SCHEDULE 4WASTE FRAMEWORK DIRECTIVE
PART 1GENERAL
Matters to be covered by permits8
When a pollution control authority grants or modifies a permit, and the activities authorised by the permit include the treatment of waste, the pollution control authority must ensure that the permit covers—
a
the types and quantities of waste to be treated;
b
for each type of operation permitted, the technical and any other requirements relevant to the site;
c
the safety and precautionary measures to be taken;
d
the treatment site;
e
such monitoring and control operations as may be necessary;
f
such closure and after-care provisions as may be necessary;
g
the treatment method to be used for each type of operation;
h
the relevant operation code from Part II or III of this Schedule, where applicable; and
i
for each type of operation permitted, the maximum annual capacity to treat or dispose of waste.