Article 2
SCHEDULE
(1)
Where the correction is to be made
| (2)
How the correction is to be made
| (3)
Text to be substituted, inserted or omitted (if any)
|
---|
Article 2 (interpretation) – definition of “CEMP” | After “requirement 4” for “(construction environmental management plans)” substitute | “(construction environmental management plan)” |
Article 9(1) (consent to transfer benefit of Order) | For “Subject to paragraph (4),” substitute | “Subject to paragraphs (4) and (5),” |
Article 10(1) (application of the 1991 Act) | After “Part 3” insert | “(street works in England and Wales)” |
Article 11(2) (construction and maintenance of new, altered or diverted streets and other structures) | After “the altered or diverted part of the highway” delete “must, be” and substitute | “must be” |
Article 11(3) (construction and maintenance of new, altered or diverted streets and other structures) | After “to the reasonable satisfaction of the street” for “authority,” substitute | “authority” |
Schedule 2 (requirements), paragraph 1 (interpretation), definition of “Preliminary Environmental Design” | For “certified by the Secretary of State as the Preliminary Environmental Design for the purposes of this Order” substitute | “comprised within Figure 2.2 of the Environmental Statement” |
Schedule 2 (requirements), requirement 3(3) (detailed design) | After “design of the bridges and” insert | “any significant” |
Schedule 9 (protective provisions), Part 7 (for the protection of Transport for London), paragraph 71 (Interpretation), definition of “Commuted Sum” | After “of this Part” insert | “and that calculation must take into account any savings to Transport for London’s future highways assets maintenance costs arising from the carrying out of the authorised development” |
Schedule 10 (document to be certified) | The row relating to the document “Outline Landscape and Ecology Management and Monitoring Plan”, in column (2) for “R010029/APP/6.3” substitute | “TR010029/APP/6.3” |
Schedule 10 (documents to be certified) | The row relating to the document “Preliminary Environmental Design” omit | The entire row |