Print Options
PrintThe Whole
Instrument
PrintThis
Schedule
only
Status:
This is the original version (as it was originally made). This item of legislation is currently only available in its original format.
Article 2
SCHEDULE 1
The works referred to in this Order and shown on the deposited plan are–
Work No. 1:
Installation of a Rundown Screen on the existing raw water pipeline located at Ordnance Survey National Grid Reference NC 23450 31030.
Work No. 2:
Installation of an approved gauge housed within a new water treatment works, located at Ordnance Survey National Grid Reference NC 23405 31039 (the construction of which treatment works is not authorised hereunder).
Back to top