F1SCHEDULE 1AMONITORING: MINIMUM REQUIREMENTS

Annotations:

PART DSampling methods and sampling points

2

Subject to paragraph 1, sampling at the point of compliance must meet the following requirements:—

a

a sample for copper, lead or nickel must be taken at the consumer’s tap without prior flushing;

b

a sample for any such parameter or any other chemical parameter must—

i

be a random daytime sample of one litre volume; or

ii

use a fixed stagnation time method that better reflects the national situation, provided that, at the water supply zone level, this does not result in fewer cases of non-compliance than using the random daytime method; and

c

a sample for microbiological parameters at the point of compliance must be taken and handled in accordance with sampling purpose B of European standard EN ISO 19458:2006 entitled “Water quality - Sampling for microbiological analysis (ISO 19458:2006)”.