Each notified body must also communicate to the other notified...

      45. 8.The other notified bodies may on request obtain the relevant...

      46. 9.The manufacturer, or his authorised representative established within the Community,...

      47. Where neither the manufacturer nor his authorised representative is established...

      48. 1. Module C1—conformity to type

      49. 2.The manufacturer must take all measures necessary to ensure that...

      50. 3.The manufacturer, or his authorised representative established within the Community,...

      51. Where neither the manufacturer nor his authorised representative is established...

      52. 4.Final assessment must be subject to monitoring in the form...

      53. During such visits, the notified body must: — ensure that...

      54. Should one or more of the transportable pressure vessels not...

      55. On the responsibility of the notified body, the manufacturer must...

      56. 1. Module D—production quality assurance

      57. 2.The manufacturer must operate an approved quality system for production,...

      58. 3.Quality system

      59. 3.1.The manufacturer must lodge an application for assessment of his...

      60. 3.2.The quality system must ensure compliance of the transportable pressure...

      61. All the elements, requirements and provisions adopted by the manufacturer...

      62. It must contain in particular an adequate description of: —...

      63. 3.3.The notified body must assess the quality system to determine...

      64. The auditing team must have at least one member with...

      65. The decision must be notified to the manufacturer. The notification...

      66. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      67. The manufacturer, or his authorised representative established within the Community,...

      68. The notified body must assess the proposed changes and decide...

      69. It must notify its decision to the manufacturer. The notification...

      70. 4.Surveillance under the responsibility of the notified body

      71. 4.1.The purpose of surveillance is to ensure that the manufacturer...

      72. 4.2.The manufacturer must allow the notified body access for inspection...

      73. 4.3.The notified body must carry out periodic audits to make...

      74. 4.4.In addition, the notified body may pay unexpected visits to...

      75. During such visits the notified body may, if necessary, carry...

      76. 5.The manufacturer must, for a period of 10 years after...

      77. 6.Each notified body must communicate to the member States the...

      78. Each notified body must also communicate to the other notified...

      79. 1. Module D1—production quality assurance

      80. 2.The manufacturer must draw up the technical documentation described below....

      81. 3.The manufacturer must operate an approved quality system for production,...

      82. 4.Quality system

      83. 4.1.The manufacturer must lodge an application for assessment of his...

      84. The application must include: — all relevant information on the...

      85. 4.2.The quality system must ensure compliance of the transportable pressure...

      86. All the elements, requirements and provisions adopted by the manufacturer...

      87. It must contain in particular an adequate description of: —...

      88. 4.3.The notified body must assess the quality system to determine...

      89. The auditing team must have at least one member with...

      90. The decision must be notified to the manufacturer. The notification...

      91. 4.4.The manufacturer must undertake to fulfil the obligations arising out...

      92. The manufacturer, or his authorised representative established within the Community,...

      93. The notified body must assess the proposed changes and decide...

      94. It must notify its decision to the manufacturer. The notification...

      95. 5.Surveillance under the responsibility of the notified body

      96. 5.1.The purpose of surveillance is to make sure that the...

      97. 5.2.The manufacturer must allow the notified body access for inspection...

      98. 5.3.The notified body must carry out periodic audits to make...

      99. 5.4.In addition, the notified body may pay unexpected visits to...

      100. During such visits the notified body may, if necessary, carry...

      101. 6.The manufacturer must, for a period of 10 years after...

      102. 7.Each notified body must communicate to the member States the...

      103. Each notified body must communicate to the other notified bodies...

      104. 1. Module E—product quality assurance

      105. 2.The manufacturer must operate an approved quality system for production,...

      106. 3.Quality system

      107. 3.1.The manufacturer must lodge an application for assessment of his...

      108. The application must include: — all relevant information on the...

      109. 3.2.Under the quality system, each transportable pressure vessel must be...

      110. It must contain in particular an adequate description of: —...

      111. 3.3.The notified body must assess the quality system to determine...

      112. The auditing team must have at least one member with...

      113. The decision must be notified to the manufacturer. The notification...

      114. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      115. The manufacturer, or his authorised representative established within the Community,...

      116. The notified body must assess the proposed changes and decide...

      117. It must notify its decision to the manufacturer. The notification...

      118. 4.Surveillance under the responsibility of the notified body

      119. 4.1.The purpose of surveillance is to ensure that the manufacturer...

      120. 4.2.The manufacturer must allow the notified body access for inspection...

      121. 4.3.The notified body must carry out periodic audits to make...

      122. 4.4.In addition, the notified body may pay unexpected visits to...

      123. During such visits the notified body may, if necessary, carry...

      124. 5.The manufacturer must, for a period of 10 years after...

      125. 6.Each notified body must communicate to the member States the...

      126. Each notified body must also communicate to the other notified...

      127. 1. Module E1—production quality assurance

      128. 2.The manufacturer must draw up the technical documentation described below....

      129. The technical documentation must enable an assessment to be made...

      130. 3.The manufacturer must operate an approved quality system for the...

      131. 4.Quality system

      132. 4.1.The manufacturer must lodge an application for assessment of his...

      133. The application must include: — all relevant information on the...

      134. 4.2.Under the quality system, each transportable pressure vessel must be...

      135. It must contain in particular an adequate description of: —...

      136. 4.3.The notified body must assess the quality system to determine...

      137. The auditing team must have at least one member with...

      138. The decision must be notified to the manufacturer. The notification...

      139. 4.4.The manufacturer must undertake to discharge the obligations arising from...

      140. The manufacturer, or his authorised representative established within the Community,...

      141. The notified body must assess the proposed changes and decide...

      142. It must notify its decision to the manufacturer. The notification...

      143. 5.Surveillance under the responsibility of the notified body

      144. 5.1.The purpose of surveillance is to make sure that the...

      145. 5.2.The manufacturer must allow the notified body access for inspection...

      146. 5.3.The notified body must carry out periodic audits to make...

      147. 5.4.In addition, the notified body may pay unexpected visits to...

      148. During such visits the notified body may, if necessary, carry...

      149. 6.The manufacturer must, for a period of 10 years after...

      150. 7.Each notified body must communicate to the member States the...

      151. Each notified body must communicate to the other notified bodies the relevant information concerning the quality system approvals it has withdrawn or refused.

      152. 1. Module F—product verification

      153. 2.The manufacturer must take all measures necessary to ensure that...

      154. The manufacturer, or his authorised representative established within the Community, must affix the conformity marking to all transportable pressure vessels and draw up a declaration of conformity.

      155. 3.The notified body must perform the appropriate examinations and tests...

      156. The manufacturer, or his authorised representative established within the Community,...

      157. 4.Verification by examination and testing of each transportable pressure vessel

      158. 4.1.Each transportable pressure vessel must be individually examined and must...

      159. In particular, the notified body must: — verify that the...

      160. 4.2.The notified body must affix its identification number or have...

      161. 4.3.The manufacturer, or his authorised representative established within the Community,...

      162. 1. Module G—EC unit verification

      163. 2.The manufacturer must apply to a notified body of his...

      164. 3.The technical documentation must enable the conformity of the transportable...

      165. The technical documentation must contain: — a general description of...

      166. 4.The notified body must examine the design and construction of...

      167. 4.1.The notified body must affix its identification number or have...

      168. 4.2.The manufacturer, or his authorised representative established within the Community,...

      169. In particular, the notified body must: — examine the technical...

      170. 1. Module H—full quality assurance

      171. 2.The manufacturer must implement an approved quality system for design,...

      172. 3.Quality system

      173. 3.1.The manufacturer must lodge an application for assessment of his...

      174. The application must include: — all relevant information concerning the...

      175. 3.2.The quality system must ensure compliance of the transportable pressure...

      176. All the elements, requirements and provisions adopted by the manufacturer...

      177. It must contain in particular an adequate description of: —...

      178. 3.3.The notified body must assess the quality system to determine...

      179. The auditing team must have at least one member with...

      180. The decision must be notified to the manufacturer. The notification...

      181. 3.4.The manufacturer must undertake to fulfil the obligations arising out...

      182. The manufacturer, or his authorised representative established within the Community,...

      183. The notified body must assess the proposed changes and decide...

      184. It must notify its decision to the manufacturer. The notification...

      185. 4.Surveillance under the responsibility of the notified body

      186. 4.1.The purpose of this surveillance is to make sure that...

      187. 4.2.The manufacturer must allow the notified body access for inspection...

      188. 4.3.The notified body must carry out periodic audits to make...

      189. 4.4.In addition, the notified body may pay unexpected visits to...

      190. During such visits the notified body may, if necessary, carry...

      191. 5.The manufacturer must, for a period of 10 years after...

      192. 6.Each notified body must communicate to the member States the...

      193. Each notified body must also communicate to the other notified...

      194. 1. Module H1—full quality assurance with design examination and special surveillance of the final test

      195. 2.Final assessment is subject to increased surveillance in the form...

    4. SCHEDULE 4

      MODULES TO BE FOLLOWED FOR CONFORMITY ASSESSMENT

      1. The following table indicates which modules are to be followed...

      2. 1.Transportable pressure vessels must be subject, at the choice of...

      3. 2.As part of the quality assurance procedures, the notified body...

    5. SCHEDULE 5

      CONFORMITY REASSESSMENT PROCEDURE

      1. 1.This procedure describes the method for ensuring that transportable pressure...

      2. 2.The owner must make available to a notified body information...

      3. The notified body must also check that valves and other...

      4. 3.The notified body must check whether transportable pressure vessels which...

      5. 4.If the results of the above checks are satisfactory, the...

      6. 5.For vessels manufactured in series, including their valves and other...

    6. SCHEDULE 6

      PERIODIC INSPECTION PROCEDURES

      1. 1. Module 1—periodic inspection of products

      2. 2.To meet the requirements referred to in paragraph 1, the...

      3. The measures carried out must be recorded in documents and...

      4. 3.The notified or approved body must perform the appropriate examinations...

      5. 3.1.All transportable pressure vessels must be examined individually and appropriate...

      6. 3.2.The notified or approved body must affix, or have affixed,...

      7. 3.3.The owner or his authorised representative established in the Community...

      8. 1. Module 2—periodic inspection through quality assurance

      9. 2.The owner or his authorised representative established in the Community...

      10. The measures carried out must be recorded in documents and...

      11. The owner or his authorised representative established within the Community...

      12. The owner or his authorised representative established in the Community...

      13. 3.Quality system

      14. 3.1.The owner or his authorised representative established in the Community...

      15. The application must include: — all relevant information on the...

      16. 3.2.Under the quality system, each transportable pressure vessel must be...

      17. It must contain in particular an adequate description of: —...

      18. 3.3.The notified body must assess the quality system to determine...

      19. The auditing team must have at least one member with...

      20. The decision must be notified to the owner or his...

      21. 3.4.The owner or his authorised representative established in the Community...

      22. The owner or his authorised representative established in the Community...

      23. The notified body must assess the proposed changes and decide...

      24. It must notify its decision to the owner or his...

      25. 4.Surveillance under the responsibility of the notified body

      26. 4.1.The purpose of surveillance is to make sure that the...

      27. 4.2.The owner or his authorised representative established in the Community...

      28. 4.3.The notified body must carry out periodic audits to make...

      29. 4.4.In addition, the notified body may pay unannounced visits to...

      30. 5.The owner or his authorised representative established in the Community...

    7. SCHEDULE 7

      CONFORMITY MARKING

      1. The conformity marking shall take the following form—

      2. If the marking is reduced or enlarged, the proportions of...

      3. The various components of the marking must have substantially the...

      4. This minimum dimension may be waived for small vessels.

    8. SCHEDULE 8

      AMENDMENTS TO THE CDGCPL REGULATIONS

      1. 1.The CDGCPL Regulations shall be amended in accordance with the...

      2. 2.In regulation 1, for the words “1st July 2001” there...

      3. 3.In regulation 2(1)— (a) for the definition of “competent person”...

      4. 4.For paragraphs (4) and (5) of regulation 3, there shall...

      5. 5.Regulations 12 to 17 shall be deleted.

      6. 6.In regulation 19, for paragraph (5) there shall be substituted...

      7. 7.Paragraph (10) of regulation 21 shall be deleted.

      8. 8.In Schedule 4— (a) in paragraph 1, for the words...

      9. 9.Schedule 7 shall be deleted.

      10. 10.For Schedule 8 there shall be substituted the following Schedule—...

      11. 11.In Schedule 9— (a) in paragraph 2, for the words...

  6. Explanatory Note

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources