SCHEDULE 1

Article 2

The works referred to in this Order and shown on the deposited plan are:–

Works No. 1

An intake structure incorporating an arrangement of weirs to limit abstraction from the river such that a supply is taken only when the stream flow exceeds the specified residual flow rate and to ensure that the maximum rate of abstraction is not exceeded. It also includes an approved gauge to measure and record the compensation water taken from the river.

Works No. 2

A raw water main from the intake on Abhainn a' Mhinisteir to the new Treatment Works.

Works No. 3

A Treatment Works containing an approved gauge and instrumentation to measure and record the amount of water taken from the intake.

Works No. 4

A bankside storage reservoir for raw water.

SCHEDULE 2

Article 3

The modifications and adaptations of Schedule 4 to the Act referred to in Article 3 of this Order are–

Section 10(3)

If the West of Scotland Water Authority–

a

fail to construct or maintain in good order any such gauge as is mentioned in the West of Scotland Water Authority (Craighouse, Abhainn a' Mhinisteir) Water Order 2000, or refuse to allow any person interested to inspect and examine any such gauge or any records made thereby or kept by them in connection therewith or to take copies of any such records; or

b

take any water contrary to the provisions of the West of Scotland Water Authority (Craighouse, Abhainn a' Mhinisteir) Water Order 2000,

they shall, without prejudice to their civil liability, if any, to a person aggrieved, be liable, in the case of an offence under paragraph (a) of this subsection, on summary conviction to a fine not exceeding level 3 on the standard scale and, in the case of an offence under paragraph (b) of this subsection–

i

on summary conviction, to a fine not exceeding the statutory maximum; and

ii

on conviction on indictment, to a fine.