Article 2
SCHEDULE 1
The works referred to in this Order and shown on the deposited plan marked “The West of Scotland Water Authority (Dalmally, River Strae) Water Order 2000, Plan of Catchment Area, Location Plans and Plans and Sections of Works” are–
Works | An intake pipe 8 metres or thereby in length leading from the north bank of the River Strae to a structure incorporating a maximum flow rate limiting device, pumps and an approved gauge to measure and record the amount of water taken from the river and the rate at which the said amount was taken. |