SCHEDULE 1
NOTE – previous fees in brackets | £ | |
---|---|---|
A. Measuring systems for liquids, other than water, fitted to road tankers, each system, | ||
| 90·00 | (80·00) |
| 25·00 | (22·00) |
| 18·00 | (16·00) |
B. Otherwise, each initial verification – | ||
per man/hour spent at the place of initial verification | Inspector rate 32·00 | (28·00) |
Assistant rate 22·00 | (19·00) |
SCHEDULE 2
In this Schedule, the abbreviation employed to refer to the kilogramme unit of measurement is kg.
NOTE – previous fees in brackets | £ | |
---|---|---|
A. Weighing Instruments – | ||
| ||
capacity as marked on the machine – | ||
not exceeding 100 kg | 18·00 | (16·00) |
exceeding 100 kg but not exceeding 1,000 kg | 41·00 | (36·00) |
exceeding 1,000 kg but not exceeding 5,000 kg | 98·00 | (86·00) |
exceeding 5,000 kg but not exceeding 30,000 kg | 212·00 | (186·00) |
exceeding 30,000 kg | 319·00 | (280·00) |
| 50 per cent of the fee which would be payable if the weighing instrument were only subject to a single stage EC verification | |
B. Otherwise, each verification – | ||
per man/hour spent at the place of verification | Inspector rate 32·00 | (28·00) |
Assistant rate 22·00 | (19·00) |