Preparation of drainage schemesN.I.
11.—(1) If the Ministry is of opinion that the carrying out—
(a)of drainage works on a designated watercourse; or
(b)of works on any designated sea defences;
is expedient for the drainage of any land, the Ministry may prepare a scheme for the carrying out of those works, and for that purpose may make such surveys as shall appear to the Ministry to be necessary or expedient.
(2) Every drainage scheme prepared by the Ministry shall contain such provisions as the Ministry may consider necessary for the protection of rights (including rights to water cattle or other animals) or interests affected by the scheme, and shall show, either in the body of the scheme or by means of appropriate maps, drawings, plans, sections and schedules annexed thereto, the following matters—
(a)the watercourses, or the sea defences, proposed to be dealt with;
(b)the land which will be drained or otherwise improved by the carrying out of the scheme;
(c)the details of the drainage works proposed to be carried out in pursuance of the scheme, together with a description of the works to roads, bridges or culverts which will be necessary to enable the scheme to be carried out or to be effective for drainage purposes;
(d)the manner in which it is proposed to implement[ Article 40(2) of the Water (Northern Ireland) Order 1999].
(3) Without prejudice to Article 37, the officers, agents and servants of the Ministry may, at all reasonable times, on production (if so required) of their authority, enter on any land and do there all such things as may appear to them to be reasonably necessary or expedient for the purposes of the preparation of a drainage scheme.
(4) Every reference in this Order to a drainage scheme shall be construed as including every map, drawing, plan, section and schedule annexed to such drainage scheme.