xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

Part IE+W Compulsory Purchase under Acquisition of Land Act of 1946

Modifications etc. (not altering text)

C4Pt. 1 (ss. 1–32) applied (except ss. 4-8, 27, 31) by Airports Act 1986 (c. 31, SIF 9), s. 59(2)(a)

C5Pt. 1 (ss. 1–32) applied (with modifications) by Channel Tunnel Act 1987 (c. 53, SIF 102), ss. 6, 37(4)(5), 38, Sch. 2 paras. 2(2), 15(9), Sch. 5 para. 3(1), 5(1), 8

C6Pt. 1 (ss. 1–32) applied (with modifications) by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2(2), Sch. 2 Pt. 1I para. 1, Sch. 3 para. 1(8)

C9Pt. 1 (ss. 1-32) applied (with modifications) (26.7.1991) by S.I. 1991/1760, art. 3(1)(2)

C10Pt. 1 (ss. 1-32) applied in part (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss. 3(1)(2), 13, Sch. (with s. 14(3)(e))

C11Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by British Railways Act 1992 (c. i), ss.14(1)(2), 17(6), 20(3)(4), Sch. 2 (with ss. 27, 34)

C12Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by Severn Bridges Act 1992 (c. 3), ss.2(2)(3)(4)(6), Sch. 2 para. 7(7)

C13Pt. 1 (ss. 1-32) applied in part (with modifications) (16.7.1992) by River Humber (Upper Pyewipe Outfall) Act 1992 (c. xv), ss.3(1)(2), 17(3)(4), Sch. (with ss. 21, 24, 25).

C14Pt. 1 (ss. 1-32) applied in part (with modifications) (12.11.1992) by Greater Manchester (Light Rapid Transit System) Act 1992 (c. xviii), s. 3(1)(2).

C15Pt. 1 (ss. 1-32) incorporated in part (with modifications) (18.6.1992) by British Railways (No. 2) Act 1992 (c. xi), ss. 4(1)(2), 27(3)(4), Sch. 3 (with ss. 34, 45)

C16Pt. 1 (ss. 1-32) applied in part (29.3.1993) by 1993 c. iv, ss. 4(1)(2), 29(2)(3), Sch. 4 (with ss. 36, 41(5), 44(1))

Pt. 1 (ss. 1-32) applied in part (10.11.1993) by Leasehold Reform, Housing and Urban Development Act 1993 (c. 28), s. 162(6); S.I. 1993/2762, art.3

Pt. 1 (ss. 1-32) applied in part (with modifications) (27.7.1993) by 1993 c. xv, ss. 5(1)(2), 27(4), Sch. 4 (with s. 44)

Pt. 1 (ss. 1-32) applied in part (with modifications) (5.11.1993) by Cardiff Bay Barrage Act 1993 (c. 42), ss. 4(2)-(4), 6, Sch. 5 para. 6(2) (with ss. 2, 30(1), Sch. 2 para. 9)

Pt. 1 (ss. 1-32) applied in part (with modifications) (26.5.1994) by 1994 c. vi, s. 3(1)(2)

Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Croydon Tramlink Act 1994 (c. xi), ss. 5(1)(2), 30(3)(4)(a), 31(1), 56(2)(3), Sch. 4

Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Greater Nottingham Light Rapid Transit Act 1994 (c. xv), ss. 5(1)(2), 22(f), 28(3)(4), 44(8), Sch. 5

Pt. 1 (ss. 1-32) applied (1.1.1996) by Merchant Shipping Act 1995 (c. 21), ss. 197(6)(a), 316(2) (with s. 312(1))

Pt. 1 (ss. 1-32) applied in part (with modifications) (28.7.1998) by Tamar Bridge Act 1998 (c. iv), ss. 4(2)-(4), 5(2)-(4), 6(1), 13, Sch.

Pt. 1 (ss. 1-32) applied (with modifications) (13.1.1999) by Tyne and Wear Passenger Transport (Sunderland) Order 1998 (S.I. 1998/3269), arts. 23(1)(2), 24, Sch. 7

C17Pt. 1 (ss. 1-32) applied (with modifications) (19.2.1999) by S.I. 1999/537, arts. 6(1)(2), 7(2), 11, Sch. 2 paras. 1-8

C18Pt. 1 (ss. 1-32) applied (with modifications) (21.7.1999) by S.I. 1999/2129, art. 15(3), Sch. 5 paras. 3(2), 4-9

C20Pt. 1 applied in part (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 4 para. 9(1) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Schs. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)

C21Pt. 1 applied (with modifications) (22.7.2005) by Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), arts. 1, 26, 34 (with art. 47)

C22Pt. 1 applied (with modifications) (12.1.2007) by Network Rail (West Coast Main Line) (Stowe Hill) Order 2006 (S.I. 2006/3471), arts. 1, 4

C23Pt. 1 applied (with modifications) (16.5.2008) by London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 1, 29, 33 (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))

C24Pt. 1 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), ss. 6, 7(5)(7), Sch. 6 paras. 2, 3, 6, 7, 14

C25Pt. 1 applied in part (with modifications) (29.12.2008) by Network Rail (Thameslink) (Land Acquisition) Order 2008 (S.I. 2008/3163), arts. 1, 4, 11 (with art. 13)

C26Pt. 1 applied (with modifications) (1.3.2010) by Planning Act 2008 (c. 29), ss. 125, 241(8) (with s. 226); S.I. 2010/101, art. 3(f) (with art. 6)

C27Pt. 1 applied (with modifications) (1.7.2011) by The Saundersfoot Harbour Empowerment Order 2011 (S.I. 2011/1565), arts. 1(2), 17

C28Pt. 1 applied in part (15.1.2012) by Localism Act 2011 (c. 20), ss. 207(9), 240(1)(l)

C29Pt. 1 applied in part by Greater London Authority Act 1999 (c. 29), s. 333ZA(8) (as inserted (15.1.2012 for specified purposes, 1.4.2012 in so far as not already in force) by Localism Act 2011 (c. 20), ss. 187(3), 240(2); S.I. 2012/57, art. 4(1)(w) (with arts. 6, 7, 9-11); S.I. 2012/628, art. 6(e) (with arts. 9, 11, 14, 15, 17))

C30Pt. 1 applied (with modifications) (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 6, 11, 13

C34Pt. 1 applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 1, Sch. 5 para. 3(2)-9 (with arts. 20(6), 30)

C41Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 14 (with art. 24(1)(a))

C42Pt. 1 applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 21, Sch. 6 paras. 3(2), 4-9

C44Pt. 1 applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 39)

C52Pt. 1 applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 1, Sch. 3 para. 3(2)-9 (with arts. 35, 36)

C53Pt. 1 applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 1, Sch. 7 para. 3(2)-9 (with art. 35)

C54Pt. 1 applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 37, 38)

C70Pt. 1 applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 37)

C71Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 32 (with arts. 43(1), 55-57, Sch. 8 para. 13)

C72Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 3 paras. 1, 4-10 (with arts. 55-57, Sch. 8 para. 13)

C73Pt. 1 applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 27 (with arts. 58, 59)

C76Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 18, 29 (with arts. 24(8), 33(2))

C77Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 25, Sch. 5 paras. 4, 5

C80Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 19, 28(1)(a) (with art. 31(2))

C86Pt. 1 applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 24 (with arts. 6, 19(1), 42)

C88Pt. 1 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), art. 1, Sch. 5 paras. 4, 5 (with arts. 55, 56)

C90Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 25

C96Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 26

C97Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 26

C98Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), art. 1, Sch. 9 paras. 4, 5

C111Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 29 (with art. 7)

C112Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 paras. 4, 5 (with art. 7)

C113Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), art. 1, Sch. 7 paras. 4, 5 (with arts. 51, 57)

C115Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 32 (with arts. 51, 57)

C117Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 30

C119Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), art. 1, Sch. 9 paras. 4, 5 (with art. 37)

C120Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 29 (with art. 37)

C124Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), art. 1, Sch. 6 para. 4 (with art. 37)

C125Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 22 (with art. 37)

C130Pt. 1 applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 25 (with Sch. 9 para. 144)

Entry on the landE+W

11 Powers of entry. E+W

(1)If the acquiring authority have served notice to treat in respect of any of the land and have served on the owner, lessee and occupier of that land [F1a notice of entry] , the acquiring authority may enter on and take possession of that land, or of such part of that land as is specified in the notice [F2, after the end of a period specified in the notice] ; and then any compensation agreed or awarded for the land of which possession is taken shall carry interest at the rate prescribed under section 32 of the M1Land Compensation Act 1961 from the time of entry until the compensation is paid or is paid into court in accordance with this Act.

Where under this subsection a notice is required to be served on an owner of land, and the land is ecclesiastical property as defined in [F3section 12(3) of the Acquisition of Land Act], a like notice shall be served on the [F4Diocesan Board of Finance for the diocese in which the land is situated].

In this subsection “owner” has the meaning given by [F5section 7(1) of the Acquisition of Land Act].

[F6(1A)A notice of entry under subsection (1) must specify the period after the end of which the acquiring authority may enter on and take possession of the land to which the notice relates.

(1B)The period specified in a notice of entry under subsection (1) must not end earlier than the end of the period of 3 months beginning with the day on which the notice is served unless it is a notice to which section 11A(4) or paragraph 13 of Schedule 2A applies.]

[F7(1C)A notice of entry under subsection (1) must explain the effect of section 11B (counter-notice requiring possession to be taken on specified date) and give an address at which the acquiring authority may be served with a counter-notice.]

[F8(1D)An acquiring authority may extend the period specified in a notice of entry under subsection (1) by agreement with each person on whom it was served.

(1E)A reference in this Act to the period specified in a notice of entry under subsection (1) is to the period as extended by any agreement under subsection (1D).]

(2)F9...

F10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(3)For the purpose of [F11surveying, valuing or taking levels] of any of the land subject to compulsory purchase, of probing or boring to ascertain the nature of the soil and of setting out the line of the works, the acquiring authority, after giving not less than three nor more than fourteen days’ notice to the owners or occupiers of that land, may enter on that land, but the acquiring authority shall make compensation for any damage thereby occasioned to the owners or occupiers of the land, and any question of disputed compensation under this subsection shall be referred to the [F12Upper Tribunal].

(4)Except as provided by the foregoing provisions of this section, the acquiring authority shall not, except with the consent of the owners and occupiers, enter on any of the land subject to compulsory purchase until the compensation payable for the respective interests in that land has been agreed or awarded, and has been paid to the persons having those interests or has been paid into court in accordance with this Act.

Textual Amendments

F1Words in s. 11(1) substituted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 186(2)(a)(i), 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)

F4Words in s. 11 substituted (1.10.2006) by Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), s. 16(2), Sch. 5 para. 12(1); S.I. 2006/2, Instrument made by Archbishops

F8S. 11(1D)(1E) inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), ss. 188, 216(3); S.I. 2017/75, reg. 3(e) (with reg. 5)

Modifications etc. (not altering text)

C138Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5

C141S. 11 modified (31.3.1994) by British Railways Act 1994 (c. iv), s. 17, Sch. 2 para. 4

C146S. 11(1) excluded by Agriculture Act 1967 (c. 22), s. 49(7) (ii)

C147S. 11(1) applied (with modifications) by Heathrow Express Railway Act 1991 (c. vii), s. 4(2)

C150S. 11(1) modified by 1961 c. 33, s. 5A(5)(6) (as inserted (31.10.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 103(2); S.I. 2004/2593, art. 2(a))

C151S. 11(3) modified (11.11.1996) by S.I. 1996/2714, art. 50(3)

C152S. 11(3) restricted (23.8.1999) by S.I. 1999/2981, art. 28(2), Sch. 10 Pt. 1 para. 2(7)

S. 11(3) restricted (24.12.1999) by S.I. 2000/428, art. 27, Sch. 5 para. 2(3)

S. 11(3) restricted (24.7.2001) by S.I. 2001/3627, art. 64, Sch. 12 para. 5(1) (with Sch. 12 para. 12)

s. 11(3) restricted (14.3.2002) by S.I. 2002/412, art. 36, Sch.6, Pt. 1I para. 2(2)

Marginal Citations

[F1311APowers of entry: further notices of entryE+W

(1)This section applies where—

(a)an acquiring authority have given a notice of entry under section 11(1) but have not yet entered on and taken possession of the land, and

(b)the authority become aware of an owner, lessee or occupier (“the newly identified person”) to whom they ought to have given a notice to treat under section 5(1) but have not.

(2)Any notice of entry already served under section 11(1) remains valid, but the authority may not enter on and take possession of the land unless they serve on the newly identified person—

(a)a notice to treat under section 5(1), and

(b)a notice of entry under section 11(1).

(3)Subsection (4) applies for the purpose of determining the period to be specified in the notice of entry under section 11(1) served on the newly identified person if—

(a)the person is an occupier of the land and the authority were not aware of the person because they were given misleading information when carrying out inquiries under section 5(1), or

(b)the person is not an occupier of the land.

(4)The period specified in the notice must be a period that ends—

(a)no earlier than the end of the period of 14 days beginning with the day on which the notice of entry is served, and

(b)no earlier than the end of the period specified in any previous notice of entry given by the acquiring authority in respect of the land.]

Textual Amendments

Modifications etc. (not altering text)

C138Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5

[F1411BCounter-notice requiring possession to be taken on specified dateE+W

(1)Where an acquiring authority serve a notice of entry under section 11(1) on an occupier with an interest in land, the occupier may serve a counter-notice requiring the acquiring authority to take possession of the land by no later than a date specified in the counter-notice.

(2)If the occupier gives up possession of the land on or before the specified date the acquiring authority are to be treated as having taken possession on that date (unless the acquiring authority has in fact taken possession before that date).

(3)The date specified in the counter-notice—

(a)must not be before the end of the period specified in the notice of entry under section 11(1), and

(b)must be at least 28 days after the day on which the counter-notice is served.

(4)A counter-notice under subsection (1) has no effect if the notice to treat relating to the land is withdrawn or ceases to have effect before the date specified in the counter-notice.

(5)A counter-notice under subsection (1) has no effect if it would require an acquiring authority to take possession of land at a time when section 11A or paragraph 6 of Schedule 2A prohibit the authority from entering on and taking possession of the land.

(6)If subsection (5) applies, the authority must notify the occupier who served the counter-notice—

(a)that the counter-notice has no effect, and

(b)if the authority serve a notice of entry as mentioned in section 11A(2)(b), of the date after which the authority could enter on and take possession of the land.

(7)If a counter-notice served under subsection (1) has no effect because of subsection (5), the occupier who served it may serve a further counter-notice.

(8)Where a notice of entry under section 11(1) is served on more than one occupier with the same interest in the land, a reference in this section to the occupier with an interest in land is to all of them acting together.]

Textual Amendments

Modifications etc. (not altering text)

C138Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5

12 Unauthorised entry. E+W

(1)If the acquiring authority, or any of their contractors, wilfully enter on and take possession of any of the land subject to compulsory purchase in contravention of subsection (4) of the last foregoing section, the acquiring authority shall forfeit to the person in possession of that land the sum of ten pounds in addition to the amount of any damage done to the land by entering and taking possession.

(2)The said sum of ten pounds, and the amount of any such damage, shall be recoverable summarily as a civil debt.

(3)An appeal shall lie to a court of quarter sessions against an order of a magistrates’ court adjudging a sum to be forfeited under the foregoing provisions of this section.

(4)If, after a sum has been adjudged to be forfeited under this section, the acquiring authority, or their contractors, remain in unlawful possession of any of the land the acquiring authority shall be liable to forfeit the sum of twenty-five pounds for every day on which they so remain in possession.

(5)A sum forfeited under the last foregoing subsection shall be recoverable by the person in possession of that land in the High Court, and in any such proceedings the decision of the magistrates’ court shall not be conclusive as to the acquiring authority’s right of entry.

(6)This section shall not subject the acquiring authority to the payment of a penalty if they have in good faith and without collusion paid the compensation agreed or awarded in respect of the land to a person whom they reasonably believed to be entitled to the compensation, or have paid it into court for the benefit of the person entitled to the land F15... although such person may not have been legally entitled thereto.

Textual Amendments

F15Words in s. 12(6) omitted (13.7.2016) by virtue of Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 16 para. 4; S.I. 2016/733, reg. 3(j)

Modifications etc. (not altering text)

C138Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5

C169S. 12 modified by Agriculture (Miscellaneous Provisions) Act 1968 (c. 34), s. 13(3), Sch. 3 paras. 4, 5

S. 12 applied (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss.3(1)(2),13, Sch. (with s. 14(3)(e))

S. 12 modified (24.12.1999) by S.I. 2000/428, art. 13, Sch. 3 para. 7

C171S. 12(3) amended with the substitution of a reference to the Crown Court for the reference to a Court of quarter sessions by Courts Act 1971 (c. 23), s. 56(2), Sch. 9 Pt. 1

13 Refusal to give possession to acquiring authority.E+W

(1)If the acquiring authority are under this Act authorised to enter on and take possession of any land, and the owner or occupier of any of that land, or any other person, refuses to give up possession of it, or hinders the acquiring authority from entering on or taking possession of it, the acquiring authority may issue their warrant to [F16

(a)the sheriff, or

(b)the enforcement officer,

to deliver possession of it to the person appointed in the warrant to receive it. ]

(2)On receipt of the warrant [F17the person to whom it is issued] shall deliver possession of any such land accordingly.

[F18(2A)If, by virtue of paragraph 3A of Schedule 7 to the Courts Act 2003, the warrant is issued to two or more persons collectively, the duty in subsection (2) of this section shall apply to the person to whom the warrant is allocated in accordance with the approved arrangements mentioned in that Schedule.]

(3)The costs accruing by reason of the issue and execution of the warrant, to be settled by [F19the person executing the warrant], shall be paid by the person refusing to give possession, and the amount of those costs shall be deducted and retained by the acquiring authority from the compensation, if any, payable by them to that person.

(4)If no compensation is payable to the person refusing to give possession, or if it is less than the amount of the costs, that amount or the amount by which the costs exceed the compensation, if not paid on demand, shall be [F20recovered by using the procedure in Schedule 12 to the Tribunals, Courts and Enforcement Act 2007 (taking control of goods)], and on application to any justice of the peace for that purpose he shall issue his warrant accordingly.

F21(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(6)In this section[F22

Textual Amendments

Modifications etc. (not altering text)

C172S. 13 saved by Rent Act 1965 (c. 75), s. 35(4) and Caravan Sites Act 1968 (c. 52), s. 5(3)

S. 13 applied (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss. 3(1)(2), 13, Sch. (with s. 14(3)(e))

S. 13 modified (24.12.1999) by S.I. 2000/428, art. 13, Sch. 3 para. 7

S. 13 applied (2.4.2004) by Docklands Light Railway (Woolwich Arsenal Extension) Order 2004 (S.I. 2004/757), arts. 1, 30(14) (with art. 30(9))

S. 13 applied (with modifications) (11.2.2005) by Merseytram (Liverpool City Centre to Kirkby) Order 2005 (S.I. 2005/120), arts. 1, 36(11), 37(11) (with arts. 65, 66)

S. 13 applied (25.11.2005) by Docklands Light Railway (Capacity Enhancement) Order 2005 (S.I. 2005/3105), arts. 1, 30(10) (with arts. 3(5), 15(3))

S. 13 applied (22.11.2006) by Docklands Light Railway (Stratford International Extension) Order 2006 (S.I. 2006/2905), arts. 1, 27(10), 28(10) (with arts. 27(7), 43)

S. 13 applied (13.12.2006) by Luton Dunstable Translink Order 2006 (S.I. 2006/3118), arts. 1, 24(11)

S. 13 applied (19.3.2007) by Ouseburn Barrage Order 2007 (S.I. 2007/608), arts. 1, 28(10) (with arts. 46-48, Sch. 6 para. 23)

S. 13 applied (23.8.2007) by Docklands Light Railway (Capacity Enhancement and 2012 Games Preparation) Order 2007 (S.I. 2007/2297), arts. 1, 26(10), 27(10) (with arts. 3(6), 12(3))

S. 13 applied (21.5.2008) by Teesport (Land Acquisition) Order 2008 (S.I. 2008/1238), arts. 1(1), 6(10)

S. 13 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), Sch. 5 para. 6

S. 13 applied (28.2.2013) by The Rookery South (Resource Recovery Facility) Order 2013 (S.I. 2013/680), arts. 25(10), 26(10)

S. 13 applied (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 8(9)

S. 13 applied (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 35(11), 36(10)

S. 13 applied (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), arts. 1, 29(10)

S. 13 applied (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 34(11) (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))

S. 13 applied (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), arts. 1, 26(12), 27(9)

S. 13 applied (5.4.2017) by The Keuper Underground Gas Storage Facility Order 2017 (S.I. 2017/433), arts. 1, 27(10), 28(10) (with art. 27(11))

S. 13 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), art. 1, Sch. 7 para. 6

S. 13 applied (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 26(11), 27(10) (with art. 26(12))

S. 13 applied (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), arts. 1, 28(11), 29(11), 30(10) (with arts. 22, 28(12), 29(12))

S. 13 applied (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), arts. 1, 23(10), 24(10) (with arts. 5(9), 24(8), 36, 37, Sch. 8 para. 34)

S. 13 applied (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 28(9), 29(10) (with Sch. 8 para. 20)

S. 13 applied (with modifications) (15.11.2017) by The Network Rail (Summerway Overbridge) Order 2017 (S.I. 2017/1027), arts. 1, 5

S. 13 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 9(9)

S. 13 applied (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 23(10), 24(10) (with arts. 24(8), 32(2))

S. 13 applied (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 31(10), 32(10) (with arts. 4, 37)

S. 13 applied (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 38(10), 39(10) (with arts. 39(8), 55-57, Sch. 8 para. 13)

S. 13 applied (with modifications) (4.1.2018) by The Network Rail (Streat Green Underbridge) (Temporary Land Acquisition) Order 2017 (S.I. 2017/1302), arts. 1, 4

S. 13 applied (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 32(9), 33(11) (with arts. 58, 59)

S. 13 applied (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 24(10), 25(10) (with arts. 24(8), 25(8), 33(2))

S. 13 applied (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 15(11), 16(6), 30(13) (with arts. 15(6), 30(11))

S. 13 applied (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 9(10)

S. 13 applied (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 24(10), 25(10) (with art. 31(2))

S. 13 applied (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 14(10), 18(2)

S. 13 applied (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 29(11), 30(10) (with arts. 3(3), 5, 22)

S. 13 applied (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 26(10)(11), 27(10) (with arts. 6, 42)

S. 13 applied (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 19(11), 20(6), 32(9), 33(10) (with arts. 32(7), 33(8), 55, 56)

S. 13 applied (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 17(6), 27(11), 28(10) (with art. 27(12))

S. 13 applied (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 8(10), 9(10) (with art. 18)

S. 13 applied (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 17(6), 28(11), 29(10)

S. 13 applied (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 17(6), 28(12), 29(10)

S. 13 applied (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 34(10), 35(10) (with Sch. 13 Pt. 1 para. 19)

S. 13 applied (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 33(10), 34(10) (with arts. 3(1), 33(7), 34(8))

S. 13 applied (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 34(9), 35(11) (with arts. 47, 48, Sch. 10 para. 19)

S. 13 applied (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 26(10), 27(10) (with arts. 7, 26(7)(11), 27(8))

S. 13 applied (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 29(11), 30(10) (with arts. 5, 44)

S. 13 applied (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 31(11), 32(10) (with arts. 7, 31(12))

S. 13 applied (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 16(10), 17(6), 33(10), 34(11) (with arts. 51, 57)

S. 13 applied (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 34(10), 35(10)

S. 13 applied (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 22(10), 23(8), 33(11), 34(12) (with arts. 22(6), 33(12), 37)

S. 13 applied (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 29(11), 30(10) (with arts. 5, 44)

S. 13 applied (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 15(7), 24(9), 25(10) (with art. 37)

S. 13 applied (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 16(8), 26(10), 27(11) (with arts. 41, 42, Sch. 16 para. 66)

S. 13 applied (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 29(11), 31(10) (with art. 5)

S. 13 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 16(6), 27(12), 28(11), 33(12) (with Sch. 9 para. 144)

S. 13 applied (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), arts. 7(10), 8(10) (with art. 11(2))

S. 13 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 21(12), 22(6), 35(10), 36(11)

S. 13 applied (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 20(9), 30(11), 31(11) (with art. 32, Sch. 9 para. 36)

S. 13 applied (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 10(10), 11(5), 12(10)