PART 3CONSTRUCTION OR ALTERATION OF CONTROLLED RESERVOIRS
Supervision by construction engineer
46Safety report: compliance
1
The reservoir manager of a controlled reservoir must (subject to section 61) ensure that any direction in a safety report given to the manager under section 44 is complied with.
2
The construction engineer must, not later than 28 days after being satisfied that each measure directed in the safety report has been taken, give the reservoir manager a safety measure certificate.
3
A safety measure certificate must specify—
a
the safety report to which it relates,
b
the measure taken,
c
any measure that has yet to be taken,
d
any measure that the construction engineer considers need no longer be taken.
4
A construction engineer must, not later than 28 days after giving a safety measure certificate under subsection (2), give the Department a copy of it.