SCHEDULE 2CONDITIONS AND REQUIREMENTS TO BE COMPLIED WITH BY THE RAILWAY UNDERTAKING

Article 3 (c)

I11

The carriageway shall be approximately 6.15 metres wide at the crossing.

Annotations:
Commencement Information
I1

Sch. 2 para. 1 in operation at 20.2.2023, see art. 1(1)

I22

The ground at the two edge of the carriageway over the crossing shall be made-up to the level of the carriageway for the distance of approximately 1.8 metres beyond the edge to the north west and 1.5 metres beyond the edge to the south east, forming footways to either side of the carriageway.

Annotations:
Commencement Information
I2

Sch. 2 para. 2 in operation at 20.2.2023, see art. 1(1)

I33

The surface of the carriageway and footway/run-off areas over the crossing shall be maintained in good and even condition.

Annotations:
Commencement Information
I3

Sch. 2 para. 3 in operation at 20.2.2023, see art. 1(1)

I44

The barriers shall be kept in the fully raised position except during the time when engines, carriages or other vehicles passing along the railway have occasion to cross the road.

Annotations:
Commencement Information
I4

Sch. 2 para. 4 in operation at 20.2.2023, see art. 1(1)

I55

The electric lamps or equivalent (light emitting diodes) on each barrier mentioned in Schedule 1 shall be lit at all times except when the barriers are in the fully raised position.

Annotations:
Commencement Information
I5

Sch. 2 para. 5 in operation at 20.2.2023, see art. 1(1)

I66

The crossing shall be illuminated during the hours of darkness to such a standard that the operator can ascertain in conditions of normal visibility that the crossing is clear before the barriers are fully lowered.

Annotations:
Commencement Information
I6

Sch. 2 para. 6 in operation at 20.2.2023, see art. 1(1)

I77

The protecting signals shall be controlled from the signalling control centre containing the crossing control point.

Annotations:
Commencement Information
I7

Sch. 2 para. 7 in operation at 20.2.2023, see art. 1(1)

I88

The picture of the crossing shall be exhibited on the television monitor before the sequence of events to close the crossing to road traffic begins. The picture shall continue to be exhibited until either the barriers are fully raised after the ‘raise’ push-button is pressed, or if automatic raising is in operation after the ‘crossing-clear’ push-button is pressed.

Annotations:
Commencement Information
I8

Sch. 2 para. 8 in operation at 20.2.2023, see art. 1(1)

I99

Visual indictors and an audible alarm shall be provided at the control point. The indicators shall show when:

a

the main power supply is available;

b

all barriers are fully raised;

c

all the barriers are fully lowered;

d

at least one of the intermittent red lights of the traffic light signals on each side of the railway is showing along the carriageway.

Annotations:
Commencement Information
I9

Sch. 2 para. 9 in operation at 20.2.2023, see art. 1(1)

I1010

The audible alarm shall sound if:

a

any barrier is horizontally dislocated when in the fully lowered position;

b

the main power supply fails;

c

all the red traffic light signals facing in one direction fail.

Annotations:
Commencement Information
I10

Sch. 2 para. 10 in operation at 20.2.2023, see art. 1(1)

I1111

When the ‘lower’ push-button is pressed, or the train initiates the automatic lower sequence, the sequence of events to close the crossing to road traffic shall begin. The sequence shall be:

a

the amber lamps shall immediately show, and the audible warning shall begin. The lights shall show for approximately 3 seconds;

b

immediately the amber lamps are extinguished the intermittent red lights shall show;

c

4 to 6 seconds later, the left-hand side barriers shall begin to descend and shall take a further 6 to 10 seconds to reach the lowered position;

d

all boom lights shall illuminate when the first barrier moves out of the fully raised position;

e

once the entrance barriers have reached the down position the right-hand side barriers shall then begin to descend taking 6 to 10 seconds to reach the lowered position;

f

the audible warning shall stop when all the barriers are fully lowered;

g

the train can then approach and pass over the crossing.

Annotations:
Commencement Information
I11

Sch. 2 para. 11 in operation at 20.2.2023, see art. 1(1)

I1212

The arrangements shall be such that the protecting railway signals can only be cleared after the barriers are fully lowered and the ‘crossing clear’ push-button has been pressed. Unless the protecting signals have been cleared for another train, all the barriers shall rise simultaneously either after the ‘raise’ push-button has been pressed or automatically as soon as the train has passed clear of the crossing.

Annotations:
Commencement Information
I12

Sch. 2 para. 12 in operation at 20.2.2023, see art. 1(1)

I1313

If a train overruns a protecting signal the arrangements shall be such that the red lights will immediately show omitting the amber sequence, the audible warning shall sound and all barriers remain in the raised position.

Annotations:
Commencement Information
I13

Sch. 2 para. 13 in operation at 20.2.2023, see art. 1(1)

I1414

Stowmarket Controls will be provided for signal CE283 at Cullybackey Station. When the Automatic Lower/ Stowmarket sequence is initiated the normal traffic light sequence of amber followed by flashing red lights shall begin. If Automatic Lower is selected and the route is set, the crossing closure sequence shall continue by lowering the barriers. If Automatic Lower is not available and selected or the route not set, an audible alarm shall sound when the traffic light signals are initiated and the barriers shall not lower without the signaller’s intervention. The barriers can be lowered at any time by the operation of the ‘Lower’ button or the traffic light signals can be cancelled by pressing the ‘Stop’ or ‘Raise’ button after a period of time that will have proved the train at a stand.

Annotations:
Commencement Information
I14

Sch. 2 para. 14 in operation at 20.2.2023, see art. 1(1)

I1515

The intermittent red lights shall continue to show until the barriers have begun to rise and shall be extinguished before the barriers have risen to an angle of 45 degrees above the horizontal.

Annotations:
Commencement Information
I15

Sch. 2 para. 15 in operation at 20.2.2023, see art. 1(1)

I1616

If, during the lowering sequence, both red road lights on any RTL are failed before the point in the sequence that the barriers are due to start lowering, then the barriers shall remain in the raised position. In this situation, the barriers can only be lowered from the local control unit until the fault is rectified. Once the barriers have begun to lower a further red light failure shall not stop or prevent them lowering.

Annotations:
Commencement Information
I16

Sch. 2 para. 16 in operation at 20.2.2023, see art. 1(1)

I1717

If the barriers do not achieve the fully raised position within 10 seconds of starting to raise, then the barriers stop in their present positions. The red RTL’s shall re-illuminate and a failed indication and alarm is given at the supervising control centre. A further 2 seconds may be added if required to allow for relay operation.

Annotations:
Commencement Information
I17

Sch. 2 para. 17 in operation at 20.2.2023, see art. 1(1)

I1818

A failure indication can only be extinguished when the barriers are either in the fully raised or fully lowered position. In the fully raised position, the failure indication shall only extinguish if the RTL’s are also extinguished. RTL’s shall be taken to be extinguished if the controls are set for them to be extinguished. No light proving is required.

Annotations:
Commencement Information
I18

Sch. 2 para. 18 in operation at 20.2.2023, see art. 1(1)

I1919

If automatic lowering or raising should take an abnormally long time an audible and visual warning shall be given at the control point.