Search Legislation

The Borough of Poole (Poole Harbour Opening Bridges) Order 2006

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about opening options

Opening OptionsExpand opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Use of subsoil

28.—(1) The Council may enter upon, take and use so much of the subsoil of any street within the limits of deviation or within the land the subject of paragraph (1)(a) and (b) of article 18 as may be required for the purpose of the construction or maintenance of the authorised works without being required to acquire that subsoil or any right therein.

(2) The Council shall not be required to pay any compensation for the exercise of the powers conferred by paragraph (1) where the street is a highway; but where the street is not a highway any person suffering loss by the exercise of that power shall be entitled to compensation to be determined, in case of dispute, under Part 1 of the 1961 Act.

(3) Paragraphs (1) and (2) shall not apply in relation to—

(a)any subway or underground building; or

(b)any cellar, vault, arch or other construction in or on a street which forms part of a building fronting onto, or abutting or lying under, the street.

Back to top

Options/Help