The Port of Ardersier Harbour Revision Order 2014

Power to construct works

4.—(1) Subject to the provisions of this Order, the Company may in the lines and situations and upon the lands delineated on the deposited plans and within the limits of deviation shown thereon and according to the levels shown on the deposited sections, construct and maintain in the Highland Area, Inverness District the works hereinafter described, with all necessary works and conveniences connected therewith—

Works No. 1 (Sheet 1) – Removal of existing sheet piled quay walls between NH 80174 58491 (Point 1) to NH 80216 58464 (Point 2), between NH 80250 58353 (Point 3) to NH 80301 58327 (Point 4) and between NH 81403 57768 (Point 5) to NH 80433 58338 (Point 6). Construction of new piled quay wall commencing at NH 81747 57565 (Point 7) and terminating at a point at NH 79693 58530 (Point 8).

Works No. 2 (Sheet 2) – Construction of slipway system commencing at a point at NH 79707 57874 (Point 1) and terminating at a point at NH 79774 58563 (Point 2).

Works No. 3 (Sheet 3) – Formation of main dredged access channel and dredged access pocket, nominal navigable width 120m plus side slopes, commencing at a point at NH 81772 57603 (Point 1) and terminating at a point at NH 79617 59316 (Point 2).

Works No. 4 (Sheet 4) – Construction of ship lift structure, commencing at a point at NH 79904 58515 (Point 1) and terminating at a point at NH 79964 58509 (Point 2).

(2) The Company may, for the purposes of Work No 1, enclose and reclaim so much of the bed of Whiteness Channel and of the foreshore as lies within the limits of deviation and may hold and use the same as part of the undertaking.

(3) The Company may, within the limits of deviation, reconstruct, extend, enlarge, replace or relay the works authorised by paragraph (1) and may maintain the same as reconstructed, extended, enlarged, replaced, or re-laid.