10.—(1) A landfill permit shall include conditions specifying the list of defined types, and the total quantity, of waste authorised to be deposited in the landfill.
(2) A landfill permit shall also include appropriate conditions–
(a)specifying requirements for–
(i)preparations for the landfill, and the carrying out of, landfilling operations;
(ii)monitoring and control procedures, including contingency plans and indicator parameters as set out in paragraph 4 of Schedule 4;
(b)ensuring that the financial provision or its equivalent required by [F1regulation 18(4)(b) of the 2012 Regulations] is maintained until the permit is surrendered in accordance with those Regulations;
(c)ensuring that the landfill is operated in such a manner that the necessary measures are taken to prevent accidents and to limit their consequences; and
(d)requiring the operator to report to SEPA, at such period as SEPA may require, and in any event annually–
(i)the types and quantities of waste disposed of; and
(ii)the results of the monitoring programme required by regulations 16 and 17.
(3) A landfill permit shall also include–
(a)appropriate conditions for ensuring compliance with the requirements of the following provisions of these Regulations–
(i)Schedule 3 (general requirements for all landfills);
(ii)regulation 11 (prohibition of acceptance of certain wastes at landfills);
(iii)regulation 12 (waste which may be accepted in the different classes of landfill);
(iv)regulation 13 (costs of disposal of waste in landfills);
(v)regulation 14 (waste acceptance procedures);
(vi)regulation 15 (initial site inspections by SEPA);
(vii)regulation 16 (control and monitoring of operational landfill sites); and
(viii)regulation 17 (closure and after care procedures for landfills); and
F2(aa). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(b)such other conditions as appear appropriate to SEPA, including in particular conditions giving effect to–
(i)any requirement imposed by [F3[F4assimilated] law] or national legislation; and
(ii)in the case of landfills falling within paragraph (a) of Part A of Section 5.2 of Part 1 of Schedule 1 to [F5the 2012 Regulations], the principle that energy should be used efficiently.
(4) The provisions of these Regulations mentioned in paragraph (3)(a) above impose obligations directly on an operator of a landfill (rather than through the conditions of a landfill permit) only to the extent specified in paragraph 3 of Schedule 5.
Textual Amendments
F1Words in reg. 10(2)(b) substituted (7.1.2013) by The Pollution Prevention and Control (Scotland) Regulations2012 (S.S.I. 2012/360), reg. 1(2), Sch. 11 para. 11(3) (with reg. 71)
F2Reg. 10(3)(aa) omitted (31.12.2020) by virtue of The Environment (EU Exit) (Scotland) (Amendment etc.) Regulations 2019 (S.S.I. 2019/26), regs. 1, 9(3)(a); 2020 c. 1, Sch. 5 para. 1(1)
F3Words in reg. 10(3)(b)(i) substituted (31.12.2020) by The Environment (EU Exit) (Scotland) (Amendment etc.) Regulations 2019 (S.S.I. 2019/26), regs. 1, 9(3)(b); 2020 c. 1, Sch. 5 para. 1(1)
F4Word in reg. 10(3)(b)(i) substituted (1.1.2024) by The Retained EU Law (Revocation and Reform) Act 2023 (Consequential Amendments) (Scotland) Regulations 2023 (S.S.I. 2023/374), reg. 1(1), sch. 2 para. 3(2)
F5Words in reg. 10(3)(b)(ii) substituted (7.1.2013) by The Pollution Prevention and Control (Scotland) Regulations2012 (S.S.I. 2012/360), reg. 1(2), Sch. 11 para. 11(4) (with reg. 71)