SCHEDULE 1
The works referred to in this Order and shown on the deposited plan are:–
Works No. 1 | An intake structure incorporating an arrangement of weirs to limit abstraction from the river such that a supply is taken only when the stream flow exceeds the specified residual flow rate and to ensure that the maximum rate of abstraction is not exceeded. It also includes an approved gauge to measure and record the compensation water taken from the river. |
Works No. 2 | A raw water main from the intake on Abhainn a' Mhinisteir to the new Treatment Works. |
Works No. 3 | A Treatment Works containing an approved gauge and instrumentation to measure and record the amount of water taken from the intake. |
Works No. 4 | A bankside storage reservoir for raw water. |