In the District of North Somerset
Work No. 4A — AT connection
Works to connect Sandford 132kV Substation to the existing 132kV...
The works include a temporary site compound as shown on...
In the District of Sedgemoor and the District of North...
Work No. 4B — F route removal
The removal of 47.8km of the F Route 132kV overhead...
In the District of North Somerset
Work No. 4C — N route connection
Works to connect Sandford 400/132kV Substation to the existing 132kV...
In the District of North Somerset
Work No. 4D — W route removal and undergrounding
Works to allow the removal of part of the 132kV...
In the District of North Somerset
Work No. 4E — Portishead 132kV substation
The installation of cables and cable sealing ends within Portishead...
In the District of North Somerset
Work No. 4F — Churchill 132kV Substation
Works to allow the continued operation of Churchill 132kV Substation...
The works include construction and installation of a temporary site...
In the District of North Somerset and the City of...
Work No. 4G — G route removal (Portishead to Avonmouth)...
The removal of 5.4km of the G Route 132kV overhead...
In the City of Bristol
Work No. 4H — G route removal (Avonmouth to Pylon...
The removal of 2.1km of the G Route 132kV overhead...
In the City of Bristol
Work No. 4I — G route undergrounding
The installation of 2.3km of underground 132kV electric cables and...
The works include construction and installation of a temporary site...
In the City of Bristol
Work No. 4J — G route
The construction and installation of a cable sealing end pylon...
In the City of Bristol
Work No. 4K — Avonmouth 132kV Substation
The installation of electric cables and fibre optic cable, cable...
In the City of Bristol and the District of South...
Work No. 4L — Seabank DA route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4M — Seabank BW route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4N — Seabank G route
Works as shown on Works Plan section G, sheet 7...
The works include a temporary site compound for the combined...
In the City of Bristol
Work No. 4O — Seabank 132kV Substation
Work on the existing Seabank 132kV Substation compound to extend...
In the District of North Somerset
Work No. 4P — BW Route undergrounding south of the...
Works as shown on Works Plan section F, sheets 3...
The works include a temporary site compound as shown on...