Textual Amendments
F1Sch. A1 inserted (3.2.2017) by Housing and Planning Act 2016 (c. 22), s. 216(3), Sch. 18 para. 6; S.I. 2017/75, reg. 3(k) (with reg. 5)
Modifications etc. (not altering text)
C1Sch. A1 excluded by 2017 c. 7, s. 7(2) (as amended) (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 2; S.I. 2017/209, reg. 2
C2Sch. A1 excluded by 2017 c. 7, s. 8(2) (as amended) (24.2.2017) by High Speed Rail (London - West Midlands) Act 2017 (c. 7), s. 70(2), Sch. 14 para. 3; S.I. 2017/209, reg. 2
C3Sch. A1 excluded (19.12.2017) by The Network Rail (Buxton Sidings Extension) Order 2017 (S.I. 2017/1150), arts. 1, 22(3) (with arts. 22(4), 32(2))
C4Sch. A1 excluded (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 29(3)(b) (with arts. 4, 29(4), 37)
C5Sch. A1 excluded (4.1.2018) by The Blackpool Tramway (Blackpool North Extension) Order 2017 (S.I. 2017/1214), arts. 1, 30(3)(b) (with arts. 30(4), 58, 59)
C6Sch. A1 excluded (18.4.2018) by The Network Rail (Hope Valley Capacity) Order 2018 (S.I. 2018/446), arts. 1, 21(4)(b) (with arts. 24(8), 33(2))
C7Sch. A1 excluded (31.5.2018) by The Silvertown Tunnel Order 2018 (S.I. 2018/574), arts. 1(2), 27(4)(b) (with art. 27(5))
C8Sch. A1 excluded (24.8.2018) by The Network Rail (Werrington Grade Separation) Order 2018 (S.I. 2018/923), arts. 1, 22(3)(b) (with arts. 22(4), 31(2))
C9Sch. A1 excluded (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 27 (with arts. 3(3), 5)
C10Sch. A1 excluded (13.3.2019) by The Port of Tilbury (Expansion) Order 2019 (S.I. 2019/359), arts. 1, 26(3)(b)(4) (with arts. 55, 56)
C11Sch. A1 excluded (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 24(3)(b) (with art. 24(4))
C12Sch. A1 excluded (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 25(3)(b) (with art. 25(4))
C13Sch. A1 excluded (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 25(3)(b) (with art. 25(4))
C14Sch. A1 excluded (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1(1), 31(3)(b) (with arts. 3(1), 31(4))
C15Sch. A1 excluded (14.4.2020) by The Reinforcement to the North Shropshire Electricity Distribution Network Order 2020 (S.I. 2020/325), arts. 1, 23(3)(b) (with arts. 7, 23(4))
C16Sch. A1 excluded (30.4.2020) by The A585 Windy Harbour to Skippool Highway Development Consent Order 2020 (S.I. 2020/402), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
C17Sch. A1 excluded (1.5.2020) by The Riverside Energy Park Order 2020 (S.I. 2020/419), arts. 1, 25(3)(b) (with arts. 7, 25(4))
C18Sch. A1 excluded (21.5.2020) by The Lake Lothing (Lowestoft) Third Crossing Order 2020 (S.I. 2020/474), arts. 1, 27(4)(b) (with arts. 51, 57)
C19Sch. A1 excluded (11.6.2020) by The M42 Junction 6 Development Consent Order 2020 (S.I. 2020/528), arts. 1, 31(3)(b) (with arts. 31(4), 37)
C20Sch. A1 excluded (18.6.2020) by The A63 (Castle Street Improvement, Hull) Development Consent Order 2020 (S.I. 2020/556), arts. 1, 27(3)(b) (with arts. 5, 27(4), 44)
C21Sch. A1 excluded (19.6.2020) by The Cleve Hill Solar Park Order 2020 (S.I. 2020/547), arts. 1, 21(3)(b) (with arts. 21(4), 37)
C22Sch. A1 excluded (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 27(3)(b) (with arts. 5, 27(4))
C23Sch. A1 excluded (1.9.2020) by The Immingham Open Cycle Gas Turbine Order 2020 (S.I. 2020/847), arts. 1, 24(3)(b) (with art. 24(4), Sch. 9 para. 144)
C24Sch. A1 excluded (15.10.2020) by The Great Yarmouth Third River Crossing Development Consent Order 2020 (S.I. 2020/1075), arts. 1, 33(4)(b) (with art. 33(5))
C25Sch. A1 excluded (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 28(3)(b) (with arts. 28(4), 32, Sch. 9 para. 36)
C26Sch. A1 excluded (22.1.2021) by The Hornsea Three Offshore Wind Farm Order 2020 (S.I. 2020/1656), arts. 1, 23(3) (with arts. 23(4), 40, 41, Sch. 9 Pt. 5 para. 18)
C27Sch. A1 excluded (9.2.2021) by The A1 Birtley to Coal House Development Consent Order 2021 (S.I. 2021/74), arts. 1, 30(3)(b) (with arts. 5, 30(4), Sch. 27 para. 36)
C28Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 7(2)(b), 64(1) (with s. 7(3))
C29Sch. A1 excluded (11.2.2021) by High Speed Rail (West Midlands - Crewe) Act 2021 (c. 2), ss. 6(2)(b), 64(1)
C30Sch. A1 excluded (19.2.2021) by The A303 Sparkford to Ilchester Dualling Development Consent Order 2021 (S.I. 2021/125), arts. 1, 31(3)(b) (with arts. 4, 31(4), 47)
C31Sch. A1 excluded (22.12.2021) by The Morlais Demonstration Zone Order 2021 (S.I. 2021/1478), arts. 1, 26(3)(b) (with arts. 15, 50, Sch. 11 para. 29)
C32Sch. A1 excluded (1.1.2022) by The Norfolk Boreas Offshore Wind Farm Order 2021 (S.I. 2021/1414), arts. 1, 24(3)(b) (with arts. 41, 42, Sch. 17 para. 66)
C33Sch. A1 excluded (5.3.2022) by The Norfolk Vanguard Offshore Wind Farm Order 2022 (S.I. 2022/138), arts. 1, 24(3)(b) (with arts. 24(4), 41, 42, Sch. 16)
C34Sch. A1 excluded (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 25(b) (with Sch. 8 Pt. 6 para. 19)
C35Sch. A1 excluded (25.3.2022) by The Bridgwater Tidal Barrier Order 2022 (S.I. 2022/299), arts. 1, 35 (with art. 55)
C36Sch. A1 excluded (22.4.2022) by The East Anglia ONE North Offshore Wind Farm Order 2022 (S.I. 2022/432), arts. 1(2), 24(3)(b) (with arts. 40, 41)
C37Sch. A1 excluded (22.4.2022) by The East Anglia TWO Offshore Wind Farm Order 2022 (S.I. 2022/433), arts. 1(2), 24(3)(b) (with arts. 24(4), 40, 41)
C38Sch. A1 excluded (12.5.2022) by The M54 to M6 Link Road Development Consent Order 2022 (S.I. 2022/475), arts. 1, 27(3)(b) (with art. 27(4))
C39Sch. A1 excluded (2.6.2022) by The M25 Junction 10/A3 Wisley Interchange Development Consent Order 2022 (S.I. 2022/549), arts. 1, 30(3)(b) (with arts. 6, 30(4), 34)
C40Sch. A1 excluded (6.6.2022) by The M25 Junction 28 Development Consent Order 2022 (S.I. 2022/573), arts. 1, 32(3)(b) (with arts. 5, 32(4), 36)
C41Sch. A1 excluded (13.7.2022) by The A47 Blofield to North Burlingham Development Consent Order 2022 (S.I. 2022/738), arts. 1, 32(3)(b) (with arts. 4, 32(4), 50)
C42Sch. A1 excluded (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 35 (with arts. 35(4), 62, 76, 87)
C43Sch. A1 excluded (2.9.2022) by The A47 North Tuddenham to Easton Development Consent Order 2022 (S.I. 2022/911), arts. 1, 31(3)(b) (with arts. 4, 31(4), 53)
C44Sch. A1 excluded (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 35(3)(b)
C45Sch. A1 excluded (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 30-32 (with art. 46(2), Sch. 19 para. 61)
C46Sch. A1 excluded (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 32(3) (with arts. 4, 52, Sch. 9 para. 82)
C47Sch. A1 excluded (5.12.2022) by The Portishead Branch Line (MetroWest Phase 1) Order 2022 (S.I. 2022/1194), arts. 1, 31(3)(b) (with arts. 31(4), 51)
C48Sch. A1 excluded (7.12.2022) by The A57 Link Roads Development Consent Order 2022 (S.I. 2022/1206), arts. 1, 29(3)(b) (with arts. 5, 29(4))
C49Sch. A1 excluded (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 32(3) (with arts. 4, 32(4))
C50Sch. A1 excluded (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 32(3) (with arts. 4, 50)
C51Sch. A1 excluded (29.12.2022) by The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 (S.I. 2022/1396), arts. 1, 24(3)(b) (with arts. 24(4), 32, Sch. 10 paras. 26(2), 68)
C52Sch. A1 excluded (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 23(3) (with art. 23(4))
C53Sch. A1 excluded (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 32(3)(b) (with arts. 5, 32(4), 53, Sch. 8 paras. 6, 64)
C54Sch. A1 excluded (3.8.2023) by The Hornsea Four Offshore Wind Farm Order 2023 (S.I. 2023/800), arts. 1, 25(3) (with arts. 25(4), 42, 43, Sch. 9 Pt. 1 para. 4, Sch. 9 Pt. 3 para. 6(1), Sch. 9 Pt. 4 para. 20, Sch. 9 Pt. 9 para. 4)
C55Sch. A1 excluded (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 27(4) (with arts. 6(2), 18, 27(5), Sch. 11 paras. 5, 30)
C56Sch. A1 excluded (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 31(3) (with arts. 4, 31(4), 45, Sch. 9 paras. 6, 46, 54(1))
C57Sch. A1 excluded (11.10.2023) by The Awel y Môr Offshore Wind Farm Order 2023 (S.I. 2023/1033), arts. 1, 24
