SCHEDULE 1The authorised works
Part IDescription of works specifically authorised
In the London boroughs of Merton, Sutton and Croydon—
Work No. 1 A railway (9,307 metres in length) commencing at a point 100 metres west of the junction of Hartfield Crescent with Hartfield Road, passing south-eastwards along the course of the Wimbledon Railway, passing over the River Wandle by means of the existing bridges, passing beneath the existing bridge carrying Carshalton Road over the Sutton and Wimbledon Railways, then passing to the south of Mitcham Junction Station, passing over the Sutton Railway including a new bridge over that railway, then rejoining the course of the Wimbledon Railway, passing over the West Croydon Railway including a bridge over that railway, passing north-eastwards along the north-western side of Waddon New Road, then along that road from a point 30 metres north-east of the junction of that road with Lower Church Street to the junction of Waddon New Road and Cairo New Road, then passing south-eastwards along the course of that road and terminating at a point 115 metres north-west of the junction of that road with Reeves Corner.
In the London borough of Merton—
Work No. 1A A footbridge (63 metres in length) commencing at a point 125 metres south of the junction of Wimbledon Bridge with St George’s Road, passing south-eastwards and southwards over the South Western Railway, and terminating at a point 95 metres west of the junction of Hartfield Crescent with Hartfield Road;
Work No. 1B A footpath (82 metres in length) commencing at a point 360 metres east of the bridge carrying Carshalton Road over the Sutton and Wimbledon Railways, passing south-westwards, then southwards by means of a subway beneath Work No. 1, then eastwards, and terminating at a point 46 metres south of its commencement.
In the London borough of Croydon—
Work No. 1C A footbridge (63 metres in length) commencing at a point 50 metres north-west of the junction of Ridge’s Yard with Waddon New Road passing south-eastwards beneath the bridge carrying Work No. 1, then southwards, then eastwards over the West Croydon Railway, then northwards and terminating at a point 20 metres north of that junction;
Work No. 1D A new street (89 metres in length) forming a diversion of part of the carriageway of Waddon New Road and Cairo New Road, commencing at a point 30 metres north-east of the junction of Waddon New Road with Lower Church Street, passing eastwards beneath the existing bridge carrying Roman Way then southwards and terminating at a point 110 metres north-west of the junction of Cairo New Road with Reeves Corner.
In the London borough of Sutton—
Work No. 2 A railway (545 metres in length) commencing by a junction with Work No. 1 at a point 535 metres north-west of the footbridge carrying Therapia Lane over the Wimbledon Railway, passing eastwards and south-eastwards and terminating by a junction with Work No. 1 at a point 2 metres east of that footbridge forming, with sidings, a depot for Tramlink;
Work No. 2A A railway (497 metres in length) commencing by a junction with Work No. 1 at a point 535 metres north-west of the footbridge carrying Therapia Lane over the Wimbledon Railway, passing south-eastwards and terminating by a junction with Work No. 1 at a point 40 metres west of that footbridge forming, with sidings, a depot for Tramlink with access provided by means of a new service road from Endeavour Way.
In the London borough of Croydon—
Work No. 3 A railway (1,941 metres in length) commencing by a junction with Work No. 1 at its termination, forming double lines of tramway (92 metres in length) passing southwards along Cairo New Road, a single line of tramway (720 metres in length) passing south-eastwards along that road, south-eastwards along Reeves Corner, south-eastwards and eastwards along Church Street, eastwards along Crown Hill, and eastwards along George Street and passing over the Croydon Underpass by means of the existing bridge, double lines of tramway (188 metres in length) passing eastwards along George Street, triple lines of tramway (92 metres in length) passing eastwards along that street and passing over the Brighton Railway by means of the existing bridge, a single line of tramway (165 metres in length) passing eastwards along Addiscombe Road, double lines of tramway (684 metres in length) passing eastwards along that road and terminating at a point 60 metres east of the junction of that road with Chepstow Road;
Work No. 3A A railway (216 metres in length) commencing by a junction with Work No. 3 at the junction of George Street with Addiscombe Road, forming a single line of tramway, passing south-eastwards, eastwards, northwards and eastwards along Addiscombe Road and terminating by a junction with Work No. 3 at the junction of that road with Colson Road;
Work No. 3B A railway (39 metres in length) commencing by a junction with Work No. 3 at a point 15 metres east of the junction of Cherry Orchard Road with Addiscombe Road, forming a single line of tramway, passing south-eastwards and southwards along that road and terminating by a junction with Work No. 3A at a point 40 metres south-west of the junction of that road with Colson Road;
Work No. 3C A widening of Addiscombe Road on its southern side between its junction with Leyburn Gardens and a point 75 metres east of that junction;
Work No. 4 A railway (1,465 metres in length) commencing by a junction with Work No. 3 at a point 35 metres west of the junction of Tamworth Road with Reeves Corner, forming a single line of tramway, passing eastwards along Cairo New Road, north-eastwards along Tamworth Road and Station Road, southwards along Wellesley Road and eastwards along George Street and terminating by a junction with Work No. 3 at a point 45 metres east of the junction of Wellesley Road with George Street;
Work No. 4A A widening of Tamworth Road on its north-western side between a point 85 metres south of its junction with Drayton Road and that junction;
Work No. 4B A widening of Station Road on its north-western side between a point 90 metres south-west of its junction with Wellesley Road and that junction;
Work No. 4C A subway (23 metres in length) commencing at a point 5 metres north of the junction of Lansdowne Road with Wellesley Road and passing north-east and north-west and terminating at a point 25 metres north of that junction;
Work No. 5 A railway (47 metres in length) commencing by a junction with Work No. 3 at a point 20 metres south-east of the junction of Tamworth Road with Reeves Corner, forming a single line of tramway, passing northwards along Reeves Corner and Tamworth Road and terminating by a junction with Work No. 4 at a point 3.30 metres north-east of the junction of Tamworth Road with Reeves Corner;
Work No. 6 A railway (46 metres in length) commencing by a junction with Work No. 3 at a point 15 metres west of the junction of Wellesley Road with George Street, forming a single line of tramway, passing eastwards along George Street and passing over the Croydon Underpass by means of the existing bridge, passing northwards along Wellesley Road and terminating by a junction with Work No. 3 at a point 30 metres north of the junction of Wellesley Road with George Street.
In the London boroughs of Croydon and Bromley—
Work No. 7 A railway (6,970 metres in length) commencing by a junction with Work No. 3 at its termination, passing eastwards on the southern side of Addiscombe Road, northwards along the course of the former Selsdon Railway, north-eastwards along the course of the Addiscombe Railway, north-westwards and north-eastwards through South Norwood Country Park, north-westwards on the south-western side of Beckenham Crematorium, north-eastwards and eastwards along the course of the Norwood Spur passing over the Mid Kent Railway by means of the existing bridge and terminating at a point 90 metres north-west of the junction of Southend Road with Rectory Road.
In the London borough of Croydon—
Work No. 7A A new street (62 metres in length) forming a diversion of part of the carriageway of Woodbury Close, crossing Work No. 7 on the level, commencing at a point 10 metres west of the junction of Woodbury Close with Addiscombe Road, passing southwards on the western side of Woodbury Close and terminating at a point 65 metres south of that junction.
In the London boroughs of Croydon and Bromley—
Work No. 8 A railway (896 metres in length) commencing by a junction with Work No. 7 at a point 260 metres north-east of the junction of Albert Road with Estcourt Road, passing north-eastwards along the course of the Addiscombe Railway, and terminating at a point 110 metres west of the junction of Station Estate with Elmers End Road.
In the London borough of Croydon—
Work No. 9 A railway (2,300 metres in length) commencing by a junction with Work No. 7 at a point 85 metres south-west of the junction of Sandilands with Addiscombe Road passing southwards along the course of the former Selsdon Railway, partly in existing tunnels (Radcliffe Tunnel, Park Hill Tunnel and Coombe Road Tunnel) and passing over the Fairfield Path (FP 595) including a new bridge over that footpath then eastwards along the north side of Coombe Road and terminating at a point 35 metres north-east of the junction of Oaks Road with Coombe Road;
Work No. 10 A railway (1,552 metres in length) commencing by a junction with Work No. 9 at its termination, passing eastwards, south-eastwards and eastwards on the northern side of Coombe Lane and Sunken Road, then south-eastwards, partly in tunnel, passing beneath the junction of Coombe Lane with Gravel Hill and Shirley Hills Road, south-eastwards on the southern side of Gravel Hill and terminating at a point 120 metres west of the junction of Abbots Green with Gravel Hill;
Work No. 11 A railway (2,100 metres in length) commencing by a junction with Work No. 10 at its termination, passing eastwards on the southern side then the northern side of Gravel Hill, north-eastwards on the western side then the central reserve of Kent Gate Way, south-eastwards on the south-western side of Lodge Lane and terminating at a point 20 metres west of the junction of Field Way with Lodge Lane including the provision of a bus interchange;
Work No. 12 A railway (1,553 metres in length) commencing by a junction with Work No. 11 at its termination, passing south-eastwards on the south-western side of Lodge Lane, along the central reserve of Parkway and on the south-western side of Central Parade and terminating at a point 240 metres south-east of the junction of Parkway with Central Parade.