Leeds Supertram Act 1993

9Level crossings

(1)The Executive may, in the construction of the authorised railways, carry the same with a double line across and on the level of each of the roads specified in Schedule 2 to this Act.

(2)In the exercise of the powers of subsection (1) above, the Executive may alter or interfere with the level of any footway upon which any railway or associated work is to be laid.