C58Sch. A1 excluded (7.2.2024) by The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024 (S.I. 2024/70), arts. 1, 22(3) (with arts. 22(4), 43, Sch. 12 paras. 5, 24)
C59Sch. A1 excluded (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 38(3) (with arts. 4, 38(4), 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C60Sch. A1 excluded (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 28(3) (with arts. 28(4), 42, 43, Sch. 12)
C61Sch. A1 excluded (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 26(3) (with art. 26(4), Sch. 11)
C62Sch. A1 excluded (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 27(3) (with arts. 18, 27(4), 35, Sch. 9)
C63Sch. A1 excluded (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 34(3) (with art. 44, Sch. 15)
C64Sch. A1 excluded (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 31(4) (with arts. 21, 41, Sch. 10)
C65Sch. A1 excluded (9.5.2024) by The Sheringham Shoal and Dudgeon Extensions Offshore Wind Farm Order 2024 (S.I. 2024/564), arts. 1, 22(4) (with arts. 22(5), 35, 36, Sch. 14)
C66Sch. A1 excluded (14.6.2024) by The A1 in Northumberland: Morpeth to Ellingham Development Consent Order 2024 (S.I. 2024/733), arts. 1, 34(3) (with art. 6, Sch. 10)
C67Sch. A1 excluded (3.8.2024) by The Gate Burton Energy Park Order 2024 (S.I. 2024/807), arts. 1, 23(3) (with arts. 23(4), 45, Sch. 14)
C68Sch. A1 excluded (3.8.2024) by The Mallard Pass Solar Farm Order 2024 (S.I. 2024/796), arts. 1, 25(3) (with art. 25(4), Sch. 15)
C69Sch. A1 excluded (3.8.2024) by The Sunnica Energy Farm Order 2024 (S.I. 2024/802), arts. 1, 22(3) (with arts. 22(4), 44, Sch. 12)
C70Sch. A1 excluded (27.9.2024) by The Cottam Solar Project Order 2024 (S.I. 2024/943), arts. 1, 25(3) (with arts. 25(4), 48, Sch. 15)
1(1)This Schedule applies where an acquiring authority have executed a general vesting declaration in respect of part only of a house, building or factory.E+W
(2)But see section 2A of the Acquisition of Land Act 1981 (under which a compulsory purchase order can exclude from this Schedule land that is 9 metres or more below the surface).
2E+WA person able to sell the whole of the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner's interest in the whole.
3E+WA counter-notice under paragraph 2 must be served before the end of the period of 28 days beginning with the day the owner first had knowledge of the general vesting declaration.
4E+WIn a case where this Schedule applies by virtue of a general vesting declaration executed after a counter-notice has been served under paragraph 4 or 17 of Schedule 2A to the Compulsory Purchase Act 1965, that counter-notice is to have effect as a counter-notice served under this Schedule.
5[F2(1)] In this Schedule—E+W
“additional land” means the part of the house, building or factory not specified in the general vesting declaration;
“house” includes any park or garden belonging to a house;
“land proposed to be acquired” means the part of the house, building or factory specified in the general vesting declaration;
“notice to treat” means a notice to treat deemed to have been served under section 7(1);
“original vesting date” is [F3, subject to sub-paragraph (2)] the first day after the end of the period specified in the general vesting declaration in accordance with section 4(1).
[F4(2)If an agreement under section 8A is in force in respect of the interest which gives the owner the ability to sell the land proposed to be acquired, the “original vesting date” is the date on which the interest is to vest as a result of the agreement.]]
Textual Amendments
F2Words in Sch. A1 para. 5 renumbered as Sch. A1 para. 5(1) (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(a), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
F3Words in Sch. A1 para. 5(1) inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(b), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))
F4Sch. A1 para. 5(2) inserted (31.1.2024) by Levelling-up and Regeneration Act 2023 (c. 55), ss. 186(6)(c), 255(7) (with s. 247); S.I. 2024/92, reg. 2(m) (with reg. 6(2))