xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Article 3 (c)

SCHEDULE 2N.I.CONDITIONS AND REQUIREMENTS TO BE COMPLIED WITH BY THE RAILWAY UNDERTAKING

1.  The carriageway shall be approximately 6.15 metres wide at the crossing.N.I.

Commencement Information

I1Sch. 2 para. 1 in operation at 20.2.2023, see art. 1(1)

2.  The ground at the two edge of the carriageway over the crossing shall be made-up to the level of the carriageway for the distance of approximately 1.8 metres beyond the edge to the north west and 1.5 metres beyond the edge to the south east, forming footways to either side of the carriageway.N.I.

Commencement Information

I2Sch. 2 para. 2 in operation at 20.2.2023, see art. 1(1)

3.  The surface of the carriageway and footway/run-off areas over the crossing shall be maintained in good and even condition.N.I.

Commencement Information

I3Sch. 2 para. 3 in operation at 20.2.2023, see art. 1(1)

4.  The barriers shall be kept in the fully raised position except during the time when engines, carriages or other vehicles passing along the railway have occasion to cross the road.N.I.

Commencement Information

I4Sch. 2 para. 4 in operation at 20.2.2023, see art. 1(1)

5.  The electric lamps or equivalent (light emitting diodes) on each barrier mentioned in Schedule 1 shall be lit at all times except when the barriers are in the fully raised position.N.I.

Commencement Information

I5Sch. 2 para. 5 in operation at 20.2.2023, see art. 1(1)

6.  The crossing shall be illuminated during the hours of darkness to such a standard that the operator can ascertain in conditions of normal visibility that the crossing is clear before the barriers are fully lowered.N.I.

Commencement Information

I6Sch. 2 para. 6 in operation at 20.2.2023, see art. 1(1)

7.  The protecting signals shall be controlled from the signalling control centre containing the crossing control point.N.I.

Commencement Information

I7Sch. 2 para. 7 in operation at 20.2.2023, see art. 1(1)

8.  The picture of the crossing shall be exhibited on the television monitor before the sequence of events to close the crossing to road traffic begins. The picture shall continue to be exhibited until either the barriers are fully raised after the ‘raise’ push-button is pressed, or if automatic raising is in operation after the ‘crossing-clear’ push-button is pressed.N.I.

Commencement Information

I8Sch. 2 para. 8 in operation at 20.2.2023, see art. 1(1)

9.  Visual indictors and an audible alarm shall be provided at the control point. The indicators shall show when:N.I.

(a)the main power supply is available;

(b)all barriers are fully raised;

(c)all the barriers are fully lowered;

(d)at least one of the intermittent red lights of the traffic light signals on each side of the railway is showing along the carriageway.

Commencement Information

I9Sch. 2 para. 9 in operation at 20.2.2023, see art. 1(1)

10.  The audible alarm shall sound if:N.I.

(a)any barrier is horizontally dislocated when in the fully lowered position;

(b)the main power supply fails;

(c)all the red traffic light signals facing in one direction fail.

Commencement Information

I10Sch. 2 para. 10 in operation at 20.2.2023, see art. 1(1)

11.  When the ‘lower’ push-button is pressed, or the train initiates the automatic lower sequence, the sequence of events to close the crossing to road traffic shall begin. The sequence shall be:N.I.

(a)the amber lamps shall immediately show, and the audible warning shall begin. The lights shall show for approximately 3 seconds;

(b)immediately the amber lamps are extinguished the intermittent red lights shall show;

(c)4 to 6 seconds later, the left-hand side barriers shall begin to descend and shall take a further 6 to 10 seconds to reach the lowered position;

(d)all boom lights shall illuminate when the first barrier moves out of the fully raised position;

(e)once the entrance barriers have reached the down position the right-hand side barriers shall then begin to descend taking 6 to 10 seconds to reach the lowered position;

(f)the audible warning shall stop when all the barriers are fully lowered;

(g)the train can then approach and pass over the crossing.

Commencement Information

I11Sch. 2 para. 11 in operation at 20.2.2023, see art. 1(1)

12.  The arrangements shall be such that the protecting railway signals can only be cleared after the barriers are fully lowered and the ‘crossing clear’ push-button has been pressed. Unless the protecting signals have been cleared for another train, all the barriers shall rise simultaneously either after the ‘raise’ push-button has been pressed or automatically as soon as the train has passed clear of the crossing.N.I.

Commencement Information

I12Sch. 2 para. 12 in operation at 20.2.2023, see art. 1(1)

13.  If a train overruns a protecting signal the arrangements shall be such that the red lights will immediately show omitting the amber sequence, the audible warning shall sound and all barriers remain in the raised position.N.I.

Commencement Information

I13Sch. 2 para. 13 in operation at 20.2.2023, see art. 1(1)

14.  Stowmarket Controls will be provided for signal CE283 at Cullybackey Station. When the Automatic Lower/ Stowmarket sequence is initiated the normal traffic light sequence of amber followed by flashing red lights shall begin. If Automatic Lower is selected and the route is set, the crossing closure sequence shall continue by lowering the barriers. If Automatic Lower is not available and selected or the route not set, an audible alarm shall sound when the traffic light signals are initiated and the barriers shall not lower without the signaller’s intervention. The barriers can be lowered at any time by the operation of the ‘Lower’ button or the traffic light signals can be cancelled by pressing the ‘Stop’ or ‘Raise’ button after a period of time that will have proved the train at a stand.N.I.

Commencement Information

I14Sch. 2 para. 14 in operation at 20.2.2023, see art. 1(1)

15.  The intermittent red lights shall continue to show until the barriers have begun to rise and shall be extinguished before the barriers have risen to an angle of 45 degrees above the horizontal.N.I.

Commencement Information

I15Sch. 2 para. 15 in operation at 20.2.2023, see art. 1(1)

16.  If, during the lowering sequence, both red road lights on any RTL are failed before the point in the sequence that the barriers are due to start lowering, then the barriers shall remain in the raised position. In this situation, the barriers can only be lowered from the local control unit until the fault is rectified. Once the barriers have begun to lower a further red light failure shall not stop or prevent them lowering.N.I.

Commencement Information

I16Sch. 2 para. 16 in operation at 20.2.2023, see art. 1(1)

17.  If the barriers do not achieve the fully raised position within 10 seconds of starting to raise, then the barriers stop in their present positions. The red RTL’s shall re-illuminate and a failed indication and alarm is given at the supervising control centre. A further 2 seconds may be added if required to allow for relay operation.N.I.

Commencement Information

I17Sch. 2 para. 17 in operation at 20.2.2023, see art. 1(1)

18.  A failure indication can only be extinguished when the barriers are either in the fully raised or fully lowered position. In the fully raised position, the failure indication shall only extinguish if the RTL’s are also extinguished. RTL’s shall be taken to be extinguished if the controls are set for them to be extinguished. No light proving is required.N.I.

Commencement Information

I18Sch. 2 para. 18 in operation at 20.2.2023, see art. 1(1)

19.  If automatic lowering or raising should take an abnormally long time an audible and visual warning shall be given at the control point.N.I.

Commencement Information

I19Sch. 2 para. 19 in operation at 20.2.2023, see art. 1(1)