Search Legislation

Reservoirs Act 1975

 Help about what version

What Version

 Help about advanced features

Advanced Features

Changes to legislation:

Reservoirs Act 1975, Section 8 is up to date with all changes known to be in force on or before 13 August 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Revised legislation carried on this site may not be fully up to date. Changes and effects are recorded by our editorial team in lists which can be found in the ‘Changes to Legislation’ area. Where those effects have yet to be applied to the text of the legislation by the editorial team they are also listed alongside the legislation in the affected provisions. Use the ‘more’ link to open the changes and effects relevant to the provision you are viewing.

View outstanding changes

Changes and effects yet to be applied to Section 8:

  • s. 8 amendments by 2003 c. 37 s. 75 extended to Scotland by 2009 asp 6 s. 87

Changes and effects yet to be applied to the whole Act associated Parts and Chapters:

Whole provisions yet to be inserted into this Act (including any effects on those provisions):

[F18 Powers of enforcement authority in event of non-compliance with requirements as to construction or enlargement of reservoirs. E+W+S

(1)Where it appears to the enforcement authority either—

(a)that a large raised reservoir is being constructed (whether as a new reservoir or by the alteration of an [F2existing structure or area] that is not a large raised reservoir) or is being altered so as to increase [F3or decrease] its capacity; or

(b)that, a large raised reservoir having been so constructed or altered, no final certificate has yet been given for the reservoir on the construction or alteration, as the case may be;

but that no qualified civil engineer is responsible for the reservoir or [F4alteration] as construction engineer, the authority may by written notice served on the undertakers require them within twenty eight days after the date when the notice is served to appoint a qualified civil engineer for the purposes of this section, unless an appointment has already been made, and (in either case) to notify the authority of the appointment.

(2)An engineer appointed for the purposes of this section shall be appointed to inspect the reservoir and make a report on the construction or alteration, and to supervise the reservoir until he gives a final certificate for the reservoir under this section.

(3)An engineer acting under this section shall include in his report any recommendations he sees fit to make as to measures to be taken in the interests of safety; and, subject to any reference of the matter to a referee in accordance with this Act, the undertakers shall carry any such recommendation into effect [F5within the period which the report must specify in respect of each recommendation.]

[F6(3A)Where it appears to the enforcement authority that the report of an engineer acting under this section includes a recommendation as to measures to be taken in the interests of safety that has not been carried into effect as required by this section, the authority may by written notice served on the undertakers require them to carry the recommendation into effect within a time specified in the notice.

(3B)Where an enforcement authority propose to serve such a notice, the authority shall consult as to the time to be specified in the notice a civil engineer, being a qualified civil engineer for the purpose of inspecting and supervising the reservoir under this section.]

(4)Except as provided by subsections (5) and (6) below, an engineer acting under this section shall have the same powers and duties in relation to the giving of preliminary certificates, interim certificates and final certificates as if he were the construction engineer responsible for the reservoir or, as the case may be, the [F7alteration] to it; and certificates under this subsection shall have effect for purposes of this Act as if they were certificates of a construction engineer.

(5)A final certificate under this section may be given less than three years after the first issue of a preliminary certificate, or without the previous issue of a preliminary certificate, if the engineer is satisfied that the reservoir F8... has for a period of three years or more been filled with water up to the level that is specified in the preliminary certificate or, if no preliminary certificate has been issued, up to the level that is specified in the final certificate, and that the reservoir F9... is sound and satisfactory and may safely be used for the storage of water.

(6)A final certificate under this section, other than one given by virtue of subsection (5) above, shall not be required to state that the engineer is satisfied the reservoir F10... is sound and satisfactory; but, if it does not do so and the engineer’s report includes any recommendations as to measures to be taken in the interests of safety, the certificate shall instead state that those recommendations have been carried into effect.

(7)In addition to certificates under subsection (4) above, an engineer acting under this section, shall, as soon as practicable after the completion of the works and in any event not later than the giving of the final certificate, give a certificate that, so far as he has been able to ascertain, the works have been efficiently executed in accordance with the drawings and descriptions annexed to the certificate, and shall annex to the certificate detailed drawings and descriptions giving such information as he can of the works actually constructed, including dimensions and levels and details of the geological strata or deposits encountered in trial holes or excavations made in connection with the works

(8)References in this Act to a final certificate under this section or to a certificate under subsection (7) above include the annex to the certificate, where there is one.]

Textual Amendments

F2Words in s. 8(1) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 3(4) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F3Words in s. 8(1)(a) inserted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(5)(a) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F4Word in s. 8(1) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(5)(b) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F7Word in s. 8(4) substituted (30.7.2013 for E., 1.4.2016 for W.) by Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(7) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F8Words in s. 8(5) omitted (30.7.2013 for E., 1.4.2016 for W.) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(8)(a) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F9Words in s. 8(5) omitted (30.7.2013 for E., 1.4.2016 for W.) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(8)(b) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

F10Words in s. 8(6) omitted (30.7.2013 for E., 1.4.2016 for W.) by virtue of Flood and Water Management Act 2010 (c. 29), s. 49(3), Sch. 4 para. 11(9) (with s. 49(1)(6)); S.I. 2013/1590, art. 3(b); S.I. 2016/79, art. 2(b)

Modifications etc. (not altering text)

C1Ss. 6–10 modified by S.I. 1986/466, art. 2(2), Sch. 1

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources