SCHEDULE 16Special measures for the control of Potato Ring Rot

3.

The methods by which material can be required to be disposed of are—

(a)

by destruction;

(b)

by industrial processing at a plant to which the specified plant material is to be delivered direct within such time as may be specified in the notice and in respect of which an inspector is satisfied that—

(i)

appropriate waste disposal facilities are present such that there is no identifiable risk of Potato Ring Rot spreading; and

(ii)

there is an appropriate system of disinfection of storage areas and departing vehicles; or

(c)

by any method other than those referred to in paragraphs (a) and (b) and in respect of which an inspector is satisfied that there is no identifiable risk of Potato Ring Rot spreading.