Search Legislation

The Landfill (Scotland) Regulations 2003

Changes over time for: SCHEDULE 4

 Help about opening options

Version Superseded: 01/08/2013

Alternative versions:

Status:

Point in time view as at 27/03/2011.

Changes to legislation:

There are currently no known outstanding effects for the The Landfill (Scotland) Regulations 2003, SCHEDULE 4. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.

Regulations 16(2) and 17(5)(c)

SCHEDULE 4SMINIMUM MONITORING PROCEDURES FOR LANDFILLS

Application of this ScheduleS

1.  This Schedule sets out minimum procedures for monitoring to be carried out to check–

(a)that waste has been accepted for disposal only if it fulfils the relevant waste acceptance criteria;

(b)that the processes within the landfill proceed as required;

(c)that environmental protection systems are functioning fully as intended; and

(d)that the conditions of the landfill permit are fulfilled.

Emission data: water, leachate and gas controlS

2.—(1) Samples of leachate or surface water (if present) must be collected at representative points.

(2) Sampling and measuring of the volume and composition of any leachate must be performed separately at each point at which leachate is discharged from the site.

(3) Monitoring of surface water (if present) shall take place at at least two points, one upstream from the landfill and one downstream.

(4) Gas monitoring must be carried out for each section of the landfill and representative samples must be collected and analysed in accordance with Table 1.

(5) A sample of leachate and water representative of the average composition, shall be taken for monitoring purposes in accordance with Table 1.

TABLE 1

Notes to Table 1

(1) Longer intervals may be allowed if the evaluation of data indicates that they would be equally effective. For leachates, the conductivity must always be measured at least once a year.

(2) These do not apply where leachate collection is not required under paragraph 2(1)(c) of Schedule 3.

(3) The frequency of sampling may be adapted on the basis of the morphology of the landfill waste (in tumulus, buried, etc) (but only if SEPA considers that the conditions of the landfill permit should allow for it).

(4) The parameters to be measured and substances to be analysed vary according to the composition of the waste deposited. They must be specified in the conditions of the landfill permit and reflect the leaching characteristics of the wastes.

(5) On the basis of the characteristics of the landfill site, SEPA may determine that these measurements are not required.

(6) These measurements are related mainly to the content of the organic material in the waste.

(7) CH4, CO2, O2 regularly, other gases as required, according to the composition of the waste deposited, with a view to reflecting its leaching properties.

(8) Efficiency of the gas extraction system must be checked regularly.

 Operational phaseAfter-care phase (3)
Leachate volume (2)Monthly (1), (3)Every six months
Leachate composition (2) (4)Quarterly (1)Every six months
Volume and composition of surface water (5)Quarterly (1)Every six months
Potential gas emissions and atmospheric Pressure (6) (CH4, CO2, O2, H2S, H2 etc)Monthly (1), (7)Every six months (8)

Protection of groundwater : SamplingS

3.—(1) The sampling measurements must be sufficient to provide information on groundwater likely to be affected by the discharge from the landfill, with at least one measuring point in the groundwater inflow region and two in the outflow region.

(2) The number of measurements referred to in sub-paragraph (1) may be increased on the basis of a specific hydrogeological survey on the need for an early identification of accidental leachate release in the groundwater.

(3) Sampling must be carried out in at least three locations before the filling operations in order to establish reference values for future sampling.

Protection of groundwater : MonitoringS

4.—(1) The monitoring of groundwater shall be carried out in accordance with Table 2.

(2) The parameters to be analysed in the samples taken must be derived from the expected composition of the leachate and the groundwater quality in the area.

(3) In selecting the parameters for analysis the mobility in the groundwater zone must be taken into account.

(4) Parameters may include indicator parameters in order to ensure an early recognition of change in water quality. The recommended parameters are pH, TOC, phenols, heavy metals, fluoride, As, oil/hydrocarbons.

TABLE 2

Notes to Table 2

(9) If there are fluctuating groundwater levels, the frequency must be increased.

(10) The frequency must be based on the possibility for remedial action between two samplings if a trigger level is reached, i.e. the frequency must be determined on the basis of knowledge and the evaluation of the velocity of groundwater flow.

(11) When a trigger level is reached (see paragraph 5), verification is necessary by repeating the sampling. When the level has been confirmed, a contingency plan set out in the landfill permit conditions must be followed.

 Operational phaseAfter-care phase
Level of groundwaterEvery six months (9)Every six months (9)
Groundwater compositionSite-specific frequency (10), (11)Site-specific frequency (10), (11)

Protection of groundwater :Trigger levelsS

5.—(1) Significant adverse environmental effects, as referred to in regulations 16(3) and 17(5)(b), should be considered to have occurred in the case of groundwater, when an analysis of a groundwater sample shows a significant change in water quality.

(2) The level at which the effects referred to in sub-paragraph (1) are considered to have occurred (“the trigger level”) must be determined taking account of the specific hydrogeological formations in the location of the landfill and groundwater quality.

(3) The trigger level must be set out in the conditions of a landfill permit whenever possible.

(4) The observations must be evaluated by means of control charts with established control rules and levels for each downgradient well.

(5) The control levels must be determined from local variations in groundwater quality.

Topography of the site: data on the landfill bodyS

6.  The topography of the site and settling behaviour of the landfill body shall be monitored in accordance with Table 3.

TABLE 3

Note to Table 3

(12) Data for the status plan of the concerned landfill: surface occupied by waste, volume and composition of waste, methods of depositing, time and duration of depositing, calculation of the remaining capacity still available at the landfill.

 Operating phaseAfter-care phase
Structure and composition of landfill body (12)Yearly 
Settling behaviour of the level of the landfill bodyYearlyYearly reading

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources