Print Options
PrintThe Whole
Act
PrintThe Whole
Schedule
PrintThe Whole
Part
PrintThis
Section
only
Changes over time for: Paragraph 13


Timeline of Changes
This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.
Status:
Point in time view as at 01/04/1996.
Changes to legislation:
There are currently no known outstanding effects for the Dartford-Thurrock Crossing Act 1988, Paragraph 13.

Changes to Legislation
Revised legislation carried on this site may not be fully up to date. At the current time any known changes or effects made by subsequent legislation have been applied to the text of the legislation you are viewing by the editorial team. Please see ‘Frequently Asked Questions’ for details regarding the timescales for which new effects are identified and recorded on this site.
13(1)Except as provided in sub-paragraph (2) below, the Port Authority shall not be liable, in the absence of negligence, for any damage caused to the tunnel highway, or to any temporary or permanent works carried out in connection with the construction, maintenance or improvement of the tunnel highway, by—E+W
(a)dredging operations of the Port Authority; or
(b)the carrying out by them in the execution of their statutory powers and duties of any operations in the river or works for the improvement or maintenance of the river.
(2)The Port Authority shall not be excused from liability under sub-paragraph (1) above in respect of the carrying out of any dredging or other operations or works within 61 metres on each side of either of the centre lines of the tunnels and below the depth of 15.7 metres below ordnance datum (Newlyn) within the part of the river width between a line 130 metres from the line of the existing level of mean high-water springs on the southern bank of the river and a line 355 metres northward of that first-mentioned line or, outside that part, below the dredging line shown on a line mid-way between the two tunnels on the sheet signed by Geoffrey Ennals, Secretary to the Port Authority, and Philip Wood, an Under-Secretary in the Department of Transport, and marked “Diagram referred to in Part I of Schedule 7”, copies of which have been deposited in the Office of the Clerk of the Parliaments and the Private Bill Office of the House of Commons.