Search Legislation

Town and Country Planning Act 1990

 Help about what version

What Version

 Help about advanced features

Advanced Features

Status:

Point in time view as at 01/04/2005.

Changes to legislation:

There are outstanding changes not yet made by the legislation.gov.uk editorial team to Town and Country Planning Act 1990. Any changes that have already been made by the team appear in the content and are referenced with annotations. Help about Changes to Legislation

Close

Changes to Legislation

Changes and effects yet to be applied by the editorial team are only applicable when viewing the latest version or prospective version of legislation. They are therefore not accessible when viewing legislation as at a specific point in time. To view the ‘Changes to Legislation’ information for this provision return to the latest version view using the options provided in the ‘What Version’ box above.

Part XIIE+W Validity

284 Validity of development plans and certain orders, decisions and directions.E+W

(1)Except in so far as may be provided by this Part, the validity of—

(a)F1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)a simplified planning zone scheme or an alteration of such a scheme, whether before or after the adoption or approval of the scheme or alteration; or

(c)an order under any provision of Part X except section 251(1), whether before or after the order has been made; or

(d)an order under section 277, whether before or after the order has been made; or

(e)any such order as is mentioned in subsection (2), whether before or after it has been confirmed; or

(f)any such action on the part of the Secretary of State as is mentioned in subsection (3),

shall not be questioned in any legal proceedings whatsoever.

(2)The orders referred to in subsection (1)(e) are—

(a)any order under section 97 or under the provisions of that section as applied by or under any other provision of this Act;

(b)any order under section 102;

(c)any tree preservation order;

(d)any order made in pursuance of section 221(5);

(e)any order under paragraph 1, 3, 5 or 6 of Schedule 9.

(3)The action referred to in subsection (1)(f) is action on the part of the Secretary of State of any of the following descriptions—

(a)any decision on an application for planning permission referred to him under section 77;

(b)any decision on an appeal under section 78;

F2(c). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(d)any decision to confirm a completion notice under section 95;

(e)any decision to grant planning permission under paragraph (a) of section 177(1) or to discharge a condition or limitation under paragraph (b) of that section;

(f)any decision to confirm or not to confirm a purchase notice including—

(i)any decision not to confirm such a notice in respect of part of the land to which it relates, or

(ii)any decision to grant any permission, or give any direction, instead of confirming such a notice, either wholly or in part;

(g)any decision F3. . . on an appeal under section 195(1);

(h)any decision relating—

(i)to an application for consent under a tree preservation order,

(ii)to an application for consent under any regulations made in accordance with section 220 or 221, or

(iii)to any certificate or direction under any such order or regulations,

whether it is a decision on appeal or a decision on an application referred to the Secretary of State for determination in the first instance.

[F4(i)any decision on an application for planning permission under section 293A.]

(4)Nothing in this section shall affect the exercise of any jurisdiction of any court in respect of any refusal or failure on the part of the Secretary of State to take any such action as is mentioned in subsection (3).

Textual Amendments

F1S. 284(1)(a) repealed (28.9.2004 (E.), 15.10.2005 (W.)) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 118, 120, 121, Sch. 6 para. 8, Sch. 9 (with s. 111); S.I. 2004/2202, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 4); S.I. 2005/2847, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 3)

F4S. 284(3)(i) inserted (6.8.2004 for certain purposes, 7.6.2006 otherwise) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 82(2), 121 (with s. 111); S.I. 2004/ 2097, {art. 2}; S.I. 2006/1281, art. 2

Modifications etc. (not altering text)

C1 S. 284 extended (25.9.1991) by Planning and Compensation Act 1991 (c. 34, SIF 123:1), s. 22, Sch. 2 para. 9 (3) (with s. 84(5)); S.I. 1991/2067, art. 3 (subject to art. 4)

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 13 para. 16(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 14 para. 9(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

285 Validity of enforcement notices and similar notices. E+W

(1)F5. . . The validity of an enforcement notice shall not, except by way of an appeal under Part VII, be questioned in any proceedings whatsoever on any of the grounds on which such an appeal may be brought.

(2)Subsection (1) shall not apply to proceedings brought under section 179 F5. . . against a person who—

(a)has held an interest in the land since before the enforcement notice was issued under that Part;

(b)did not have a copy of the enforcement notice served on him under that Part; and

(c)satisfies the court—

(i)that he did not know and could not reasonably have been expected to know that the enforcement notice had been issued; and

(ii)that his interests have been substantially prejudiced by the failure to serve him with a copy of it.

(3)Subject to subsection (4), the validity of a notice which has been served under section 215 on the owner and occupier of the land shall not, except by way of an appeal under Chapter II of Part VIII, be questioned in any proceedings whatsoever on either of the grounds specified in section 217(1)(a) or (b).

(4)Subsection (3) shall not prevent the validity of such a notice being questioned on either of those grounds in proceedings brought under section 216 against a person on whom the notice was not served, but who has held an interest in the land since before the notice was served on the owner and occupier of the land, if he did not appeal against the notice under that Chapter.

F6(5). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

F6(6). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

Modifications etc. (not altering text)

C2S. 285: power to modify conferred (11.3.1992 so far as to confer on the Secretary of State a power to impose on him a duty to make regulations, or make provision with respect to the exercise of any such power or duty, 1.6.1992 so far as not already in force) by Planning (Hazardous Substances) Act 1990 (c. 10, SIF 123:1), s. 25(1)(b); S.I. 1992/725, arts. 2, 3

C3S. 285 applied (with modifications) (1.6.1992) by S.I. 1992/656, reg. 22(1), Sch. 4 Pt. 4

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 13 para. 16(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 14 para. 9(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

C4S. 285(1)(2) applied (with modifications) (27.7.1992) by S.I. 1992/1562, reg. 2, Sch.

286 Challenges to validity on ground of authority’s powers.E+W

(1)The validity of any permission, determination or certificate granted, made or issued or purporting to have been granted, made or issued by a local planning authority in respect of—

(a)an application for planning permission;

F7(b). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(c)an application for [F8F9 a certificate under section 191 or 192];

(d)an application for consent to the display of advertisements under section 220; or

(e)a determination under section 302 or Schedule 15,

shall not be called in question in any legal proceedings, or in any proceedings under this Act which are not legal proceedings, on the ground that the permission, determination or certificate should have been granted, made or given by some other local planning authority.

(2)The validity of any order under section 97 revoking or modifying planning permission, any order under section 102 or paragraph 1 of Schedule 9 requiring discontinuance of use, or imposing conditions on continuance of use, or requiring the alteration or removal of buildings or works, or any enforcement notice under section 172 or stop notice under section 183 [or a breach of condition notice under section 187A], being an order or notice purporting to have been made, issued or served by a local planning authority, shall not be called in question in any such proceedings on the ground—

(a)in the case of an order or notice purporting to have been made, issued or served by a district planning authority, that they failed to comply with paragraph 11(2) of Schedule 1;

(b)in the case of an order or notice purporting to have been made, issued or served by a county planning authority, that they had no power to make, issue or serve it because it did not relate to a county matter within the meaning of that Schedule.

Textual Amendments

Modifications etc. (not altering text)

C6Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 13 para. 16(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 14 para. 9(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

287 Proceedings for questioning validity of development plans and certain schemes and orders.E+W

[F10(1)This section applies to—

(a)a simplified planning zone scheme or an alteration of such a scheme;

(b)an order under section 247, 248, 249, 251, 257, 258 or 277,

and anything falling within paragraphs (a) and (b) is referred to in this section as a relevant document.

(2)A person aggrieved by a relevant document may make an application to the High Court on the ground that—

(a)it is not within the appropriate power, or

(b)a procedural requirement has not been complied with.

(3)The High Court may make an interim order suspending the operation of the relevant document—

(a)wholly or in part;

(b)generally or as it affects the property of the applicant.

(3A)Subsection (3B) applies if the High Court is satisfied—

(a)that a relevant document is to any extent outside the appropriate power;

(b)that the interests of the applicant have been substantially prejudiced by a failure to comply with a procedural requirement.

(3B)The High Court may quash the relevant document—

(a)wholly or in part;

(b)generally or as it affects the property of the applicant.

(3C)An interim order has effect until the proceedings are finally determined.

(3D)The appropriate power is—

(a)in the case of a simplified planning zone scheme or an alteration of the scheme, Part III;

(b)in the case of an order under section 247, 248, 249, 251, 257, 258 or 277, the section under which the order is made.]

(4)An application under this section must be made within six weeks from the relevant date.

(5)For the purposes of subsection (4) the relevant date is—

(a)F11. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

(b)in the case of an application F12. . . in respect of a simplified planning zone scheme or an alteration of such a scheme, the date of the publication of the first notice of the approval or adoption of the scheme or alteration required by regulations under paragraph 13 of Schedule 7,

(c)in the case of an application F12. . . in respect of an order under section 247, 248, 249, or 251, the date on which the notice required by section 252(10) is first published,

(d)in the case of an application F12. . . in respect of an order under section 257 or 258, the date on which the notice required by paragraph 7 of Schedule 14 is first published in accordance with that paragraph,

(e)in the case of an application F12. . . in respect of an order under section 277, the date on which the notice required by subsection (6) of that section is first published;

but subject, in the case of those orders mentioned in paragraphs (c) and (e) to which section 292 applies, to that section.

(6)F13. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Textual Amendments

F10S. 287(1)-(3D) substituted for s. 287(1)-(3) (28.9.2004 for E. and 15.10.2005 for W.) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 118, 121, Sch. 6 para. 9(2) (with s. 111); S.I. 2004/2202, art. 2(h) (subject to transitional provisions and savings in art.4); S.I. 2005/2847, art. 2 (subject to transitional provisions and savings in art. 3)

F11S. 287(5)(a) repealed (28.9.2004 for E. and 15.10.2005 for W.) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 118, 120, 121, Sch. 6 para. 9(3)(a), Sch. 9 (with s. 111); S.I. 2004/2202, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 4); S.I. 2005/2847, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 3)

F12Words in s. 287(5)(b)-(e) repealed (28.9.2004 for E. and 15.10.2005 for W.) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 118, 120, 121, Sch. 6 para. 9(3)(b), Sch. 9 (with s. 111); S.I. 2004/2202, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 4); S.I. 2005/2847, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 3)

F13Words in s. 287(6) repealed (28.9.2004 for E. and 15.10.2005 for W.) by Planning and Compulsory Purchase Act 2004 (c. 5), s. 118, 120, 121, Sch. 6 para. 9(4), Sch. 9 (with s. 111); S.I. 2004/2202, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 4); S.I. 2005/2847, art. 2, Sch. 1 (subject to transitional provisions and savings in art. 3)

Modifications etc. (not altering text)

C7Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 13 para. 16(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 14 para. 9(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

S. 287 applied (with modifications) (1.4.1996) by 1994 c. 19, s. 66)7), Sch. 17 Pt. II para. 16(2)(5) (with ss. 54(5)(7), 55(5), Sch. 17 paras. 22(1), 23(2)); S.I. 1996/396, art. 4, Sch. 2

C8S. 287, as it continues to have effect by virtue of S.I. 2005/2847 art. 3(3), amended (prosp.) by Planning Act 2008 (c. 29), ss. 186, 241

288 Proceedings for questioning the validity of other orders, decisions and directions.E+W

(1)If any person—

(a)is aggrieved by any order to which this section applies and wishes to question the validity of that order on the grounds—

(i)that the order is not within the powers of this Act, or

(ii)that any of the relevant requirements have not been complied with in relation to that order; or

(b)is aggrieved by any action on the part of the Secretary of State to which this section applies and wishes to question the validity of that action on the grounds—

(i)that the action is not within the powers of this Act, or

(ii)that any of the relevant requirements have not been complied with in relation to that action,

he may make an application to the High Court under this section.

(2)Without prejudice to subsection (1), if the authority directly concerned with any order to which this section applies, or with any action on the part of the Secretary of State to which this section applies, wish to question the validity of that order or action on any of the grounds mentioned in subsection (1), the authority may make an application to the High Court under this section.

(3)An application under this section must be made within six weeks from the date on which the order is confirmed (or, in the case of an order under section 97 which takes effect under section 99 without confirmation, the date on which it takes effect) or, as the case may be, the date on which the action is taken.

(4)This section applies to any such order as is mentioned in subsection (2) of section 284 and to any such action on the part of the Secretary of State as is mentioned in subsection (3) of that section.

(5)On any application under this section the High Court—

(a)may, subject to subsection (6), by interim order suspend the operation of the order or action, the validity of which is questioned by the application, until the final determination of the proceedings;

(b)if satisfied that the order or action in question is not within the powers of this Act, or that the interests of the applicant have been substantially prejudiced by a failure to comply with any of the relevant requirements in relation to it, may quash that order or action.

(6)Paragraph (a) of subsection (5) shall not apply to applications questioning the validity of tree preservation orders.

(7)In relation to a tree preservation order, or to an order made in pursuance of section 221(5), the powers conferred on the High Court by subsection (5) shall be exercisable by way of quashing or (where applicable) suspending the operation of the order either in whole or in part, as the court may determine.

(8)References in this section to the confirmation of an order include the confirmation of an order subject to modifications as well as the confirmation of an order in the form in which it was made.

(9)In this section “the relevant requirements”, in relation to any order or action to which this section applies, means any requirements of this Act or of the M1Tribunals and Inquiries Act [F141992], or of any order, regulations or rules made under this Act or under that Act which are applicable to that order or action.

(10)Any reference in this section to the authority directly concerned with any order or action to which this section applies—

(a)in relation to any such decision as is mentioned in section 284(3)(f), is a reference to the council on whom the notice in question was served and, in a case where the Secretary of State has modified such a notice, wholly or in part, by substituting another local authority or statutory undertakers for that council, includes a reference to that local authority or those statutory undertakers;

(b)in any other case, is a reference to the authority who made the order in question or made the decision or served the notice to which the proceedings in question relate, or who referred the matter to the Secretary of State, or, where the order or notice in question was made or served by him, the authority named in the order or notice.

Textual Amendments

F14Word in s. 288(9) substituted (1.10.1992) by Tribunals and Inquiries Act 1992 (c. 53), ss. 18(1), 19(2), Sch. 3 para. 25

Modifications etc. (not altering text)

C9S. 288 extended (25.9.1991) by Planning and Compensation Act 1991 (c. 34, SIF 123:1), s. 22, Sch. 2 para. 9 (3) (with s. 84(5)); S.I. 1991/2067, art. 3 (subject to art. 4)

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 13 para. 16(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

Ss. 284-288 modified (1.11.1995) by 1995 c. 25, s. 96, Sch. 14 para. 9(4) (with ss. 7(6), 115, 117); S.I. 1995/2765, art. 2

S. 288 modified (2.10.1995) by S.I. 1995/2558, reg. 13

C10S. 288 applied (28.9.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 58(3), 121 (with s. 111); S.I. 2004/2202, art. 3 (subject to transitional provisions and savings in art. 4)

Marginal Citations

289 Appeals to High Court relating to enforcement notices and notices under s. 207. E+W

(1)Where the Secretary of State gives a decision in proceedings on an appeal under Part VII against an enforcement notice the appellant or the local planning authority or any other person having an interest in the land to which the notice relates may, according as rules of court may provide, either appeal to the High Court against the decision on a point of law or require the Secretary of State to state and sign a case for the opinion of the High Court.

(2)Where the Secretary of State gives a decision in proceedings on an appeal under Part VIII against a notice under section 207, the appellant or the local planning authority or any person (other than the appellant) on whom the notice was served may, according as rules of court may provide, either appeal to the High Court against the decision on a point of law or require the Secretary of State to state and sign a case for the opinion of the High Court.

(3)At any stage of the proceedings on any such appeal as is mentioned in subsection (1), the Secretary of State may state any question of law arising in the course of the proceedings in the form of a special case for the decision of the High Court.

(4)A decision of the High Court on a case stated by virtue of subsection (3) shall be deemed to be a judgment of the court within the meaning of section 16 of the M2Supreme Court Act 1981 (jurisdiction of the Court of Appeal to hear and determine appeals from any judgment of the High Court).

[F15(4A)In proceedings brought by virtue of this section in respect of an enforcement notice, the High Court or, as the case may be, the Court of Appeal may, on such terms if any as the Court thinks fit (which may include terms requiring the local planning authority to give an undertaking as to damages or any other matter), order that the notice shall have effect, or have effect to such extent as may be specified in the order, pending the final determination of those proceedings and any re-hearing and determination by the Secretary of State.

F15(4B)Where proceedings are brought by virtue of this section in respect of any notice under section 207, the notice shall be of no effect pending the final determination of those proceedings and any re-hearing and determination by the Secretary of State.]

(5)In relation to any proceedings in the High Court or the Court of Appeal brought by virtue of this section the power to make rules of court shall include power to make rules—

(a)prescribing the powers of the High Court or the Court of Appeal with respect to the remitting of the matter with the opinion or direction of the court for re-hearing and determination by the Secretary of State; and

(b)providing for the Secretary of State, either generally or in such circumstances as may be prescribed by the rules, to be treated as a party to any such proceedings and to be entitled to appear and to be heard accordingly.

[F16(5A)Rules of court may also provide for the High Court or, as the case may be, the Court of Appeal to give directions as to the exercise, until such proceedings in respect of an enforcement notice are finally concluded and any re-hearing and determination by the Secretary of State has taken place, of any other powers in respect of the matters to which such a notice relates.

(6)No proceedings in the High Court shall be brought by virtue of this section except with the leave of that Court and no appeal to the Court of Appeal shall be so brought except with the leave of the Court of Appeal or of the High Court.]

(7)In this section “decision” includes a direction or order, and references to the giving of a decision shall be construed accordingly.

Textual Amendments

F15 S. 289(4A)(4B) inserted (2.1.1992) by Planning and Compensation Act 1991 (c. 34, SIF 123:1), s. 6(4) (with s. 84(5)); S.I. 1991/2905, art. 3 (subject to art. 4)

F16S. 289(5A)(6) substituted for s. 289(6) (25.11.1991 for certain purposes and otherwise 2.1.1992) by Planning and Compensation Act 1991 (c. 34, SIF 123:1), s. 6(5) (with s. 84(5)); S.I. 1991/2728, art. 2; S.I. 1991/2905, art.3 (subject to art. 4)

Modifications etc. (not altering text)

C12S. 289: power to modify conferred (11.3.1992 so far as to confer on the Secretary of State a power to impose on him a duty to make regulations, or make provision with respect to the exercise of any such power or duty, 1.6.1992 so far as not already in force) by Planning (Hazardous Substances) Act 1990 (c. 10, SIF 123:1), s. 25(1)(b); S.I. 1992/725, arts. 2, 3

C13S. 289 applied (with modifications) (1.6.1992) by S.I. 1992/656, reg. 22(1), Sch. 4 Pt. 4

S. 289 applied (with modifications) (27.7.1992) by S.I. 1992/1562, reg. 2, Sch.

C14S. 289 applied (28.9.2004) by Planning and Compulsory Purchase Act 2004 (c. 5), ss. 58(4), 121 (with s. 111); S.I. 2004/2202, art. 3 (subject to transitional provisions and savings in art. 4)

Marginal Citations

F17290. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E+W

291 Special provisions as to decisions relating to statutory undertakers.E+W

In relation to any action which—

(a)apart from the provisions of Part XI would fall to be taken by the Secretary of State and, if so taken, would be action falling within section 284(3); but

(b)by virtue of that Part, is required to be taken by the Secretary of State and the appropriate Minister,

the provisions of sections 284 and 288 shall have effect (subject to section 292) as if any reference in those provisions to the Secretary of State were a reference to the Secretary of State and the appropriate Minister.

292 Special provisions as to orders subject to special parliamentary procedure.E+W

(1)Where an order under section 247, 248, 249 or 277 is subject to special parliamentary procedure, then—

(a)if the order is confirmed by Act of Parliament under section 6 of the M3Statutory Orders (Special Procedure) Act 1945, sections 284 and 287 shall not apply to the order;

(b)in any other case, section 287 shall have effect in relation to the order as if, in subsection (4) of that section, for the reference to the date there mentioned there were substituted a reference to the date on which the order becomes operative under section 6 of that Act (“the operative date”).

(2)Where by virtue of Part XI any such action as is mentioned in section 291 is required to be embodied in an order, and that order is subject to special parliamentary procedure, then—

(a)if the order in which the action is embodied is confirmed by Act of Parliament under section 6 of that Act, sections 284 and 288 shall not apply;

(b)in any other case, section 288 shall apply with the substitution for any reference to the date on which the action is taken of a reference to the operative date.

Marginal Citations

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open The Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act without Schedules as a PDF

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open the Whole Act without Schedules

The Whole Act without Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Point in Time: This becomes available after navigating to view revised legislation as it stood at a certain point in time via Advanced Features > Show Timeline of Changes or via a point in time advanced search.

Close

See additional information alongside the content

Geographical Extent: Indicates the geographical area that this provision applies to. For further information see ‘Frequently Asked Questions’.

Show Timeline of Changes: See how this legislation has or could change over time. Turning this feature on will show extra navigation options to go to these specific points in time. Return to the latest available version by using the controls above in the What Version box.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Timeline of Changes

This timeline shows the different points in time where a change occurred. The dates will coincide with the earliest date on which the change (e.g an insertion, a repeal or a substitution) that was applied came into force. The first date in the timeline will usually be the earliest date when the provision came into force. In some cases the first date is 01/02/1991 (or for Northern Ireland legislation 01/01/2006). This date is our basedate. No versions before this date are available. For further information see the Editorial Practice Guide and Glossary under Help.

Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources