- Latest available (Revised)
- Original (As made)
There are currently no known outstanding effects for the The Recreational Craft Regulations 2004 (revoked).
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
6.Exclusion until 31st December 2005 and 31st December 2006 of specified products complying with national rules in force on 16th June 2003
14.Procedure where a notified body is minded to refuse to issue an EC type-examination certificate
20.Requirement to give information about any product which does not bear the CE marking or other product not required to bear the CE marking
ESSENTIAL REQUIREMENTS Preliminary Observation
. . . . . . . . . ....
A.ESSENTIAL SAFETY REQUIREMENTS FOR THE DESIGN AND CONSTRUCTION OF RECREATIONAL...
1.BOAT DESIGN CATEGORIES Design Category Wind force (Beaufort scale) Significant...
B.OFFSHORE: Designed for offshore voyages where conditions up to, and...
C.INSHORE: Designed for voyages in coastal waters, large bays, estuaries,...
D.SHELTERED WATERS: Designed for voyages on sheltered coastal waters, small...
2.GENERAL REQUIREMENTS Products falling under Article 1(1)(a) shall comply with...
2.1.Craft identification Each craft shall be marked with an identification...
2.2.Builder’s plate Each craft shall carry a permanently affixed plate...
2.3.Protection from falling overboard and means of reboarding Depending on...
2.4.Visibility from the main steering position For motor boats, the...
2.5.Owner’s manual Each craft shall be provided with an owner’s...
3.1.Structure The choice and combination of materials and its construction...
3.2.Stability and freeboard The craft shall have sufficient stability and...
3.3.Buoyancy and flotation The craft shall be constructed to ensure...
3.4.Openings in hull, deck and superstructure Openings in hull, deck(s)...
3.5.Flooding All craft shall be designed so as to minimize...
3.6.Manufacturer’s maximum recommended load The manufacturer’s maximum recommended load (fuel,...
3.7.Liferaft stowage All craft of categories A and B, and...
3.8.Escape All habitable multihull craft over 12 metres long shall...
3.9.Anchoring, mooring and towing All craft, taking into account their...
4.The manufacturer shall ensure that the handling characteristics of the...
5.1.1.Inboard engine All inboard mounted engines shall be placed within...
5.1.2.Ventilation The engine compartment shall be ventilated. The dangerous ingress...
5.1.3.Exposed parts Unless the engine is protected by a cover...
5.1.4.Outboard engines starting All boats with outboard engines shall have...
5.1.5.Personal watercraft running without driver Personal watercraft shall be designed...
5.2.1.General The filling, storage, venting and fuel-supply arrangements and installations...
5.2.2.Fuel tanks Fuel tanks, lines and hoses shall be secured...
5.3.Electrical system Electrical systems shall be designed and installed so...
5.4.1.General Steering systems shall be designed, constructed and installed in...
5.4.2.Emergency arrangements Sailboat and single-engined inboard powered motor boats with...
5.6.1.General The type of equipment installed and the layout of...
5.6.2.Fire-fighting equipment Craft shall be supplied with fire-fighting equipment appropriate...
5.7.Navigation lights Where navigation lights are fitted, they shall comply...
5.8.Discharge prevention and installations facilitating the delivery ashore of waste...
B.ESSENTIAL REQUIREMENTS FOR EXHAUST EMISSIONS FROM PROPULSION ENGINES Propulsion engines...
1.1.Each engine shall be clearly marked with the following information:...
1.3.These marks must be secured to an engine part necessary...
2.EXHAUST EMISSION REQUIREMENTS Propulsion engines shall be designed, constructed and...
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
3.DURABILITY The manufacturer of the engine shall supply engine installation...
4.OWNER'S MANUAL Each engine shall be provided with an Owner’s...
C.ESSENTIAL REQUIREMENTS FOR NOISE EMISSIONS Recreational craft with inboard or...
1.1.Recreational craft with inboard or stern drive engines without integral...
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
1.2.As an alternative to sound measurement tests, recreational craft with...
1.3.“Froude number” shall be calculated by dividing the maximum boat...
1.4.As a further alternative to sound measurement tests, recreational craft...
1.5.“Certified reference boat” shall mean a specific combination of hull/inboard...
2.For recreational craft with inboard engine or stern engines with...
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
INTERNAL PRODUCTION CONTROL (module A)
1.The manufacturer or his authorised representative established within the Community,...
2.The manufacturer shall establish the technical documentation described in paragraph...
3.Technical documentation shall enable the conformity of the products with...
4.The manufacturer or his authorised representative shall keep a copy...
5.The manufacturer shall take all measures necessary in order that...
EC TYPE-EXAMINATION (module B)
1.A notified body ascertains and attests that a specimen, representative...
2.The application for the EC type-examination shall be lodged by...
3.The technical documentation shall enable the conformity of the product...
4.1.examine the technical documentation, verify that the type has been...
4.2.perform or have performed the appropriate examinations and necessary tests...
4.3.perform or have performed the appropriate examinations and necessary tests...
4.4.agree with the applicant the location where the examinations and...
5.Where the type meets the provisions of the Directive, the...
6.The applicant shall inform the notified body that holds the...
7.Each notified body shall communicate to the other notified bodies...
9.The manufacturer or his authorised representative shall keep with the...
PRODUCTION QUALITY ASSURANCE (module D)
1.The manufacturer who satisfies the obligations of point 2 ensures...
2.The manufacturer shall operate an approved quality system for production,...
3.1.The manufacturer shall lodge an application for assessment of his...
3.2.The quality system shall ensure compliance of the products with...
3.3.The notified body shall assess the quality system to determine...
3.4.The manufacturer shall undertake to fulfil the obligations arising out...
4.Surveillance under the responsibility of the notified body
4.2.The manufacturer shall allow the notified body entrance for inspection...
4.3.The notified body shall periodically carry out audits to make...
4.4.Additionally the notified body may pay unexpected visits to the...
5.The manufacturer shall, for a period ending at least 10...
6.Each notified body shall give the other notified bodies the...
PRODUCT VERIFICATION (module F)
1.This module describes the procedure whereby a manufacturer or his...
2.The manufacturer shall take all measures necessary in order that...
3.The notified body shall carry out the appropriate examinations and...
3a..The manufacturer or his authorised representative shall keep a copy...
4.1.All products shall be individually examined and appropriate tests as...
4.2.The notified body shall affix, or cause to be affixed,...
4.3.The manufacturer or his authorised representative shall ensure that he...
5.1.The manufacturer shall present his products in the form of...
5.2.All products shall be available for verification in the form...
5.3.The statistical procedure shall use the following elements: — the...
5.4.In the case of accepted lots, the notified body shall...
5.5.The manufacturer or his authorised representative shall ensure that he...
FULL QUALITY ASSURANCE (module H)
1.This module describes the procedure whereby the manufacturer who satisfies...
2.The manufacturer shall operate an approved quality system for design,...
3.1.The manufacturer shall lodge an application for assessment of his...
3.2.The quality system shall ensure compliance of the products with...
3.3.The notified body shall assess the quality system to determine...
3.4.The manufacturer shall undertake to fulfil the obligations arising out...
4.EC surveillance under the responsibility of the notified body
4.2.The manufacturer shall allow the notified body entrance for inspection...
4.3.The notified body shall periodically carry out audits to make...
4.4.Additionally the notified body may pay unexpected visits to the...
5.The manufacturer shall, for a period ending at least 10...
6.Each notified body shall forward to the other notified bodies...
TECHNICAL DOCUMENTATION SUPPLIED BY THE MANUFACTURER
. . . . . . . . . ....
. . . . . . . . . ....
. . . . . . . . . ....
PRODUCT QUALITY ASSURANCE (MODULE E)
1.This module describes the procedure whereby the manufacturer who satisfies...
2.The manufacturer must operate an approved quality system for final...
3.1.The manufacturer must lodge an application for assessment of his...
3.2.Under the quality system, each product must be examined and...
3.3.The notified body must assess the quality system to determine...
3.4.The manufacturer must undertake to fulfil the obligations arising from...
4.Surveillance under the responsibility of the notified body
4.2.The manufacturer must allow the notified body entrance for inspection...
4.3.The notified body must periodically carry out audits to ensure...
4.4.Additionally, the notified body may pay unexpected visits to the...
6.Each notified body must forward to the other notified bodies...
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: