xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
Modifications etc. (not altering text)
C1Pt. 1 applied (with modifications) by Forestry Act 1967 (c. 10), ss. 39, 40, Sch. 4 para. 1, Sch. 5 Pt. III para. 11(1); Agriculture Act 1967 (c. 22), s. 49(7)(i); Greater London Council (General Powers) Act 1967 (c. xx), s. 15; and Post Office Act 1969 (c. 48), s. 60(1)
C2Pt. 1 (ss. 1–32) extended by Telecommunications Act 1984 (c. 12, SIF 96), Sch. 2 para. 16(1)
C3Pt. 1 (ss. 1–32) applied (with modifications): by Local Government Act 1972 (c. 70, SIF 81:1), ss. 120(3), 124(2), 273(1); by S.I. 1978/829, art. 4; by S.I. 1978/1125, art. 3; and by New Towns Act 1981 (c. 64, SIF 123:3), Sch. 6 Pt. 1
C4Pt. 1 (ss. 1–32) applied (except ss. 4-8, 27, 31) by Airports Act 1986 (c. 31, SIF 9), s. 59(2)(a)
C5Pt. 1 (ss. 1–32) applied (with modifications) by Channel Tunnel Act 1987 (c. 53, SIF 102), ss. 6, 37(4)(5), 38, Sch. 2 paras. 2(2), 15(9), Sch. 5 para. 3(1), 5(1), 8
C6Pt. 1 (ss. 1–32) applied (with modifications) by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2(2), Sch. 2 Pt. 1I para. 1, Sch. 3 para. 1(8)
C7Pt. 1 (ss. 1–32) applied (with modifications) by Planning (Listed Buildings and Conservation Areas) Act 1990 (c. 9, SIF 123:1), s. 52(2)
C8Pt. 1 (ss. 1–32) applied by Town and Country Planning Act 1990 (c. 8, SIF 123:1), s. 227(2)
C9Pt. 1 (ss. 1-32) applied (with modifications) (26.7.1991) by S.I. 1991/1760, art. 3(1)(2)
C10Pt. 1 (ss. 1-32) applied in part (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss. 3(1)(2), 13, Sch. (with s. 14(3)(e))
C11Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by British Railways Act 1992 (c. i), ss.14(1)(2), 17(6), 20(3)(4), Sch. 2 (with ss. 27, 34)
C12Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by Severn Bridges Act 1992 (c. 3), ss.2(2)(3)(4)(6), Sch. 2 para. 7(7)
C13Pt. 1 (ss. 1-32) applied in part (with modifications) (16.7.1992) by River Humber (Upper Pyewipe Outfall) Act 1992 (c. xv), ss.3(1)(2), 17(3)(4), Sch. (with ss. 21, 24, 25).
C14Pt. 1 (ss. 1-32) applied in part (with modifications) (12.11.1992) by Greater Manchester (Light Rapid Transit System) Act 1992 (c. xviii), s. 3(1)(2).
C15Pt. 1 (ss. 1-32) incorporated in part (with modifications) (18.6.1992) by British Railways (No. 2) Act 1992 (c. xi), ss. 4(1)(2), 27(3)(4), Sch. 3 (with ss. 34, 45)
C16Pt. 1 (ss. 1-32) applied in part (29.3.1993) by 1993 c. iv, ss. 4(1)(2), 29(2)(3), Sch. 4 (with ss. 36, 41(5), 44(1))
Pt. 1 (ss. 1-32) applied in part (10.11.1993) by Leasehold Reform, Housing and Urban Development Act 1993 (c. 28), s. 162(6); S.I. 1993/2762, art.3
Pt. 1 (ss. 1-32) applied in part (with modifications) (27.7.1993) by 1993 c. xv, ss. 5(1)(2), 27(4), Sch. 4 (with s. 44)
Pt. 1 (ss. 1-32) applied in part (with modifications) (5.11.1993) by Cardiff Bay Barrage Act 1993 (c. 42), ss. 4(2)-(4), 6, Sch. 5 para. 6(2) (with ss. 2, 30(1), Sch. 2 para. 9)
Pt. 1 (ss. 1-32) applied in part (with modifications) (26.5.1994) by 1994 c. vi, s. 3(1)(2)
Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Croydon Tramlink Act 1994 (c. xi), ss. 5(1)(2), 30(3)(4)(a), 31(1), 56(2)(3), Sch. 4
Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Greater Nottingham Light Rapid Transit Act 1994 (c. xv), ss. 5(1)(2), 22(f), 28(3)(4), 44(8), Sch. 5
Pt. 1 (ss. 1-32) applied (1.1.1996) by Merchant Shipping Act 1995 (c. 21), ss. 197(6)(a), 316(2) (with s. 312(1))
Pt. 1 (ss. 1-32) applied in part (with modifications) (28.7.1998) by Tamar Bridge Act 1998 (c. iv), ss. 4(2)-(4), 5(2)-(4), 6(1), 13, Sch.
Pt. 1 (ss. 1-32) applied (with modifications) (13.1.1999) by Tyne and Wear Passenger Transport (Sunderland) Order 1998 (S.I. 1998/3269), arts. 23(1)(2), 24, Sch. 7
C17Pt. 1 (ss. 1-32) applied (with modifications) (19.2.1999) by S.I. 1999/537, arts. 6(1)(2), 7(2), 11, Sch. 2 paras. 1-8
C18Pt. 1 (ss. 1-32) applied (with modifications) (21.7.1999) by S.I. 1999/2129, art. 15(3), Sch. 5 paras. 3(2), 4-9
C19Pt. 1 (ss. 1-32) applied (with modifications) (22.3.2001) by Channel Tunnel Rail Link (Stratford Station and Subsidiary Works) Order 2001 (S.I. 2001/1451), arts. 9(1)(2), 10(2), 13(a), Sch. 2
Pt. 1 (ss. 1-32) applied (with modifications) (12.8.2002) by Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002 (S.I. 2002/1943), art. 4(1)(2)
C20Pt. 1 applied in part (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 4 para. 9(1) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Schs. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)
C21Pt. 1 applied (with modifications) (22.7.2005) by Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), arts. 1, 26, 34 (with art. 47)
C22Pt. 1 applied (with modifications) (12.1.2007) by Network Rail (West Coast Main Line) (Stowe Hill) Order 2006 (S.I. 2006/3471), arts. 1, 4
C23Pt. 1 applied (with modifications) (16.5.2008) by London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 1, 29, 33 (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))
C24Pt. 1 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), ss. 6, 7(5)(7), Sch. 6 paras. 2, 3, 6, 7, 14
C25Pt. 1 applied in part (with modifications) (29.12.2008) by Network Rail (Thameslink) (Land Acquisition) Order 2008 (S.I. 2008/3163), arts. 1, 4, 11 (with art. 13)
C26Pt. 1 applied (with modifications) (1.3.2010) by Planning Act 2008 (c. 29), ss. 125, 241(8) (with s. 226); S.I. 2010/101, art. 3(f) (with art. 6)
C27Pt. 1 applied (with modifications) (1.7.2011) by The Saundersfoot Harbour Empowerment Order 2011 (S.I. 2011/1565), arts. 1(2), 17
C28Pt. 1 applied in part (15.1.2012) by Localism Act 2011 (c. 20), ss. 207(9), 240(1)(l)
C29Pt. 1 applied in part by Greater London Authority Act 1999 (c. 29), s. 333ZA(8) (as inserted (15.1.2012 for specified purposes, 1.4.2012 in so far as not already in force) by Localism Act 2011 (c. 20), ss. 187(3), 240(2); S.I. 2012/57, art. 4(1)(w) (with arts. 6, 7, 9-11); S.I. 2012/628, art. 6(e) (with arts. 9, 11, 14, 15, 17))
C30Pt. 1 applied (with modifications) (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 6, 11, 13
C31Pt. 1 applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 1, Sch. 11 paras. 3(2), 4-9
C32Pt. 1 excluded (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 27(1)(a) (with arts. 51, 53)
C33Pt. 1 excluded (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 31(1)(a) (with art. 44)
C34Pt. 1 applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 1, Sch. 5 para. 3(2)-9 (with arts. 20(6), 30)
C35Pt. 1 applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), art. 1, Sch. 7 para. 3(2)-9
C36Pt. 1 excluded (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 19(1)(a) (with art. 30)
C37Pt. 1 excluded (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 20(1)(a)
C38Pt. 1 applied (with modifications) (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), art. 1, Sch. 1 paras. 3(2), 4-9
C39Pt. 1 excluded (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 12(1)(a)
C40Pt. 1 applied (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 4
C41Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 14 (with art. 24(1)(a))
C42Pt. 1 applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 21, Sch. 6 paras. 3(2), 4-9
C43Pt. 1 applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 37)
C44Pt. 1 applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 39)
C45Pt. 1 excluded (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 22(1)(a) (with arts. 4, 5(3))
C46Pt. 1 applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), art. 1, Sch. 6 para. 3(2)-9 (with arts. 4, 5(3))
C47Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 21, 28, 30 (with art. 39)
C48Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), art. 1, Sch. 2 paras. 3(2), 4-9 (with art. 39)
C49Pt. 1 applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 8, 18(3), Sch. 3 paras. 4-9
C50Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), art. 1, Sch. 5 para. 3(2)-9 (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C51Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 28 (with arts. 39, 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C52Pt. 1 applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 1, Sch. 3 para. 3(2)-9 (with arts. 35, 36)
C53Pt. 1 applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 1, Sch. 7 para. 3(2)-9 (with art. 35)
C54Pt. 1 applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 37, 38)
C55Pt. 1 applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), art. 1, Sch. 11 para. 3(2)-8 (with art. 43)
C56Pt. 1 applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 1, Sch. 6 para. 3(2)-9
C57Pt. 1 applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 39, 40, Sch. 8 para. 19)
C58Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), art. 1, Sch. 5 paras. 3(2), 4-9 (with arts. 43, 44)
C59Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 28 (with arts. 37, 43, 44)
C60Pt. 1 applied (with modifications) (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 4(3), 70(1), Sch. 6 para. 2, Sch. 9 paras. 1, 2 (as amended (24.2.2017) by 2017 c. 7, s. 70(2), Sch. 14 paras. 5, 8; S.I. 2017/209, reg. 2)
C61Pt. 1 applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), art. 1, Sch. 11 paras. 3(2), 4, 5
C62Pt. 1 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(2)(3)
C63Pt. 1 applied (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), art. 1, Sch. 10 paras. 3(2), 4-9 (with art. 22)
C64Pt. 1 applied (with modifications) (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), art. 1, Sch. 6 para. 3(2)-9 (with arts. 36, 37, Sch. 8 para. 34)
C65Pt. 1 applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 22 (with Sch. 8 para. 20)
C66Pt. 1 applied (with modifications) (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), art. 1, Sch. 1 paras. 2, 3
C67Pt. 1 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 8(2)
C68Pt. 1 applied (with modifications) (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 19, Sch. 7 paras. 4, 5 (with arts. 28(1)(a), 32(2))
C69Pt. 1 modified (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 27 (with arts. 4, 23, 37)
C70Pt. 1 applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 37)
C71Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 32 (with arts. 43(1), 55-57, Sch. 8 para. 13)
C72Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 3 paras. 1, 4-10 (with arts. 55-57, Sch. 8 para. 13)
C73Pt. 1 applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 27 (with arts. 58, 59)
C74Pt. 1 applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), art. 1, Sch. 4 paras. 4, 5 (with arts. 58, 59)
C75Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), art. 1, Sch. 6 paras. 4, 5 (with arts. 24(8), 33(2))
C76Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 18, 29 (with arts. 24(8), 33(2))
C77Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 25, Sch. 5 paras. 4, 5
C78Pt. 1 applied (with modifications) (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 6, 14, Sch. 2 paras. 4, 5
C79Pt. 1 applied (with modifications) (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), arts. 1, 8, 13, 15, Sch. 6 paras. 4, 5
C80Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 19, 28(1)(a) (with art. 31(2))
C81Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), art. 1, Sch. 9 paras. 4, 5 (with art. 31(2))
C82Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 11, 18(1)(a)
C83Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), art. 1, Sch. 8 paras. 4, 5
C84Pt. 1 modified (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 25 (with arts. 3(3), 5, 22)
C85Pt. 1 applied (with modifications) (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), art. 1, Sch. 6 paras. 4, 5 (with arts. 3(3), 5)
C86Pt. 1 applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 24 (with arts. 6, 19(1), 42)
C87Pt. 1 applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), art. 1, Sch. 9 para. 4(2)-10 (with arts. 6, 42)
C88Pt. 1 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), art. 1, Sch. 5 paras. 4, 5 (with arts. 55, 56)
C89Pt. 1 modified (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 30 (with arts. 55, 56)
C90Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 25
C91Pt. 1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 20(1)(a)
C92Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), art. 1, Sch. 8 paras. 4, 5
C93Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 5 (with arts. 12(1), 18)
C94Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 7, Sch. 2 paras. 4, 5 (with arts. 12, 18)
C95Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), art. 1, Sch. 8 paras. 4-10
C96Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 26
C97Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 26
C98Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), art. 1, Sch. 9 paras. 4, 5
C99Pt. 1 applied (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 30 (with Sch. 13 Pt. 1 para. 19)
C100Pt. 1 modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 paras. 4, 5 (with Sch. 13 Pt. 1 para. 19)
C101Pt. 1 applied (with modifications) (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), art. 1, Sch. 13 paras. 4, 5 (with art. 37(2))
C102Pt. 1 applied (with modifications) (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 23 (with art. 37(2))
C103Pt. 1 applied (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), art. 1, Sch. 6 paras. 4, 5 (with art. 3(1))
C104Pt. 1 modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 29 (with art. 3(1))
C105Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 29 (with arts. 47, 48, Sch. 10 para. 19)
C106Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), art. 1, Sch. 5 paras. 4, 5 (with arts. 47, 48, Sch. 10 para. 19)
C107Pt. 1 applied (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 1, Sch. 4 paras. 4, 5 (with art. 7)
C108Pt. 1 modified (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 24 (with art. 7)
C109Pt. 1 excluded (15.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 2, 20(1)(a) (with arts. 7, 20(2))
C110Pt. 1 applied (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C111Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 29 (with art. 7)
C112Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 paras. 4, 5 (with art. 7)
C113Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), art. 1, Sch. 7 paras. 4, 5 (with arts. 51, 57)
C114Pt. 1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 25(1)(a) (with arts. 51, 57)
C115Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 32 (with arts. 51, 57)
C116Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), art. 1, Sch. 12 paras. 4, 5
C117Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 30
C118Pt. 1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 26(a) (with art. 37)
C119Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), art. 1, Sch. 9 paras. 4, 5 (with art. 37)
C120Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 29 (with art. 37)
C121Pt. 1 modified (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 25 (with arts. 5, 44)
C122Pt. 1 applied (with modifications) (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C123Pt. 1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 22(1)(a) (with arts. 5, 44)
C124Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), art. 1, Sch. 6 para. 4 (with art. 37)
C125Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 22 (with art. 37)
C126Pt. 1 modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 23 (with arts. 41, 42, Sch. 16 para. 66)
C127Pt. 1 applied (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), art. 1, Sch. 5 paras. 4, 5 (with art. 5)
C128Pt. 1 modified (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 25 (with art. 5)
C129Pt. 1 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), art. 1, Sch. 7 paras. 4, 5 (with Sch. 9 para. 144)
C130Pt. 1 applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 25 (with Sch. 9 para. 144)
C131Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), Sch. 2 paras. 4, 5
C132Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 4 (with art. 11(1)(a))
C133Pt. 1 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), art. 1, Sch. 7 paras. 4, 5
C134Pt. 1 modified (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 31
C135Pt. 1 modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 26 (with art. 32, Sch. 9 para. 36)
C136Pt. 1 applied (with modifications) (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), art. 1, Sch. 6 paras. 4, 5 (with art. 32, Sch. 9 para. 36)
C137Pt. 1 applied (with modifications) (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 5 (with art. 16(1))
C138Pt. 1 applied (with modifications) (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 20, 29, Sch. 14 paras. 4, 5
C139Pt. 1 applied (with modifications) (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), art. 1, Sch. 8 paras. 4, 5
C140Pt. 1 applied (with modifications) (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), art. 1, Sch. 7 para. 4(2)-10 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
C141Pt. 1 applied (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 7 paras. 4, 5 (with art. 5, Sch. 27 para. 36)
C142Pt. 1 modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 28 (with art. 5, Sch. 27 para. 36)
C143Pt. 1 applied (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 4(3), 64(1) (with s. 9(1)(a))
C144Pt. 1 applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 9 paras. 1, 2(1)-(8), Sch. 10 (with s. 9(1)(a))
C145Pt. 1 modified (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 29 (with arts. 4, 47)
C146Pt. 1 applied (with modifications) (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 47)
C147Pt. 1 applied (with modifications) (1.4.2021) by The Network Rail (Ferryboat Lane Footbridge Reconstruction) (Land Acquisition) Order 2021 (S.I. 2021/299), arts. 1, 4 (with art. 11)
C148Pt. 1 applied (with modifications) (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), arts. 1, 4, Sch. 1 paras. 4, 5 (with art. 12(1)(a))
C149Pt. 1 applied (with modifications) (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 6, Sch. 5 paras. 4, 5
C150Pt. 1 applied (with modifications) (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 24, Sch. 7 paras. 4(2), 5 (with arts. 15, 50, Sch. 11 para. 29)
C151Pt. 1 applied (with modifications) (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 23, Sch. 7 paras. 4(2), 5-10 (with arts. 41, 42, Sch. 17 para. 66)
C152Pt. 1 applied (with modifications) (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 23, Sch. 7 paras. 4(2), 5-10 (with arts. 41, 42, Sch. 16)
C153Pt. 1 applied (with modifications) (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), art. 1, Sch. 7 para. 4 (with Sch. 8 Pt. 6 para. 19)
C154Pt. 1 applied (with modifications) (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 33, Sch. 4 paras. 4(2), 5-10 (with art. 55)
C155Pt. 1 applied (with modifications) (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), art. 1(2), Sch. 8 paras. 4(2), 5-10 (with arts. 40, 41)
C156Pt. 1 modified (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 23 (with arts. 40, 41)
C157Pt. 1 modified (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 23 (with arts. 40, 41)
C158Pt. 1 applied (with modifications) (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), art. 1(2), Sch. 8 paras. 4(2), 5-10 (with arts. 40, 41)
C159Pt. 1 applied (with modifications) (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 25, Sch. 6 paras. 4, 5
C160Pt. 1 modified (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 28 (with arts. 6, 34)
C161Pt. 1 applied (with modifications) (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), art. 1, Sch. 6 paras. 4, 5 (with arts. 6, 34)
C162Pt. 1 modified (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 30 (with arts. 5, 27, 36)
C163Pt. 1 applied (with modifications) (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), art. 1, Sch. 7 paras. 4, 5 (with arts. 5, 36)
C164Pt. 1 restricted (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 27(1)(a) (with art. 27(2))
C165Pt. 1 applied (with modifications) (30.6.2022) by The Network Rail (Essex and Others Level Crossing Reduction) Order 2022 (S.I. 2022/651), arts. 1, 18, Sch. 12 paras. 1, 4, 5
C166Pt. 1 applied (with modifications) (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 50)
C167Pt. 1 modified (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 30 (with arts. 4, 50)
C168Pt. 1 excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 26(1)(a) (with arts. 4, 50)
C169Pt. 1 applied (with modifications) (1.8.2022) by The Northumberland Line Order 2022 (S.I. 2022/820), arts. 1, 15, Sch. 6 paras. 4, 5 (with Sch. 10 paras. 21, 43)
C170Pt. 1 restricted (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1(1), 13(1)(a)
C171Pt. 1 restricted (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 13(1)(a)
C172Pt. 1 applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) (No. 2) Order 2022 (S.I. 2022/872), arts. 1(1), 4, Sch. 1 paras. 4, 5
C173Pt. 1 applied (with modifications) (2.8.2022) by The Network Rail (Oxford Station Phase 2 Improvements (Land Only)) Order 2022 (S.I. 2022/871), arts. 1, 4, Sch. 1 paras. 4, 5
C174Pt. 1 modified (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 37 (with arts. 62, 76, 87, Sch. 19 paras. 4, 78)
C175Pt. 1 modified (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 29 (with arts. 4, 53)
C176Pt. 1 applied (with modifications) (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 53)
C177Pt. 1 applied (with modifications) (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 40)
C178Pt. 1 applied (with modifications) (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 33, Sch. 6 paras. 4, 5 (with arts. 23, 53, Sch. 9 para. 65)
C179Pt. 1 modified (8.9.2022) by The Manston Airport Development Consent Order 2022 (S.I. 2022/922), arts. 1, 25 (with arts. 5, 40)
C180Pt. 1 applied (with modifications) (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 27, Sch. 12 paras. 4, 5 (with arts. 40, 46(2), Sch. 19 para. 61)
C181Pt. 1 applied (with modifications) (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 30 (with arts. 4, 26, 52, Sch. 9 para. 82)
C182Pt. 1 applied (with modifications) (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), art. 1, Sch. 11 paras. 4, 5 (with art. 51)
C183Pt. 1 modified (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 25 (with art. 51)
C184Pt. 1 applied (with modifications) (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 30, Sch. 6 paras. 4, 5 (with arts. 4, 26)
C185Pt. 1 modified (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 27 (with arts. 5, 24(1)(a))
C186Pt. 1 applied (with modifications) (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), art. 1, Sch. 6 paras. 4, 5 (with art. 5)
C187Pt. 1 applied (with modifications) (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 25(1), Sch. 7 paras. 4, 5 (with art. 32, Sch. 10 paras. 26(2), 68)
C188Pt. 1 applied (with modifications) (11.1.2023) by The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (S.I. 2022/1406), arts. 1, 20, Sch. 10 paras. 4, 5 (with arts. 23, 30, 34(2), Sch. 12 paras. 5, 47, 79)
C189Pt. 1 applied (with modifications) (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 30, Sch. 6 paras. 4, 5 (with arts. 4, 50)
C190Pt. 1 applied (with modifications) (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 25, Sch. 10 paras. 4, 5 (with art. 19) (as amended (21.11.23) by The Longfield Solar Farm (Correction) Order 2023 (S.I. 2023/1241), art. 1(2), Sch.)
C191Pt. 1 applied (with modifications) (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 31 (with arts. 5, 27, 53, Sch. 8 paras. 6, 64)
C192Pt. 1 applied (with modifications) (2.8.2023) by The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023 (S.I. 2023/815), arts. 1, 19 (with art. 42)
C193Pt. 1 applied (with modifications) (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 26, Sch. 7 para. 4(2)-5 (with arts. 20, 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4) (as amended (31.1.2024) by The Hornsea Four Offshore Wind Farm (Correction) Order 2024 (S.I. 2024/117), art. 1(2), Sch.)
C194Pt. 1 applied (with modifications) (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 25, Sch. 5 paras. 4, 5 (with arts. 6(2), 18, 21, Sch. 11 paras. 5, 30)
C195Pt. 1 applied (with modifications) (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 29, Sch. 6 paras. 4, 5 (with arts. 4, 25(1)(a), 45, Sch. 9 paras. 6, 46, 54(1))
C196Pt. 1 applied (with modifications) (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 25, Sch. 8 paras. 4-11 (with arts. 36, 37, Sch. 9)
C197Pt. 1 applied (with modifications) (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 23, Sch. 9 paras. 4, 5 (with arts. 18(1)(a), 43, Sch. 12)
C198Pt. 1 applied (with modifications) (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 36, Sch. 6 paras. 4, 5 (with arts. 4, 29, 52, Sch. 11)
C199Pt. 1 applied (with modifications) (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 29, Sch. 8 paras. 4, 5 (with arts. 24(1)(a), 42, 43, Sch. 12)
C200Pt. 1 applied (with modifications) (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 30, Sch. 9 paras. 4, 5 (with art. 24, Sch. 11)
C201Pt. 1 applied (with modifications) (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 25, Sch. 5 paras. 4, 5 (with arts. 18, 21, 35, Sch. 9)
C202Pt. 1 applied (with modifications) (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 32 (with arts. 24, 44, Sch. 15)
C203Pt. 1 applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 32, Sch. 9 paras. 4, 5 (with arts. 21, 25, 41, Sch. 10)
C204Pt. 1 applied (with modifications) (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), art. 1(2), Sch. 9 paras. 4, 5 (with arts. 21, 41, Sch. 10)
C205Pt. 1 applied (with modifications) (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), art. 1, Sch. 10 paras. 4, 5
C206Pt. 1 applied (with modifications) (25.4.2024) by The Network Rail (Church Fenton Level Crossing Reduction) Order 2024 (S.I. 2024/526), arts. 1, 19, Sch. 10 paras. 4, 5 (with art. 27(1))
C207Pt. 1 applied (with modifications) (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 23, Sch. 8 paras. 4, 5 (with arts. 18(1), 35, 36, Sch. 14)
C208Pt. 1 applied (with modifications) (13.6.2024) by The Network Rail (Cambridge Re-Signalling) Order 2024 (S.I. 2024/724), arts. 1, 5, Sch. 5 paras. 4, 5 (with arts. 12(1)(a), 13)
C209Pt. 1 applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 32 (with arts. 6, 29(1)(a), Sch. 10)
C210Pt. 1 applied (with modifications) (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), art. 1, Sch. 7 paras. 4, 5 (with art. 6, Sch. 10)
C211Pt. 1 applied (with modifications) (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 27, Sch. 10 paras. 4, 5 (with art. 20(1), Sch. 15)
C212Pt. 1 applied (with modifications) (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 25, Sch. 10 paras. 4, 5 (with arts. 19(1)(a), 45, Sch. 14)
C213Pt. 1 applied (with modifications) (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 24, Sch. 9 paras. 4, 5 (with arts. 18, 44, Sch. 12)
C214Pt. 1 applied (with modifications) (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 27, Sch. 10 paras. 4, 5 (with arts. 21(1)(a), 48, Sch. 15)
C215Pt. 1 applied (with modifications) (4.10.2024) by The National Grid (Bramford to Twinstead Reinforcement) Order 2024 (S.I. 2024/958), arts. 1, 35, Sch. 9 para. 4 (with arts. 32(1)(a), 40, Sch. 14)
(1)If the owner of any of the land purchased by the acquiring authority, or of any interest in the land so purchased, on tender of the compensation agreed or awarded to be paid in respect of the land or interest refuses to accept it, or neglects or fails to make out a title to the land or interest to the satisfaction of the acquiring authority, or refuses to convey or release the land as directed by the acquiring authority, it shall be lawful for the acquiring authority to pay into court the compensation payable in respect of the land or interest.
(2)The compensation so paid into court shall, subject to the provisions of this Act, be placed to the credit of the parties interested in the land and the acquiring authority shall, so far as they can, give their descriptions.
(3)When the acquiring authority have paid into court the compensation, it shall be lawful for them to execute a deed poll containing a description of the land in respect of which the payment into court was made, and declaring the circumstances under which, and the names of the parties to whose credit, the payment into court was made.
(4)On execution of the deed poll all the estate and interest in the land of the parties for whose use and in respect whereof the compensation was paid into court shall vest absolutely in the acquiring authority and as against those persons the acquiring authority shall be entitled to immediate possession of the land.
(5)On the application of any person claiming all or any part of the money paid into court, or claiming all or any part of the land in respect of which it was paid into court, or any interest in it, the High Court may order its distribution according to the respective estates, titles or interests of the claimants, and if, before the money is distributed, it is dealt with under section 6 of the M1Administration of Justice Act 1965 payment likewise of the dividends thereof, and may make such other order as the Court thinks fit.
F1(6). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Textual Amendments
F1S. 9 (6) repealed by Statute Law (Repeals) Act 1973 (c. 39), s. 1(1), Sch. 1 Pt. 1X
Modifications etc. (not altering text)
C216S. 9 modified by Land Compensation Act 1973 (c. 26, SIF 28:1), s. 52(10)(a)
C217S. 9 modified by Agriculture (Miscellaneous Provisions) Act 1968 (c. 34), s. 13(3), Sch. 3 paras. 4, 5
C218S. 9(2)(5) applied with modifications by Land Compensation Act 1973 (c. 26, SIF 28:1), s. 54(7)
C219S. 9(2)(5) applied with modifications by Town and Country Planning Act 1990 (c. 8, SIF 123:1), s. 146(10)
C220S. 9(4) modified (31.3.1994) by 1994 c. iv, s. 17, Sch. 2 para. 3
C221S. 9(4) applied (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), s. 13(4), Sch. para.3.
S. 9(4) applied (with modification) (7.3.1995) by S.I. 1995/519, art. 23(3), Sch. 4 para. 6(a)
C222S. 9(4) modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 1, Sch. 7 para. 5(a)
C223S. 9(4) modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), art. 1, Sch. 7 para. 6(a) (with arts. 41, 42, Sch. 16 para. 66)
Marginal Citations