- Latest available (Revised)
- Point in Time (01/04/1997)
- Original (As enacted)
Version Superseded: 01/03/2010
Point in time view as at 01/04/1997.
Highways Act 1980, Cross Heading: Construction of bridges over and tunnels under navigable waters is up to date with all changes known to be in force on or before 16 November 2024. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations.
Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.
(1)Provision may be made by an order made by the Minister under this subsection or under section 10 above (orders for trunk roads) for the construction of a bridge over or a tunnel under any specified navigable waters as part of a trunk road.
(2)Provision may be made by a scheme under section 16 above (schemes for special roads) for the construction of a bridge over or a tunnel under specified navigable waters as part of a special road.
(3)Provision may be made by a scheme made by a local highway authority under this subsection, and confirmed by the Minister, for the construction of a bridge over or a tunnel under specified navigable waters as part of a highway or proposed highway which is or is to be a highway (other than a special road) maintainable at the public expense by the authority.
(4)Provision may be made by an order under section 14 above (roads that cross or join trunk or classified roads) or section 18 above (supplementary orders relating to special roads)—
(a)for the construction of a bridge over or tunnel under specified navigable waters as part of a highway which is to be altered or constructed in pursuance of the order;
(b)where the order authorises the highway authority by whom it is made to provide a new means of access to any premises from a highway, for the access to be provided by means of a bridge over specified navigable waters and for the construction of the bridge.
(5)Parts I and III of Schedule 1 to this Act have effect as to the making of an order under subsection (1) above, Parts II and III of that Schedule have effect as to the making of a scheme under subsection (3) above and Schedule 2 to this Act has effect as to the validity and date of operation of any such order or scheme.
(6)A scheme under subsection (3) above may be submitted to the Minister jointly by any two or more local highway authorities, and any such scheme may determine which of those authorities is to be the highway authority for the bridge or tunnel or any part of it, and may provide—
(a)for the performance by that authority, in relation to the bridge or tunnel or that part of it, of any of the highway functions of any other authority who are party to the application, and
(b)for the making of contributions by that other authority to the highway authority in respect of expenditure incurred in the performance of those functions.
(7)References in this section, in relation to any order or scheme, to specified navigable waters are references to such navigable waters (whether the sea, a river or other waters) as may be specified in the order or scheme.
(8)References in the following provisions of this Part of this Act to an order or scheme which provides for the construction of a bridge over or a tunnel under navigable waters are references to any order or scheme made under or by virtue of subsection (1), (2), (3) or (4) above.
(1)Before making or confirming an order or scheme which provides for the construction of a bridge over or a tunnel under navigable waters, the Minister shall take into consideration the reasonable requirements of navigation over the waters affected by the order or scheme.
(2)An order or scheme which provides for the construction of such a bridge shall include such plans and specifications as may be necessary to indicate the position and dimensions of the proposed bridge including its spans, headways and waterways, and in the case of a swing bridge shall contain such provisions as the Minister considers expedient for regulating its operation.
(3)An order or scheme which provides for the construction of such a tunnel shall include such plans and specifications as may be necessary to indicate the position and dimensions of the proposed tunnel, including its depth below the bed of the navigable waters.
(4)If objection to an order or scheme proposed to be made or, as the case may be, to an order or scheme made and proposed to be confirmed, is duly made in accordance with Schedule 1 to this Act by [F1the National Rivers Authority or any navigation authority] on whom notice is required to be served under paragraph 3 or, as the case may be, paragraph 11 of that Schedule, on the ground that the bridge or tunnel is likely to obstruct or impede the performance of their functions under any enactment, or to interfere with the reasonable requirements of navigation over the waters affected by the order or scheme, as the case may be, and the objection is not withdrawn, the order or scheme, as the case may be, shall be subject to special parliamentary procedure.
Textual Amendments
F1Words substituted by Water Act 1989 (c. 15, SIF 130), ss. 58(7), 101(1), 141(6), 160(1)(2)(4), 163, 189(4)–(10), 190, 193(1), Sch. 25 para. 62(5), Sch. 26 paras. 3(1)(2), 17, 40(4), 57(6), 58
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.
Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.
Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: