Part IIIWorks

13Power to construct work

(1)

Subject to the provisions of this Act, the Company may make and maintain in the lines and situations and upon the lands delineated on the deposited plan and according to the levels shown on the deposited sections the following work in the city that is to say:—

Work No. 1 A land reclamation along the Cattewater shore from the wharf adjacent to the disused power station to Cattedown Wharves and into the Cattewater commencing at grid reference SX4986 5382 then curving in a southerly direction for a distance of 30 metres or thereabouts to grid reference SX4987 5380 then proceeding in a generally south-south-westerly direction for a distance of 280 metres or thereabouts to grid reference SX4975 5355 then curving in a generally westerly direction for a distance of 60 metres or thereabouts to grid reference SX4970 5352 then proceeding in a generally westerly direction for a distance of 60 metres or thereabouts and terminating at grid reference SX4964 5352 on the shoreline.

(2)

The Company may, within the limits of deviation for the said work, alter, replace or re-lay the same.

(3)

The Company may by means of the work fill in, and reclaim from the foreshore and bed of the sea and may hold and use, so much of the foreshore and bed of the sea as is situated within the limits of deviation.