Introductory Text
1.Citation, commencement and interpretation
2.Designation and direction
3.Stopping-up of roads
4.Classification of traffic
Signature
SCHEDULE
PART I THE NEW ROAD TO BE CONSTRUCTED AS SPECIAL AND TRUNK ROAD AND PART OF THE M2 MOTORWAY AND T7
PART II THE NEW ROADS TO BE CONSTRUCTED AS TRUNK ROADS AND PART OF THE T7
PART III THE LENGTH OF TRUNK ROAD T7 TO BECOME PART OF THE BALLYMENA-KILWAUGHTER TRUNK ROAD T19
PART IV ROADS TO BE STOPPED-UP TO ROAD TRAFFIC
1.A26 Ballee Road East at a point 625 metres south-west...
2.C46 Liminary Road: (a) at a point 160 metres south-east...
PART V ROAD TO BE STOPPED-UP TO VEHICULAR TRAFFIC
Explanatory Note