Article 2
SCHEDULE
The works referred to in this Order and shown on the deposited plan are–
Works No. 1:
Installation of a rundown screen on a bypass to the existing raw water pipeline.
Works No. 2:
Installation of a gauging chamber containing a marked v-notch weir on the existing compensation flow discharge pipe.
Works No. 3:
Installation of a raw water pipeline linking the existing pipeline to the abstraction chamber located at Ordnance Survey National Grid Reference NG 428 625.
Works No. 4:
Installation of an approved gauge to be housed within an existing water treatment works, located at Ordnance Survey National Grid Reference NG 418 625 (the construction of which treatment works is not authorised hereunder).