- Latest available (Revised)
- Original (As made)
There are multiple versions of this provision on screen. These apply to different geographical extents.
The term provision is used to describe a definable element in a piece of legislation that has legislative effect – such as a Part, Chapter or section.
Sometimes the text of a provision is changed, but the change(s) only apply to a particular geographical area. In some limited cases where this happens, the editorial team create a version for each different geographical area. Multiple versions are only created in this way where the change in question is a substitution so that there are different versions of the text for the different extents. Insertions and repeals of text do not give rise to such multiple versions.
There are currently no known outstanding effects for the The Measuring Instruments Regulations 2016, Section 45.
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
45.—(1) The technical documentation must, insofar as relevant for assessment and identification of either the [F1regulated] measuring instrument or its type (or both), include the following information—
(a)a general description of the [F1regulated] measuring instrument;
(b)the conceptual design and manufacturing drawings and plans of components, sub-assemblies, circuits etc.;
(c)manufacturing procedures to ensure consistent production;
(d)if applicable, a description of the electronic devices with drawings, diagrams, flow diagrams of the logic and general software information explaining their characteristics and operation;
(e)descriptions and explanations necessary for the understanding of the information referred to in sub-paragraphs (b) to (d);
(f)a list of any [F2designated] standards and normative documents which have been applied in full or in partF3...;
(g)descriptions of the solutions adopted to meet the essential requirements where [F4designated] standards or normative documents have not been applied, including a list of other relevant technical specifications applied;
(h)results of design calculations, examinations etc.;
(i)the appropriate test results, where necessary to demonstrate that the type or [F1regulated] measuring instruments or both comply with the following—
(i)the requirements of [F5these Regulations] under declared rated operating conditions and under specified environmental disturbances; and
(ii)the durability specifications for gas [F6and water] meters as well as for liquids other than water; and
(j)the [F7type] examination certificates or F8... design examinations certificates in respect of [F1regulated] measuring instruments containing parts identical to those in the design.
(2) The manufacturer must specify where seals and markings have been applied.
(3) The manufacturer must indicate the conditions for compatibility with interfaces and sub-assemblies where relevant.
Extent Information
E1This version of this provision extends to England and Wales and Scotland only; a separate version has been created for Northern Ireland only
Textual Amendments
F1Word in reg. 45(1) inserted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(a) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F2Word in reg. 45(1)(f) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(b)(i) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F3Words in reg. 45(1)(f) omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(b)(ii) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F4Word in reg. 45(1)(g) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(c) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F5Words in reg. 45(1)(i)(i) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(d) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F6Words in reg. 45(1)(i)(ii) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(e) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F7Word in reg. 45(1)(j) substituted (E.W.S.) (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(f)(i) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F8Word in reg. 45(1)(j) omitted (E.W.S.) (31.12.2020) by virtue of The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 27 para. 29(f)(ii) (with Sch. 27 para. 50(a)) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
45.—(1) The technical documentation must, insofar as relevant for assessment and identification of either the measuring instrument or its type (or both), include the following information—
(a)a general description of the measuring instrument;
(b)the conceptual design and manufacturing drawings and plans of components, sub-assemblies, circuits etc.;
(c)manufacturing procedures to ensure consistent production;
(d)if applicable, a description of the electronic devices with drawings, diagrams, flow diagrams of the logic and general software information explaining their characteristics and operation;
(e)descriptions and explanations necessary for the understanding of the information referred to in sub-paragraphs (b) to (d);
(f)a list of any harmonised standards and normative documents which have been applied in full or in part, the references of which have been published in the Official Journal of the European Union;
(g)descriptions of the solutions adopted to meet the essential requirements where harmonised standards or normative documents have not been applied, including a list of other relevant technical specifications applied;
(h)results of design calculations, examinations etc.;
(i)the appropriate test results, where necessary to demonstrate that the type or measuring instruments or both comply with the following—
(i)the requirements of the Directive under declared rated operating conditions and under specified environmental disturbances; and
(ii)the durability specifications for gas, water and thermal-energy meters as well as for liquids other than water; and
(j)the EU-type examination certificates or EU design examinations certificates in respect of measuring instruments containing parts identical to those in the design.
(2) The manufacturer must specify where seals and markings have been applied.
(3) The manufacturer must indicate the conditions for compatibility with interfaces and sub-assemblies where relevant.
Extent Information
E2This version of this provision extends to Northern Ireland only; a separate version has been created for England and Wales and Scotland only
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: