Modifications etc. (not altering text)
C1Pt. 1 applied (with modifications) by Forestry Act 1967 (c. 10), ss. 39, 40, Sch. 4 para. 1, Sch. 5 Pt. III para. 11(1); Agriculture Act 1967 (c. 22), s. 49(7)(i); Greater London Council (General Powers) Act 1967 (c. xx), s. 15; and Post Office Act 1969 (c. 48), s. 60(1)
C2Pt. 1 (ss. 1–32) extended by Telecommunications Act 1984 (c. 12, SIF 96), Sch. 2 para. 16(1)
C3Pt. 1 (ss. 1–32) applied (with modifications): by Local Government Act 1972 (c. 70, SIF 81:1), ss. 120(3), 124(2), 273(1); by S.I. 1978/829, art. 4; by S.I. 1978/1125, art. 3; and by New Towns Act 1981 (c. 64, SIF 123:3), Sch. 6 Pt. 1
C4Pt. 1 (ss. 1–32) applied (except ss. 4-8, 27, 31) by Airports Act 1986 (c. 31, SIF 9), s. 59(2)(a)
C5Pt. 1 (ss. 1–32) applied (with modifications) by Channel Tunnel Act 1987 (c. 53, SIF 102), ss. 6, 37(4)(5), 38, Sch. 2 paras. 2(2), 15(9), Sch. 5 para. 3(1), 5(1), 8
C6Pt. 1 (ss. 1–32) applied (with modifications) by Dartford-Thurrock Crossing Act 1988 (c. 20, SIF 59), s. 2(2), Sch. 2 Pt. 1I para. 1, Sch. 3 para. 1(8)
C7Pt. 1 (ss. 1–32) applied (with modifications) by Planning (Listed Buildings and Conservation Areas) Act 1990 (c. 9, SIF 123:1), s. 52(2)
C8Pt. 1 (ss. 1–32) applied by Town and Country Planning Act 1990 (c. 8, SIF 123:1), s. 227(2)
C9Pt. 1 (ss. 1-32) applied (with modifications) (26.7.1991) by S.I. 1991/1760, art. 3(1)(2)
C10Pt. 1 (ss. 1-32) applied in part (with modifications) (22.10.1991) by Greater Manchester (Light Rapid Transit System) Act 1991 (c. xvi), ss. 3(1)(2), 13, Sch. (with s. 14(3)(e))
C11Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by British Railways Act 1992 (c. i), ss.14(1)(2), 17(6), 20(3)(4), Sch. 2 (with ss. 27, 34)
C12Pt. 1 (ss. 1-32) applied in part (with modifications) (13.2.1992) by Severn Bridges Act 1992 (c. 3), ss.2(2)(3)(4)(6), Sch. 2 para. 7(7)
C13Pt. 1 (ss. 1-32) applied in part (with modifications) (16.7.1992) by River Humber (Upper Pyewipe Outfall) Act 1992 (c. xv), ss.3(1)(2), 17(3)(4), Sch. (with ss. 21, 24, 25).
C14Pt. 1 (ss. 1-32) applied in part (with modifications) (12.11.1992) by Greater Manchester (Light Rapid Transit System) Act 1992 (c. xviii), s. 3(1)(2).
C15Pt. 1 (ss. 1-32) incorporated in part (with modifications) (18.6.1992) by British Railways (No. 2) Act 1992 (c. xi), ss. 4(1)(2), 27(3)(4), Sch. 3 (with ss. 34, 45)
C16Pt. 1 (ss. 1-32) applied in part (29.3.1993) by 1993 c. iv, ss. 4(1)(2), 29(2)(3), Sch. 4 (with ss. 36, 41(5), 44(1))
Pt. 1 (ss. 1-32) applied in part (10.11.1993) by Leasehold Reform, Housing and Urban Development Act 1993 (c. 28), s. 162(6); S.I. 1993/2762, art.3
Pt. 1 (ss. 1-32) applied in part (with modifications) (27.7.1993) by 1993 c. xv, ss. 5(1)(2), 27(4), Sch. 4 (with s. 44)
Pt. 1 (ss. 1-32) applied in part (with modifications) (5.11.1993) by Cardiff Bay Barrage Act 1993 (c. 42), ss. 4(2)-(4), 6, Sch. 5 para. 6(2) (with ss. 2, 30(1), Sch. 2 para. 9)
Pt. 1 (ss. 1-32) applied in part (with modifications) (26.5.1994) by 1994 c. vi, s. 3(1)(2)
Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Croydon Tramlink Act 1994 (c. xi), ss. 5(1)(2), 30(3)(4)(a), 31(1), 56(2)(3), Sch. 4
Pt. 1 (ss. 1-32) applied in part (with modifications) (21.7.1994) by Greater Nottingham Light Rapid Transit Act 1994 (c. xv), ss. 5(1)(2), 22(f), 28(3)(4), 44(8), Sch. 5
Pt. 1 (ss. 1-32) applied (1.1.1996) by Merchant Shipping Act 1995 (c. 21), ss. 197(6)(a), 316(2) (with s. 312(1))
Pt. 1 (ss. 1-32) applied in part (with modifications) (28.7.1998) by Tamar Bridge Act 1998 (c. iv), ss. 4(2)-(4), 5(2)-(4), 6(1), 13, Sch.
Pt. 1 (ss. 1-32) applied (with modifications) (13.1.1999) by Tyne and Wear Passenger Transport (Sunderland) Order 1998 (S.I. 1998/3269), arts. 23(1)(2), 24, Sch. 7
C17Pt. 1 (ss. 1-32) applied (with modifications) (19.2.1999) by S.I. 1999/537, arts. 6(1)(2), 7(2), 11, Sch. 2 paras. 1-8
C18Pt. 1 (ss. 1-32) applied (with modifications) (21.7.1999) by S.I. 1999/2129, art. 15(3), Sch. 5 paras. 3(2), 4-9
C19Pt. 1 (ss. 1-32) applied (with modifications) (22.3.2001) by Channel Tunnel Rail Link (Stratford Station and Subsidiary Works) Order 2001 (S.I. 2001/1451), arts. 9(1)(2), 10(2), 13(a), Sch. 2
Pt. 1 (ss. 1-32) applied (with modifications) (12.8.2002) by Channel Tunnel Rail Link (Thames Tunnel Approach) Order 2002 (S.I. 2002/1943), art. 4(1)(2)
C20Pt. 1 applied in part (25.7.2003 for specified purposes, 29.12.2003 in so far as not already in force) by Communications Act 2003 (c. 21), s. 411(2), Sch. 4 para. 9(1) (with Sch. 18); S.I. 2003/1900, arts. 1(2), 2(1), Schs. 1 (with art. 3) (as amended by S.I. 2003/3142, art. 1(3)); S.I. 2003/3142, art. 3(2) (with art. 11)
C21Pt. 1 applied (with modifications) (22.7.2005) by Midland Metro (Birmingham City Centre Extension, etc.) Order 2005 (S.I. 2005/1794), arts. 1, 26, 34 (with art. 47)
C22Pt. 1 applied (with modifications) (12.1.2007) by Network Rail (West Coast Main Line) (Stowe Hill) Order 2006 (S.I. 2006/3471), arts. 1, 4
C23Pt. 1 applied (with modifications) (16.5.2008) by London Gateway Port Harbour Empowerment Order 2008 (S.I. 2008/1261), arts. 1, 29, 33 (with arts. 41(1), 45, 54(2), 55, 56, 57, 58(6))
C24Pt. 1 applied (with modifications) (22.7.2008) by Crossrail Act 2008 (c. 18), ss. 6, 7(5)(7), Sch. 6 paras. 2, 3, 6, 7, 14
C25Pt. 1 applied in part (with modifications) (29.12.2008) by Network Rail (Thameslink) (Land Acquisition) Order 2008 (S.I. 2008/3163), arts. 1, 4, 11 (with art. 13)
C26Pt. 1 applied (with modifications) (1.3.2010) by Planning Act 2008 (c. 29), ss. 125, 241(8) (with s. 226); S.I. 2010/101, art. 3(f) (with art. 6)
C27Pt. 1 applied (with modifications) (1.7.2011) by The Saundersfoot Harbour Empowerment Order 2011 (S.I. 2011/1565), arts. 1(2), 17
C28Pt. 1 applied in part (15.1.2012) by Localism Act 2011 (c. 20), ss. 207(9), 240(1)(l)
C29Pt. 1 applied in part by Greater London Authority Act 1999 (c. 29), s. 333ZA(8) (as inserted (15.1.2012 for specified purposes, 1.4.2012 in so far as not already in force) by Localism Act 2011 (c. 20), ss. 187(3), 240(2); S.I. 2012/57, art. 4(1)(w) (with arts. 6, 7, 9-11); S.I. 2012/628, art. 6(e) (with arts. 9, 11, 14, 15, 17))
C30Pt. 1 applied (with modifications) (28.3.2013) by The Network Rail (Seaham Level Crossing) Order 2013 (S.I. 2013/533), arts. 1, 6, 11, 13
C31Pt. 1 applied (with modifications) (23.6.2015) by The Norfolk County Council (Norwich Northern Distributor Road (A1067 to A47(T))) Order 2015 (S.I. 2015/1347), art. 1, Sch. 11 paras. 3(2), 4-9
C32Pt. 1 excluded (30.6.2015) by The Swansea Bay Tidal Generating Station Order 2015 (S.I. 2015/1386), arts. 1, 27(1)(a) (with arts. 51, 53)
C33Pt. 1 excluded (7.8.2015) by The Preesall Underground Gas Storage Facility Order 2015 (S.I. 2015/1561), arts. 1, 31(1)(a) (with art. 44)
C34Pt. 1 applied (with modifications) (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), art. 1, Sch. 5 para. 3(2)-9 (with arts. 20(6), 30)
C35Pt. 1 applied (with modifications) (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), art. 1, Sch. 7 para. 3(2)-9
C36Pt. 1 excluded (14.8.2015) by The Hirwaun Generating Station Order 2015 (S.I. 2015/1574), arts. 1, 19(1)(a) (with art. 30)
C37Pt. 1 excluded (14.8.2015) by The Progress Power (Gas Fired Power Station) Order 2015 (S.I. 2015/1570), arts. 1, 20(1)(a)
C38Pt. 1 applied (with modifications) (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), art. 1, Sch. 1 paras. 3(2), 4-9
C39Pt. 1 excluded (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 12(1)(a)
C40Pt. 1 applied (30.9.2015) by The Network Rail (Blackthorn and Piddington) (Land Acquisition) Order 2015 (S.I. 2015/1684), arts. 1, 4
C41Pt. 1 applied (with modifications) (16.12.2015) by The Network Rail (Tinsley Chord) Order 2015 (S.I. 2015/1876), arts. 1, 14 (with art. 24(1)(a))
C42Pt. 1 applied (with modifications) (12.1.2016) by The London Underground (Bank Station Capacity Upgrade) Order 2015 (S.I. 2015/2044), arts. 1, 21, Sch. 6 paras. 3(2), 4-9
C43Pt. 1 applied (with modifications) (18.2.2016) by The A19/A1058 Coast Road (Junction Improvement) Development Consent Order 2016 (S.I. 2016/73), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 37)
C44Pt. 1 applied (with modifications) (25.3.2016) by The Thorpe Marsh Gas Pipeline Order 2016 (S.I. 2016/297), art. 1, Sch. 6 paras. 3(2), 4-9 (with art. 39)
C45Pt. 1 excluded (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), arts. 1, 22(1)(a) (with arts. 4, 5(3))
C46Pt. 1 applied (with modifications) (1.6.2016) by The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016 (S.I. 2016/547), art. 1, Sch. 6 para. 3(2)-9 (with arts. 4, 5(3))
C47Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), arts. 1, 21, 28, 30 (with art. 39)
C48Pt. 1 applied (with modifications) (14.6.2016) by The Midland Metro (Birmingham City Centre Extension, etc.) (Land Acquisition and Variation) Order 2016 (S.I. 2016/545), art. 1, Sch. 2 paras. 3(2), 4-9 (with art. 39)
C49Pt. 1 applied (with modifications) (2.8.2016) by The Meaford Gas Fired Generating Station Order 2016 (S.I. 2016/779), arts. 1, 8, 18(3), Sch. 3 paras. 4-9
C50Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), art. 1, Sch. 5 para. 3(2)-9 (with arts. 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C51Pt. 1 applied (with modifications) (2.8.2016) by The Midland Metro (Wolverhampton City Centre Extension) Order 2016 (S.I. 2016/684), arts. 1, 28 (with arts. 39, 46, 47, Sch. 9 para. 4, Sch. 10 para. 12(2))
C52Pt. 1 applied (with modifications) (10.8.2016) by The York Potash Harbour Facilities Order 2016 (S.I. 2016/772), art. 1, Sch. 3 para. 3(2)-9 (with arts. 35, 36)
C53Pt. 1 applied (with modifications) (19.8.2016) by The North Wales Wind Farms Connection Order 2016 (S.I. 2016/818), art. 1, Sch. 7 para. 3(2)-9 (with art. 35)
C54Pt. 1 applied (with modifications) (7.9.2016) by The Hornsea Two Offshore Wind Farm Order 2016 (S.I. 2016/844), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 37, 38)
C55Pt. 1 applied (with modifications) (15.9.2016) by The River Humber Gas Pipeline Replacement Order 2016 (S.I. 2016/853), art. 1, Sch. 11 para. 3(2)-8 (with art. 43)
C56Pt. 1 applied (with modifications) (23.9.2016) by The M4 Motorway (Junctions 3 to 12) (Smart Motorway) Development Consent Order 2016 (S.I. 2016/863), art. 1, Sch. 6 para. 3(2)-9
C57Pt. 1 applied (with modifications) (27.9.2016) by The Triton Knoll Electrical System Order 2016 (S.I. 2016/880), art. 1(2), Sch. 6 para. 3(2)-9 (with arts. 39, 40, Sch. 8 para. 19)
C58Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), art. 1, Sch. 5 paras. 3(2), 4-9 (with arts. 43, 44)
C59Pt. 1 applied (with modifications) (24.11.2016) by The Transport for Greater Manchester (Light Rapid Transit System) (Trafford Park Extension) Order 2016 (S.I. 2016/1035), arts. 1, 28 (with arts. 37, 43, 44)
C60Pt. 1 applied (with modifications) (23.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), ss. 4(3), 70(1), Sch. 6 para. 2, Sch. 9 paras. 1, 2 (as amended (24.2.2017) by 2017 c. 7, s. 70(2), Sch. 14 paras. 5, 8; S.I. 2017/209, reg. 2)
C61Pt. 1 applied (with modifications) (18.3.2017) by The North London Heat and Power Generating Station Order 2017 (S.I. 2017/215), art. 1, Sch. 11 paras. 3(2), 4, 5
C62Pt. 1 modified (8.8.2017) by The Wrexham Gas Fired Generating Station Order 2017 (S.I. 2017/766), arts. 1, 23(2)(3)
C63Pt. 1 applied (with modifications) (24.8.2017) by The National Grid (Richborough Connection Project) Development Consent Order 2017 (S.I. 2017/817), art. 1, Sch. 10 paras. 3(2), 4-9 (with art. 22)
C64Pt. 1 applied (with modifications) (29.8.2017) by The East Anglia THREE Offshore Wind Farm Order 2017 (S.I. 2017/826), art. 1, Sch. 6 para. 3(2)-9 (with arts. 36, 37, Sch. 8 para. 34)
C65Pt. 1 applied (with modifications) (5.9.2017) by The London Overground (Barking Riverside Extension) Order 2017 (S.I. 2017/830), arts. 1, 22 (with Sch. 8 para. 20)
C66Pt. 1 applied (with modifications) (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), art. 1, Sch. 1 paras. 2, 3
C67Pt. 1 applied (8.12.2017) by The Network Rail (Closure of Abbots Ripton Level Crossing) Order 2017 (S.I. 2017/1074), arts. 1, 8(2)
C68Pt. 1 applied (with modifications) (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 19, Sch. 7 paras. 4, 5 (with arts. 28(1)(a), 32(2))
C69Pt. 1 modified (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 27 (with arts. 4, 23, 37)
C70Pt. 1 applied (with modifications) (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 37)
C71Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), arts. 1, 32 (with arts. 43(1), 55-57, Sch. 8 para. 13)
C72Pt. 1 applied (with modifcations) (2.1.2018) by The Boston Barrier Order 2017 (S.I. 2017/1329), art. 1, Sch. 3 paras. 1, 4-10 (with arts. 55-57, Sch. 8 para. 13)
C73Pt. 1 applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 27 (with arts. 58, 59)
C74Pt. 1 applied (with modifications) (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), art. 1, Sch. 4 paras. 4, 5 (with arts. 58, 59)
C75Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), art. 1, Sch. 6 paras. 4, 5 (with arts. 24(8), 33(2))
C76Pt. 1 applied (with modifications) (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 18, 29 (with arts. 24(8), 33(2))
C77Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 25, Sch. 5 paras. 4, 5
C78Pt. 1 applied (with modifications) (4.6.2018) by The Network Rail (Kings Mill No. 1 Level Crossing) (Land Acquisition and Closure) Order 2018 (S.I. 2018/571), arts. 1, 6, 14, Sch. 2 paras. 4, 5
C79Pt. 1 applied (with modifications) (28.6.2018) by The High Speed Rail (London West Midlands) (Greatmoor Railway Sidings Etc.) Order 2018 (S.I. 2018/693), arts. 1, 8, 13, 15, Sch. 6 paras. 4, 5
C80Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 19, 28(1)(a) (with art. 31(2))
C81Pt. 1 applied (with modifications) (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), art. 1, Sch. 9 paras. 4, 5 (with art. 31(2))
C82Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), arts. 1, 11, 18(1)(a)
C83Pt. 1 applied (with modifications) (26.9.2018) by The Network Rail (Felixstowe Branch Line Improvements Level Crossings Closure) Order 2018 (S.I. 2018/937), art. 1, Sch. 8 paras. 4, 5
C84Pt. 1 modified (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 25 (with arts. 3(3), 5, 22)
C85Pt. 1 applied (with modifications) (3.10.2018) by The A19/A184 Testo's Junction Alteration Development Consent Order 2018 (S.I. 2018/994), art. 1, Sch. 6 paras. 4, 5 (with arts. 3(3), 5)
C86Pt. 1 applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), arts. 1, 24 (with arts. 6, 19(1), 42)
C87Pt. 1 applied (with modifications) (12.10.2018) by The Eggborough Gas Fired Generating Station Order 2018 (S.I. 2018/1020), art. 1, Sch. 9 para. 4(2)-10 (with arts. 6, 42)
C88Pt. 1 applied (with modifications) (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), art. 1, Sch. 5 paras. 4, 5 (with arts. 55, 56)
C89Pt. 1 modified (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 30 (with arts. 55, 56)
C90Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 25
C91Pt. 1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 20(1)(a)
C92Pt. 1 applied (with modifications) (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), art. 1, Sch. 8 paras. 4, 5
C93Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 5 (with arts. 12(1), 18)
C94Pt. 1 applied (with modifications) (7.5.2019) by The Midland Metro (Birmingham City Centre Extension, etc.) (Edgbaston Extension Land Acquisition) Order 2019 (S.I. 2019/882), arts. 1, 7, Sch. 2 paras. 4, 5 (with arts. 12, 18)
C95Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), art. 1, Sch. 8 paras. 4-10
C96Pt. 1 applied (with modifications) (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 26
C97Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 26
C98Pt. 1 applied (with modifications) (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), art. 1, Sch. 9 paras. 4, 5
C99Pt. 1 applied (with modifications) (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), arts. 1, 30 (with Sch. 13 Pt. 1 para. 19)
C100Pt. 1 modified (30.10.2019) by The Northampton Gateway Rail Freight Interchange Order 2019 (S.I. 2019/1358), art. 1, Sch. 12 paras. 4, 5 (with Sch. 13 Pt. 1 para. 19)
C101Pt. 1 applied (with modifications) (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), art. 1, Sch. 13 paras. 4, 5 (with art. 37(2))
C102Pt. 1 applied (with modifications) (25.2.2020) by The Network Rail (East West Rail) (Bicester to Bedford Improvements) Order 2020 (S.I. 2020/114), arts. 1, 23 (with art. 37(2))
C103Pt. 1 applied (with modifications) (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), art. 1, Sch. 6 paras. 4, 5 (with art. 3(1))
C104Pt. 1 modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 29 (with art. 3(1))
C105Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), arts. 1, 29 (with arts. 47, 48, Sch. 10 para. 19)
C106Pt. 1 applied (with modifications) (4.3.2020) by The Midland Metro (Birmingham Eastside Extension) Order 2020 (S.I. 2020/141), art. 1, Sch. 5 paras. 4, 5 (with arts. 47, 48, Sch. 10 para. 19)
C107Pt. 1 applied (with modifications) (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), art. 1, Sch. 4 paras. 4, 5 (with art. 7)
C108Pt. 1 modified (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 24 (with art. 7)
C109Pt. 1 excluded (15.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 2, 20(1)(a) (with arts. 7, 20(2))
C110Pt. 1 applied (with modifications) (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C111Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 29 (with art. 7)
C112Pt. 1 applied (with modifications) (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), art. 1, Sch. 8 paras. 4, 5 (with art. 7)
C113Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), art. 1, Sch. 7 paras. 4, 5 (with arts. 51, 57)
C114Pt. 1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 25(1)(a) (with arts. 51, 57)
C115Pt. 1 applied (with modifications) (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 32 (with arts. 51, 57)
C116Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), art. 1, Sch. 12 paras. 4, 5
C117Pt. 1 applied (with modifications) (25.5.2020) by The West Midlands Rail Freight Interchange Order 2020 (S.I. 2020/511), arts. 1, 30
C118Pt. 1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 26(a) (with art. 37)
C119Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), art. 1, Sch. 9 paras. 4, 5 (with art. 37)
C120Pt. 1 applied (with modifications) (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 29 (with art. 37)
C121Pt. 1 modified (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 25 (with arts. 5, 44)
C122Pt. 1 applied (with modifications) (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), art. 1, Sch. 6 paras. 4, 5 (with arts. 5, 44)
C123Pt. 1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 22(1)(a) (with arts. 5, 44)
C124Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), art. 1, Sch. 6 para. 4 (with art. 37)
C125Pt. 1 applied (with modifications) (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 22 (with art. 37)
C126Pt. 1 modified (22.7.2020) by The Norfolk Vanguard Offshore Wind Farm Order 2020 (S.I. 2020/706), arts. 1, 23 (with arts. 41, 42, Sch. 16 para. 66)
C127Pt. 1 applied (with modifications) (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), art. 1, Sch. 5 paras. 4, 5 (with art. 5)
C128Pt. 1 modified (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 25 (with art. 5)
C129Pt. 1 applied (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), art. 1, Sch. 7 paras. 4, 5 (with Sch. 9 para. 144)
C130Pt. 1 applied (with modifications) (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 25 (with Sch. 9 para. 144)
C131Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), Sch. 2 paras. 4, 5
C132Pt. 1 applied (with modifications) (23.9.2020) by The Midland Metro (Wednesbury to Brierley Hill Land Acquisition) Order 2020 (S.I. 2020/1067), art. 4 (with art. 11(1)(a))
C133Pt. 1 applied (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), art. 1, Sch. 7 paras. 4, 5
C134Pt. 1 modified (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 31
C135Pt. 1 modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 26 (with art. 32, Sch. 9 para. 36)
C136Pt. 1 applied (with modifications) (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), art. 1, Sch. 6 paras. 4, 5 (with art. 32, Sch. 9 para. 36)
C137Pt. 1 applied (with modifications) (2.12.2020) by The Network Rail (London to Corby) (Land Acquisition) Order 2020 (S.I. 2020/1259), arts. 1(1), 5 (with art. 16(1))
C138Pt. 1 applied (with modifications) (31.12.2020) by The Network Rail (Cambridgeshire Level Crossing Reduction) Order 2020 (S.I. 2020/1485), arts. 1, 20, 29, Sch. 14 paras. 4, 5
C139Pt. 1 applied (with modifications) (19.1.2021) by The Network Rail (Suffolk Level Crossing Reduction) Order 2020 (S.I. 2020/1663), art. 1, Sch. 8 paras. 4, 5
C140Pt. 1 applied (with modifications) (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), art. 1, Sch. 7 para. 4(2)-10 (with arts. 40, 41, Sch. 9 Pt. 5 para. 18)
C141Pt. 1 applied (with modifications) (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), art. 1, Sch. 7 paras. 4, 5 (with art. 5, Sch. 27 para. 36)
C142Pt. 1 modified (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 28 (with art. 5, Sch. 27 para. 36)
C143Pt. 1 applied (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 4(3), 64(1) (with s. 9(1)(a))
C144Pt. 1 applied (with modifications) (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), s. 64(1), Sch. 9 paras. 1, 2(1)-(8), Sch. 10 (with s. 9(1)(a))
C145Pt. 1 modified (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 29 (with arts. 4, 47)
C146Pt. 1 applied (with modifications) (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), art. 1, Sch. 6 paras. 4, 5 (with arts. 4, 47)
C147Pt. 1 applied (with modifications) (1.4.2021) by The Network Rail (Ferryboat Lane Footbridge Reconstruction) (Land Acquisition) Order 2021 (S.I. 2021/299), arts. 1, 4 (with art. 11)
C148Pt. 1 applied (with modifications) (16.4.2021) by The Network Rail (Chart Leacon) Order 2021 (S.I. 2021/419), arts. 1, 4, Sch. 1 paras. 4, 5 (with art. 12(1)(a))
C149Pt. 1 applied (with modifications) (1.9.2021) by The Network Rail (Teddington Station Access for All) Order 2021 (S.I. 2021/937), arts. 1, 6, Sch. 5 paras. 4, 5
(1)When the acquiring authority require to purchase any of the land subject to compulsory purchase, they shall give notice (hereafter in this Act referred to as a “notice to treat”) to all the persons interested in, or having power to sell and convey or release, the land, so far as known to the acquiring authority after making diligent inquiry.
(2)Every notice to treat—
(a)shall give particulars of the land to which the notice relates,
(b)shall demand particulars of the recipient’s estate and interest in the land, and of the claim made by him in respect of the land, and
(c)shall state that the acquiring authority are willing to treat for the purchase of the land, and as to the compensation to be made for the damage which may be sustained by reason of the execution of the works.
[F1(2ZA)For provision about notice of claims for compensation, see sections 4 and 4A of the Land Compensation Act 1961.]
[F2(2A)A notice to treat shall cease to have effect at the end of the period of three years beginning with the date on which it is served unless—
(a)the compensation has been agreed or awarded or has been paid or paid into court,
(b)a general vesting declaration has been executed under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981,
(c)the acquiring authority have entered on and taken possession of the land specified in the notice, or
(d)the question of compensation has been referred to the [F3Upper Tribunal].
(2B)If the person interested in the land, or having power to sell and convey or release it, and the acquiring authority agree to extend the period referred to in subsection (2A) of this section, the notice to treat shall cease to have effect at the end of the period as extended unless—
(a)any of the events referred to in that subsection have then taken place, or
(b)the parties have agreed to a further extension of the period (in which case this subsection shall apply again at the end of the period as further extended, and so on).
(2C)Where a notice to treat ceases to have effect by virtue of subsection (2A) or (2B) of this section, the acquiring authority—
(a)shall immediately give notice of that fact to the person on whom the notice was served and any other person who, since it was served, could have made an agreement under subsection (2B) of this section, and
(b)shall be liable to pay compensation to any person entitled to such a notice for any loss or expenses occasioned to him by the giving of the notice and its ceasing to have effect.
(2D)The amount of any compensation payable under subsection (2C) shall, in default of agreement, be determined by the [F4Upper Tribunal].
(2E)Compensation payable to any person under subsection (2C) shall carry interest at the rate prescribed under section 32 of the Land Compensation Act 1961 from the date on which he was entitled to to be given notice under that subsection until payment.]
(3)Schedule 2 to this Act (which relates to absent or untraced owners) shall have effect for the purposes of this Act.
Textual Amendments
F1S. 5(2ZA) inserted (6.4.2018) by Housing and Planning Act 2016 (c. 22), ss. 192(2), 216(3); S.I. 2018/251, reg. 4(c)
F2S. 5(2A)-(2E) inserted (25.9.1991) by Planning and Compensation Act 1991 (c. 34, SIF 28:1), s. 67; S.I. 1991/2067, art. 3.
F3Words in s. 5(2A)(d) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 60 (with Sch. 5)
F4Words in s. 5(2D) substituted (1.6.2009) by The Transfer of Tribunal Functions (Lands Tribunal and Miscellaneous Amendments) Order 2009 (S.I. 2009/1307), art. 1, Sch. 1 para. 60 (with Sch. 5)
Modifications etc. (not altering text)
C150Pt. 1 applied (with modifications) (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), art. 1(2), Sch. 5 paras. 4, 5
C151S. 5: restricted by Housing Act 1985 (c. 68, SIF 61), ss. 305(2), 307