Regulation 5(1) and (2)
SCHEDULE 2
In this Schedule, the abbreviation employed to refer to the kilogramme unit of measurement is kg.
NOTE – previous fees in brackets | £ | |
---|---|---|
A. Weighing Instruments — | ||
(1) subject to single EC verification, each instrument or (if fitted with two or more weigh tables or platforms connected to one or more indicating mechanisms), each weigh table or platform — | ||
capacity as marked on the machine — | ||
not exceeding 100 kg | 22.00 | (21.00) |
exceeding 100 kg but not exceeding 1,000 kg | 48.00 | (47.00) |
exceeding 1,000 kg but not exceeding 5,000 kg | 115.00 | (112.00) |
exceeding 5,000 kg but not exceeding 30,000 kg | 250.00 | (242.00) |
exceeding 30,000 kg | 375.00 | (364.00) |
(2) subject to two stages of EC verification, each stage verification | 50 per cent of the fee which would be payable if the weighing instrument were only subject to a single stage EC verification | |
B. Otherwise, each verification — | ||
per man/hour spent at the place of verification | Inspector rate 37.00 | (36.00) |
Assistant rate 26.00 | (25.00) |