SCHEDULE 7CONFORMITY MARKING
(This Schedule substantially reproduces the provisions of Annex VII to the Transportable Pressure Equipment Directive.)
The conformity marking shall take the following form –
If the marking is reduced or enlarged, the proportions of the drawing must be respected.
The various components of the marking must have substantially the same vertical dimensions, which may not be less than 5 mm.
This minimum dimension may be waived for small vessels.