In the district of Shepway (parishes of Newington and Saltwood), in the county of Kent—
Work No. 30—A railway (700 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with Work No. 1 at its commencement:
Work No. 30A—A railway (1270 metres in length) at Dolland’s Moor, commencing by a junction with the railway between Ashford and Folkestone West at a point 375 metres east of the eastern portal of Saltwood Tunnel and terminating by a junction with Work No. 30 at a point 125 metres from the termination of that work:
Work No. 30B—A railway (558 metres in length), being a deviation of the railway between Ashford and Folkestone West, commencing by a junction with that railway at the said point 135 metres west of the existing bridge carrying the B2065 over that railway and terminating by a junction with that railway at a point 415 metres east of that bridge.