SCHEDULE 1CONTENT OF GEOTECHNICAL ASSESSMENTS
Requirements during and after construction
8.
A record of the nature and extent of inspection, supervision and safety measures necessary to ensure the safety of the excavation or tip and a specification of necessary engineering works and safety measures. A record of the action to be taken regarding defects specified in the report.