Base periods4.
(1)
The base period for the first levy period is the period of twelve months beginning with 6th April 2020.
(2)
The base period for the second levy period is the period of twelve months beginning with 6th April 2021.
(3)
The base period for the third levy period is the period of twelve months beginning with 6th April 2022.