Search Legislation

The Measuring Instruments (Non-Prescribed Instruments) Regulations 2006 (revoked)

Changes to legislation:

There are currently no known outstanding effects for the The Measuring Instruments (Non-Prescribed Instruments) Regulations 2006 (revoked). Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

  1. Introductory Text

  2. 1.Citation and commencement

  3. 2.Interpretation

  4. 3.Application

  5. 4.Designation of notified bodies

  6. 5.Functions of notified bodies

  7. 6.Provisions supplemental to regulation 4

  8. 7.Variation and termination of designations

  9. 8.Fees

  10. 9.Compliance with the essential requirements

  11. 10.Conformity assessment procedures

  12. 11.Marking and identification requirements

  13. 12.Conformity with other directives

  14. Signature

    1. SCHEDULE 1

      1. PART 1 ESSENTIAL REQUIREMENTS

        1. 1.The essential requirements are the relevant requirements relating to measuring...

        2. 2.Definitions

        3. 3.Allowable Errors

        4. 4.Reproducibility

        5. 5.Repeatability

        6. 6.Discrimination and Sensitivity

        7. 7.Durability

        8. 8.Reliability

        9. 9.Suitability

        10. 10.Protection against corruption

        11. 11.Information to be borne by and to accompany the instrument

        12. 12.Indication of result

        13. 13.Further processing of data to conclude the trading transaction

        14. 14.Conformity evaluation

      2. PART 2 INSTRUMENT SPECIFIC REQUIREMENTS

        1. Part A Water Meters

          1. 15.The relevant requirements of Part 1 and the specific requirements...

          2. 16.Definitions

          3. 17.Rated Operating Conditions

          4. 18.MPE

          5. 19.Permissible Effect of Disturbances

          6. 20.Suitability

          7. 21.Units of Measurement

          8. 22.Putting into Use

        2. Part B Heat Meters

          1. 23.The relevant requirements of Part 1 and the specific requirements...

          2. 24.Definitions

          3. 25.Rated operating conditions

          4. 26.Accuracy classes

          5. 27.MPE applicable to complete heat meters

          6. 28.Permissible influences of electromagnetic disturbances

          7. 29.Durability

          8. 30.Inscriptions on a heat meter

          9. 31.Sub-assemblies

          10. 32.Putting into use

        3. Part C Measuring System for the Continuous and Dynamic Measurement of Quantities of Liquids other than Water

          1. 33.(1) The relevant requirements of Part 1 and the specific...

          2. 34.Definitions

          3. 35.Rated operating conditions

          4. 36.Accuracy classification and maximum permissible errors (MPEs)

          5. 37.Maximum permissible effect of disturbances

          6. 38.Durability

          7. 39.Suitability

          8. 40.Power supply failure

          9. 41.Putting into use

          10. 42.Units of measurement

        4. Part D Automatic Weighing Instruments

          1. 43.The relevant requirements of Part 1 and the specific requirements...

          2. 44.Rated Operating Conditions

          3. 45.Suitability

          4. 46.Automatic Catchweighers

          5. 47.Automatic gravimetric filling instruments

          6. 48.Discontinuous Totalisers

          7. 49.Continuous Totalisers

          8. 50.Automatic Rail-weighbridges

        5. Part E Material Measures

          1. 51.(1) The relevant essential requirements of Part 1 and the...

          2. 52.Material measures of length

          3. 53.Capacity serving measures

        6. Part F Dimensional Measuring Instruments

          1. 54.The relevant essential requirements of Part 1 and the specific...

          2. 55.Requirements common to all dimensional measuring instruments

          3. 56.Length measuring instruments

          4. 57.Area measuring instruments

          5. 58.Instrument The MPE is 1.0 % but not less than...

          6. 59.Other requirements

          7. 60.Multi-dimensional measuring instruments

        7. Part G Volume Conversion Devices

          1. 61.The relevant essential requirements of Part 1 and the specific...

          2. 62.A volume conversion device constitutes a sub-assembly for the purpose...

          3. 63.Rated operating conditions

          4. 64.MPE

          5. 65.Permissible effect of disturbances

          6. 66.Suitability

          7. 67.Units

          8. 68.Base conditions for converted quantities

          9. 69.Putting into Use

    2. SCHEDULE 2

      NOTIFIED BODIES

      1. PART 1 NOTIFIED BODY CRITERIA

        1. 1.The body, its director and staff involved in conformity assessment...

        2. 2.The body, its director and staff involved in conformity assessment...

        3. 3.The conformity assessment shall be carried out with the highest...

        4. 4.The body shall be capable of carrying out all the...

        5. 5.The body's staff shall have— (a) sound technical and vocational...

        6. 6.The impartiality of the body, its director and staff shall...

        7. 7.The body shall satisfy the designating authority that it has...

        8. 8.The body's director and staff shall be bound to observe...

      2. PART 2 FUNCTIONS

        1. 9.Assessment of applications for certificates or notifications

        2. 10.Limitations on duties to exercise functions

        3. 11.Contractors

        4. 12.Form of certificates or notifications

        5. 13.Conditions of certificates or notifications

        6. 14.Withdrawal of certificates or notifications

        7. 15.Procedure where a notified body is minded to refuse to give, or to vary or withdraw a certificate or approval

    3. SCHEDULE 3

      TECHNICAL DOCUMENTATION

      1. 1.The technical documentation shall render the design, manufacture and operation...

      2. 2.The technical documentation shall be sufficiently detailed to ensure—

      3. 3.The technical documentation shall include insofar as relevant for assessment...

      4. 4.The manufacturer shall specify where seals and markings have been...

      5. 5.The manufacturer shall indicate the conditions for compatibility with interfaces...

    4. SCHEDULE 4

      MARKING AND INSCRIPTIONS

      1. 1.The CE marking consists of the symbol “CE” according to...

      2. 2.The M marking consists of the capital letter “M” and...

      3. 3.The identification number of the notified body concerned shall follow...

      4. 4.When a measuring instrument consists of a set of devices,...

      5. 5.When a measuring instrument is too small or too sensitive...

      6. 6.The CE marking and the M marking shall be indelible....

  15. Explanatory Note

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Memorandum

Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources