SCHEDULENEW PART 6 OF SCHEDULE 3 TO THE POLLUTION PREVENTION AND CONTROL (SCOTLAND) REGULATIONS 2000

Regulation 2(4)

PART 6:REFUELLING INSTALLATIONS

26

1

The prescribed date for a new refuelling installation is 1st January 2012.

2

The prescribed date for an existing refuelling installation is–

a

where an application for a permit to operate the existing refuelling installation is made by 1st January 2012, the determination date for that existing refuelling installation; or

b

where no such application is made, 1st January 2012.

3

Where an installation which is subject to a permit under these Regulations contains an existing refuelling installation, the operator shall not operate that installation after the relevant prescribed date specified in sub-paragraph (2) except under and to the extent authorised by a variation of the conditions of that permit granted by SEPA under regulation 13.

4

In this Part–

  • “determination date” has the same meaning as in paragraph 6 of Part 1 of Schedule 3; and

  • “existing refuelling installation” means an installation where an activity falling within paragraph (d) of Part B of Section 1.2 of Schedule 1 is carried out;

  • “new refuelling installation” means an installation where an activity falling within paragraph (e) of Part B of Section 1.2 of Schedule 1 is carried out.