Search Legislation

The Domestic Renewable Heat Incentive Scheme Regulations 2014

Draft Legislation:

This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Domestic Renewable Heat Incentive Scheme Regulations 2014 No. 928

Calculation of eligible metered heat generated by heat pumps

This section has no associated Explanatory Memorandum

31.—(1) Subject to paragraph (10), the eligible metered heat in kWh for an accredited domestic plant which is a heat pump for any quarterly period is calculated in accordance with the following formula—

where—

(a)

A is calculated in accordance with paragraph (2);

(b)

B is calculated in accordance with paragraph (3);

(c)

C is calculated in accordance with paragraph (5);

(d)

D is calculated in accordance with paragraph (7); and

(e)

E is calculated in accordance with paragraph (8).

(2) A is—

(a)0.97 if any of the heat referred to in paragraph (3) is generated by an accredited domestic plant which is an air source heat pump for the purposes of defrosting; or

(b)1 in any other case.

(3) Subject to paragraph (4), B is the heat in kWh recorded by eligible meters positioned in accordance with regulation 16 generated by—

(a)the components of the accredited domestic plant specified in the metering statement as being included in this calculation; or

(b)the components referred to in sub-paragraph (a) and any additional plants if the heat generated by the accredited domestic plant is recorded together with the heat generated by such additional plants.

(4) Where any of the heat referred to in paragraph (3) is recorded at the point where it leaves a domestic hot water cylinder, the heat recorded at that point is multiplied by 1.43 before being included (with the heat recorded at any other point) in B.

(5) C is—

(a)subject to paragraph (6), the heat in kWh generated by any additional plants included in B if the relevant metering statement specifies that eligible meters must be installed in accordance with regulation 16(3), or if it specifies that eligible meters must be installed in accordance with regulation 16(5) and the authorised metering arrangement provides for eligible meters to be located to record such heat; or

(b)0 in any other case.

(6) Where any heat generated by any additional plants included in B is generated by an air source heat pump for the purposes of defrosting, all heat generated by that air source heat pump is multiplied by 0.97 before being included in C.

(7) D is—

(a)the energy content in kWh of any fuel which is used by the accredited domestic plant or any additional plants when generating the heat included in B if the relevant metering statement specifies that eligible meters must be installed in accordance with—

(i)regulation 16(4); or

(ii)regulation 16(5) and the authorised metering arrangement provides for eligible meters to be located to record such relevant energy consumption; or

(b)0 in any other case.

(8) E is—

(a)subject to paragraph (9), the electricity consumption in kWh by the accredited domestic plant and any additional plants used to generate the heat referred to in paragraph (3) if the relevant metering statement specifies that eligible meters must be installed in accordance with—

(i)regulation 16(2), (3) or (4); or

(ii)regulation 16(5) and the authorised metering arrangement provides for eligible meters to be located to record such relevant energy consumption; or

(b)0 in any other case.

(9) Any electricity consumed when providing cooling is excluded from the electricity consumption referred to in paragraph (8)(a) before that consumption is included in E if—

(a)the relevant metering statement states that eligible meters must be installed in accordance with regulation 16(5); and

(b)the authorised metering arrangement provides for eligible meters to be located to record—

(i)electricity consumption by the accredited domestic plant while the plant is providing cooling to the RHI property separately from any other electricity consumption; or

(ii)sufficient information about the accredited domestic plant to enable the electricity consumption when providing cooling to be determined.

(10) Where the plant is a ground source heat pump, its eligible metered heat is the heat extracted from the ground (including water in the ground), surface water or both if—

(a)the relevant metering statement states that eligible meters must be installed in accordance with regulation 16(5); and

(b)the authorised metering arrangement provides for eligible meters to be located to record such heat.

(11) In this regulation—

“relevant energy consumption” has the same meaning as in regulation 16; and

“relevant metering statement” means the metering statement for the accredited domestic plant.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Draft Explanatory Memorandum

Draft Explanatory Memorandum sets out a brief statement of the purpose of a Draft Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Draft Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources